| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹53.1 CrAdmitted-Finance | -15.81% | ₹53.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹54.9 Cr+₹1.8 Cr (3.47%)Admitted-Finance | -12.89% | ₹54.9 Cr+₹1.8 Cr (3.47%) | L2 | Admitted-Finance |
| 3 | L3₹56.8 Cr+₹3.7 Cr (6.91%)Admitted-Finance | -9.99% | ₹56.8 Cr+₹3.7 Cr (6.91%) | L3 | Admitted-Finance |
| 4 | L4₹57.8 Cr+₹4.7 Cr (8.88%)Admitted-Finance | -8.33% | ₹57.8 Cr+₹4.7 Cr (8.88%) | L4 | Admitted-Finance |
| 5 | L5₹62.9 Cr+₹9.8 Cr (18.4%)Admitted-Finance | -0.30% | ₹62.9 Cr+₹9.8 Cr (18.4%) | L5 | Admitted-Finance |
Tender Value
₹63.1 Cr
EMD Value
₹1.3 Cr
Closing Date
29 May 2026, 12:00 pmClosed
CE MeDA
CE Office MeDA Campus, Meerut
Road widening work from Jail Chungi to Bhavanpur Eastern Bypass Intersection in District Jail.
2026_MDAUP_1146034_1
35153_22(10) Dated 30 April 2026
Open Tender
Civil Works
Percentage
545 days
Meerut
Tender Fee, EMD and other documents as per the Tender/NIT
2 documents required · 2 mandatory
₹5,700
As per the Tender/NIT
₹1.3 Cr
8 Jul 2026
7 May 2026
30 May 2026
7 May 2026
29 May 2026
19 May 2026
7 May 2026 - 18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (i) Cleaning jungle including up rooting of rank,
vegetations grass, push, wood trees and amplings
of grith upto 30 cms. measured at a height of 1
M. above ground level and removal of rubbish
up to a distance of 50M. out side the periphery
of area cleared. Si.no. 259 | 78,075.01 | Sqm | 3.04 | ₹2,37,348.03 |
| 2 | Excavation for roadwork in soil with hydraulic
excavator including cutting and loading in
tippers, trimming bottom and side slopes, in
accordance with requirements of lines, grades
and cross sections, and transporting to the
embankment location within all lifts and lead
upto 1000m | 42,135.24 | Cum | 85.5 | ₹36,02,563.02 |
| 3 | Dismantling reinforced cement concrete
including stacking of materials as directed by
engineer incharge within a distance of 60
meters.al as per s.i.no.694. | 2,200.76 | Cum | 546.25 | ₹12,02,165.15 |
| 4 | Construction of embankment/ Patri with
approved material obtained from borrow pits
with all lifts and leads, transporting to
site,(Cartage 3.00 km) spreading, grading to
required slope and compacting to meet
requirement of table 300-2. | 1,69,849.28 | Cum | 191.43 | ₹3,25,14,247.67 |
| 5 | Construction of Embankment with Material
Deposited from Roadway Cutting Construction of
embankment with approved materials deposited
at site from roadway cutting and excavation from
drain and foundation of other structures graded
and compacted to meet requirement of table 300-
2 | 14,938.74 | Cum | 62.23 | ₹9,29,637.79 |
| 6 | Construction of granular sub-base by providing
close graded material, spreading in uniform
layers with motor grader on prepared surface,
mixing by mix in place method with rotavator at
OMC, and compacting with vibratory roller to
achieve the desired density, complete as per
clause 401. | 16,945.3 | Cum | 3,099.42 | ₹5,25,20,601.73 |
| 7 | Providing, laying, spreading and compacting
graded stone aggregate to wet mix macadam
specification including premixing the Material
with water at OMC in mechanical mix plant
carriage of mixed Material by tipper to site,
laying in uniform layers with paver in sub- base /
base course on well prepared surface and
compacting with vibratory roller to achieve the
desired density. | 13,887.03 | Cum | 3,659.97 | ₹5,08,26,113.19 |
| 8 | Providing and applying primer coat with SS2
bitumen emulsion on prepared surface of
granular Base including clearing of road surface
and spraying primer at the rate of 0.7 kg/sqm
using mechanical means. | 81,739 | Sqm | 36.01 | ₹29,43,421.39 |
| 9 | In Widening With VG-40 | 1,937.89 | Cum | 9,869.34 | ₹1,91,25,695.29 |
| 10 | Recycling pavement by cold Mixing of existing
bituminous layers, planning the surface, cold
Milling, reclaiming excavated material to the
extent of 30 percent of the required quantity,
hauling and stock piling the reclaimed material
near the central recycling plant after carrying out
necessary checks and evaluation , fresh material
including rejuvenators as required , mixing in a
hot mix plant transporting and laying at site and
compacting to the required grade , level and
thickness all all as specified clause 519 (Grade 2) | 2,724.75 | Sqm | 8,053.72 | ₹2,19,44,373.57 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
JailchungiEBID.pdf
Tender Documents • 0.82 MB
BOQ_2142824.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .