Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.1 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.2 L+₹12,072.29 (3.86%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹3.8 L+₹69,503.57 (22.2%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹3.9 L
EMD Value
₹39,069
Closing Date
13 Aug 2026, 12:00 pmClosed
CHIEF ENGINEER CIVIL
NAGAR NIGAM AGRA
Work involving the installation of interlocking tiles in the lanes of Wards 41 and 39, as well as the repair and painting of dividers, under the Swachh Survekshan initiative for Zone-3 (Tajganj).
2026_DOLBU_1175039_1
10-07-2026/NAGAR NIGAM AGRA/24-07-2026/20
Open Tender
Construction Works
Percentage
30 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
NAGAR NIGAM
₹39,069
25 Sept 2026
6 Aug 2026
13 Aug 2026
6 Aug 2026
13 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of old interlocking tiles payment including stacking of serviceable material and disposal of unserviceable material within lead of 50m as per direction of engineer in charge. (NS) | 184.92 | Sqm | 70 | ₹12,944.4 |
| 2 | Providing & laying of G.S.B with graded material including spreading dressing watering and ramming etc. All complete.(Non Scheduled) | 18.49 | Cum | 2,704 | ₹49,996.96 |
| 3 | Class-150 (Non Modulao brick work in 1 :4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the wor ( Chapter No. 06 Sr.No. 2) | 22.4 | Cum | 5,650 | ₹1,26,560 |
| 4 | 12 mm cement plaster of mix : 1:4(1 cement: 4 fine sand) | 115.56 | Sqm | 200 | ₹23,112 |
| 5 | Supply & fixing of pre-cast M-30 cement concrete RUBBER MOLD INTERLOCKING TILES over 40mm thick local sand bed, with 3mm thick joints filled with local sand including levelling, tempering and sweeping etc., interlocking bricks will be as description given in direction issued by the IRCSC-03-2004 and should be ISI marked all complete. 80mm thick, Strength should not less than M-30. (tiles shape decided by Engineer-in-charge with ISI Mark) (Chapter No.20 Si.No.14-E) | 184.92 | Sqm | 834 | ₹1,54,223.28 |
| 6 | Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 llth} sqm over and including priming coat of exterior primer applied @ 2 20 kg/10 sqm) supply of all labour material and T&P required for proper completion of work | 140.1 | Sqm | 140 | ₹19,614 |
| 7 | Cartage of Ballast, Kankar, Coal, Grit or Sand etc. including loading & unloading but excluding stacking | 18.49 | Cum | 230.1 | ₹4,254.55 |
| 8 | Sub Total (A) | 1 | Rs | 1 | ₹1 |
| 9 | Add / Deduction For Estimate Figure Amount Match | 1 | Rs | 16.19 | ₹16.19 |
| 10 | Grand Total | 1 | Rs | 1 | ₹1 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.02 MB
BOQ_2208059.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .