Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5 LAccepted-AOC 609 J BLOK JAHANGIR PURI JAHANGIR PURI JAHANGIR PURI NORTH WEST DELHI DELHI 110033 | NORTH DELHI | DELHI | 110033 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹4.2 L+₹5,479.15 (1.32%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | BALAMURUGAN ENTERPRISES L2 | RK ENGINEERING L1 |
|---|---|---|---|---|---|
| 1.00 | Desilting the exsiting storm water drain | 20 | m3 | 125 ₹2,500 | 111 ₹2,220 Lowest |
| 2.00 | Dismantling the damged cement concrete | 13 | m3 | 600 ₹7,801.44 | 534 ₹6,943.28 Lowest |
| 3.00 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 cum. in volume including rough dressing and dumping the excavated materials away from work site manually within 10m initial lead and 2m initial lift as per the direction of Engineer-in-charge for Drain. | 85 | m3 | 135 ₹11,475 Lowest | 135 ₹11,475 Lowest |
| 4.00 | Cement concrete 1:4:8 (one cement, four sand and eight aggregate) using 40mm hard broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted etc., complete complying with standard specification. | 11 | m3 | 5,590 ₹61,490 Lowest | 5,590 ₹61,490 Lowest |
| 5.00 | Supplying and erecting SHUTTTERING including necessary supports for plane surfaces etc, using mild steel sheets and BG 10 stiffened with welded mild steel angles for boarding supported by Casuarinas props at suitable intervals etc., complete complying with standard specification and as directed. | 180 | m2 | 275 ₹49,500 | 270 ₹48,600 Lowest |
| 6.00 | Cement concrete 1:3:6 (one cement, three sand and six aggregate ) using 20mm hard broken granite stone jelly for all CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 32 | m3 | 6,319 ₹2,02,208 Lowest | 6,319 ₹2,02,208 Lowest |
| 7.00 | Supplying and erecting CENTERING for sides and soffits including supports and strutting up to 3.29 m high for plane surfaces such as RCC SLABS, RECTANGULAR BEAMS, TEE or ELL BEAMS, LINTELS, BED BLOCKS. STAIRCASE WAIST, LANDING SLAB, LANDING BEAM and CANOPY etc., in all floors with all cross bracings using mild steel sheets of size 90cm X 60cm and BG 10 stiffened with welded mild steel angles of size 25mm * 25mm * 3mm for boarding laid over country wood joists of size 10cm X 6.50cm spaced at about 90cm centre to centre and supported by Casuarinas props of 10cm to 13cm dia spaced at 75cm centre to centre etc., complete and as directed. | 8 | m2 | 1,223 ₹9,784 Lowest | 1,223 ₹9,784 Lowest |
| 8.00 | Cement concrete 1:1.5:3 (one cement, one and a half sand and three aggregate) using 20mm hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing, vibrator charges etc., complete and also including fixing fan clamps and fixtures in RCC works wherever necessary as directed by departmental officer etc., complete. | 2 | m3 | 9,373 ₹18,727.25 Lowest | 9,373 ₹18,727.25 Lowest |
| 9.00 | PLASTERING with cement mortar 1:5(one cement and five sand by volume) 12mm thick for all internal/external surfaces like super structure, rainwater, ducts, elevation in all floors complying with standard specifications. | 37 | m2 | 300 ₹11,100 | 292 ₹10,804 Lowest |
| 10.00 | Supplying, fabricating and placing in position TMT/CTD rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification. | 2 | Qtl | 9,321 ₹18,642 Lowest | 9,321 ₹18,642 Lowest |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
16 Jul 2025, 3:00 pmClosed
The Assistant Commissioner,
North Zone, Coimbatore Corporation, Balasundaram Road,Oppsite Womens Polytechnic
Reconstruction of Storm Water Drain and Culvert at Nallampalayam Main road near Nellai Sweets in Ward no.18, North Zone.
2025_MAWS_580196_9
E2/NorthZone/2025-26
Open Tender
Civil Works
Works
90 days
North Zone, Coimbatore Corporation
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹5,000
13 Oct 2026
11 Jul 2025
17 Jul 2025
11 Jul 2025
16 Jul 2025
11 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .