| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAccepted-AOC | ₹3.1 Cr | L1 | Accepted-AOC L-1 BRB Constructions Lowest Rate |
| 2 | L2₹3.3 CrRejected-AOC | ₹3.3 Cr | L2 | Rejected-AOC L-2 N R M RAGHAVAN CONSTRUCTION Highest Rate |
| Sl No | Description | Qty | Unit | N R M RAGHAVAN CONSTRUCTION L2 | BRB Constructions L1 |
|---|---|---|---|---|---|
| 1.00Sholinghur Block | |||||
| 2.00Strenghthening of the Road from S.K. Road to B P Road (Via) Soorai, Vishalalashi puram, Soorai Mottur km 0/0-4/80 (R-54) in Sholinghur Block at Ranipet District. | |||||
| 3.00 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 5,010.05 | Sq.m | 10 ₹50,100.50 | 6 ₹30,060.30 |
| 4.00 | Picking 5 Cm to 10 mm of existing wornout BT / WBM Surface sectioning in all labour charges etc complete | 2,934 | Sq.m | 25 ₹73,350 | 23.65 ₹69,389.10 |
| 5.00 | Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A. | 2,048.87 | cu.m | 145 ₹3.0 L | 140 ₹2.9 L |
| 6.00 | Collection of Carted earth for Basecourse And side berms and labour charges for filling etc complete | 867.46 | cu.m | 150 ₹1.3 L | 145 ₹1.3 L |
| 7.00 | Providing & Laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges rentals for machinery, fuel and all other incidental charges etc, completed as per clause of MORTH Rev-5. | 1,324.13 | cu.m | 2,400 ₹31.8 L | 2,342 ₹31.0 L |
| 8.00 | Applying Prime coat over WMM surface using 7 kgs of bitumen emulsion (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5. | 4,327.5 | Sq.m | 92 ₹4.0 L | 86 ₹3.7 L |
| 9.00 | Applying Tack coat over WMM surface using 2.50 kgs of bitumen emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5. | 4,327.5 | Sq.m | 22 ₹95,205 | 20 ₹86,550 |
| 10.00 | Applying Tack coat over WMM surface using3.0 kgs of bitumen emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5. | 8,610 | sqm | 35 ₹3.0 L | 34.5 ₹3.0 L |
Tender Value
₹3.1 Cr
EMD Value
₹3.2 L
Closing Date
20 Feb 2026, 3:00 pmClosed
Project Director
Project Director DRDA-Ranipet
Strengthening of the road from SK Road to BP Road Via Soorai, Vishalakshipuram, Soorai Mottur Km 0/0 to 4/80 R-54 Sholinghur Block, Ranipet District in NABARD RIDF 2026-27
2026_RDTN_657094_1
A3/258/2026
Open Tender
Civil Works
180 days
DRDA-Ranipet
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3.2 L
14 May 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
Sholinghur Block
Strenghthening of the Road from S.K. Road to B P Road (Via) Soorai, Vishalalashi puram, Soorai Mottur km 0/0-4/80 (R-54) in Sholinghur Block at Ranipet District.
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Picking 5 Cm to 10 mm of existing wornout BT / WBM Surface sectioning in all labour charges etc complete
Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A.
Collection of Carted earth for Basecourse And side berms and labour charges for filling etc complete
Providing & Laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges rentals for machinery, fuel and all other incidental charges etc, completed as per clause of MORTH Rev-5.
Applying Prime coat over WMM surface using 7 kgs of bitumen emulsion (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5.
Applying Tack coat over WMM surface using 2.50 kgs of bitumen emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5.
Applying Tack coat over WMM surface using3.0 kgs of bitumen emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5.
BM (Grade-II) 50mm Thick Using VG30 Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Retro-Reflectorised Traffic Signs (with out definition board) Type - IV Providing and erecting of Retro - Reflector›sed Cautionary, Maridatory and Informatory signs {without definition board} made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTM D 4956 —09, specification and fixed over 2mm thick Aluminium sheet fixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2. 10m from the ground level to the bottom of the sign board and 0.6Om below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in Charge. High intensity Retro - Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67- 2012. The retro - reflective sheeting shall be covered under 7 3 ear warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2012 . ( as per MORT&H Specification No.801) equilateral triangular sign board
Provision for Hectometer stone
Provision for Guard stone
Providing KM Stone
SUPPLY AND FIXING OF HUME PIPES @ Ch 1360m
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, in hard stiff clay, stiff black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B
Supply and Filling m- sand including cost and conveyanceof all materials to work site and all labour charges etc.
Cement Concrete 1:2.5:5 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Cement Concrete 1:2:4 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supply and Fixing of NP3 RCC 900 mm Dia 2.50 m Hume pipe including cost and Conveyance etc., complete
Supply and Filling Gravel including cost and conveyanceof all materials to work site and all labour charges etc.
SUPPLY AND FIXING OF HUME PIPES @ Ch 1460m
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, in hard stiff clay, stiff black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B
Supply and Filling m- sand including cost and conveyanceof all materials to work site and all labour charges etc.
Cement Concrete 1:2.5:5 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Cement Concrete 1:2:4 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supply and Fixing of NP3 RCC 900 mm Dia 2.50 m Hume pipe including cost and Conveyance etc., complete
Supply and Filling Gravel including cost and conveyanceof all materials to work site and all labour charges etc.
Providing CC Pavement at Km 0/650-1/850
Earthwork excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete SS20B For Boxing including conveyance of sut earth away from site with average Lead etc., complete
Earthwork excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete SS20A
P.C.C 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all etc.. Complete
Supplying and erecting of Centering for all PCC items including cost and conveyance labour charges etc complete.
C.C 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all etc.. Complete
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
Hard bed side wall and CC Pavement Km 2/265-2/300
Earthwork excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete SS20A
P.C.C 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all etc.. Complete
Supplying and erecting of Centering for all PCC items including cost and conveyance labour charges etc complete.
C.C 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all etc.. Complete
C.C 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all etc.. Complete
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
Providing CC Pavement at Km 2/840-3/015
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
1st Year
2nd Year
3rd Year
4th Year
5th Year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.32 MB
8Technicalbid.pdf
Tender Documents • 1.34 MB
8Pricebid.pdf
Additional Documents • 0.90 MB
BOQ_788000.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid