| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.3 LAccepted-AOC | 1 | Accepted-AOC The lowest rate quoted by the contractor Dhamodharan Contractor Works | |
| 2 | 2₹7.4 L+₹3,661.26 (0.50%)Rejected-Finance | 2 | Rejected-Finance Admitted |
| Sl No | Description | Qty | Unit | Dhamodharan Contractor Works L1 | RAMASAMY KANNAN L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 189 | cum | 6 ₹1,134 Lowest | 9 ₹1,701 |
| 2.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 236.25 | cum | 140 ₹33,075 Lowest | 143 ₹33,783.75 |
| 3.00 | Providing and Laying well Gravel Soling to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete. | 194.25 | cum | 475 ₹92,268.75 Lowest | 479 ₹93,045.75 |
| 4.00 | Construction of Granular Sub base by Providing well graded material (25 mm to 4.75 mm IRC HBG Metal @ 65% ,4.75 to 2.36 mm IRC HBG Metal @20%2.36 mm Below IRC HBM Metal @15 % )&(the Material Passing 425 Microns Sieve Shall Have Liquid Limit and Plasticity index Not More Than 25&6% repectively )Spreading in Uniform Layars With Motor Grader on Prepared Surface Mixing By mix in place Method With Rotovator at OMC and compacting With three Wheel 80-100KN Capacity and Finished in accordance with the Requirements of the Specification and thickness as per approved Plan or as directed by the Engineer (Mix -in -Place Method ). | 131.25 | cum | 1,894 ₹2,48,587.5 Lowest | 1,899 ₹2,49,243.75 |
| 5.00 | Providing and laying WBM 75mm compacted thickness with grade II metal using 1 cum of 75-22.4mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed. | 98.44 | cum | 2,508 ₹2,46,887.52 Lowest | 2,512 ₹2,47,281.28 |
| 6.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount | 1,11,951.5 ₹1,11,951.5 Lowest | 1,12,510 ₹1,12,510 |
Tender Value
₹7.4 L
EMD Value
₹7,420
Closing Date
2 Feb 2026, 3:00 pmClosed
Block Development Officer VP Acharapakkam
Block Development Office VP Acharapakkam
Providing WBM Road ro Irular colony BG Road to Orathy in Orathy panchayat in Acharapakkam Panchayat Union in Chengalpattu District under MINES
2026_RDTN_647239_1
DIPR/3990/2025 A2
Open Tender
Civil Works
Item Rate
90 days
Orathy
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,420
Yes
Block Development Office VP Acharapakkam
7 Mar 2026
27 Jan 2026
2 Feb 2026
27 Jan 2026
2 Feb 2026
27 Jan 2026
27 Jan 2026
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and Laying well Gravel Soling to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Construction of Granular Sub base by Providing well graded material (25 mm to 4.75 mm IRC HBG Metal @ 65% ,4.75 to 2.36 mm IRC HBG Metal @20%2.36 mm Below IRC HBM Metal @15 % )&(the Material Passing 425 Microns Sieve Shall Have Liquid Limit and Plasticity index Not More Than 25&6% repectively )Spreading in Uniform Layars With Motor Grader on Prepared Surface Mixing By mix in place Method With Rotovator at OMC and compacting With three Wheel 80-100KN Capacity and Finished in accordance with the Requirements of the Specification and thickness as per approved Plan or as directed by the Engineer (Mix -in -Place Method ).
Providing and laying WBM 75mm compacted thickness with grade II metal using 1 cum of 75-22.4mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_775900.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
Technical.pdf
Tender Documents • 1.22 MB
BOQ_775900.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .