| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.2 L+₹335.12 (0.06%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MOHAMED ABDUL RAHMAN L1 | K.Moorthy L2 |
|---|---|---|---|---|---|
| 1.00Construction of Retaining Wall at West side of AD Colony in Sayanapuram Panchayat | |||||
| 2.00 | Earth work excavation in all class of soil with initial lead and lift as per ss 20 B for foundation | 37 | sqm | 240 ₹8,880 Lowest | 245 ₹9,065 |
| 3.00 | CC 1:4:8 Mix using 40mm metal including cost and conveyance and labour charges etc complete. | 61.05 | cum | 5,374 ₹3,28,083 Lowest | 5,375 ₹3,28,144 |
| 4.00 | Supply and erecting centering charges including cost and conveyance and labour charges etc complete. | 61.05 | cum | 514 ₹31,380 Lowest | 514.5 ₹31,410 |
| 5.00 | CC 1:3:6 Mix using 40mm metal including cost and conveyance and labour charges etc complete. | 12.21 | sqm | 6,106 ₹74,554 Lowest | 6,106.61 ₹74,562 |
| 6.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 79,721.46 ₹79,721.46 Lowest | 79,772.58 ₹79,772.58 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
30 Oct 2025, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (BP)
BLOCK DEVELOPMENT OFFICE Nemili
Construction of Retaining Wall at West side of AD Colony in Sayanapuram Panchayat
2025_RDTN_618111_1
A3/2972/2025
Open Tender
Civil Works
Item Rate
BLOCK DEVELOPMENT OFFICE
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹10,000
Yes
8 Nov 2025
28 Oct 2025
30 Oct 2025
28 Oct 2025
30 Oct 2025
28 Oct 2025
Construction of Retaining Wall at West side of AD Colony in Sayanapuram Panchayat
Earth work excavation in all class of soil with initial lead and lift as per ss 20 B for foundation
CC 1:4:8 Mix using 40mm metal including cost and conveyance and labour charges etc complete.
Supply and erecting centering charges including cost and conveyance and labour charges etc complete.
CC 1:3:6 Mix using 40mm metal including cost and conveyance and labour charges etc complete.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.29 MB
BOQ_738724.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .