Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.1 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹24.3 L+₹1.2 L (5.10%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S.KSM Engineering L1 | M/s. KSR Enterprises L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for dismantling & removal of journal door from mill for rectification/ replacement/ attending defects in journal assembly/bull ring segments/ bull ring clamping ring/grinding rollers/ journal skirt/ bowl hub assembly including cost of consumables and hire charges for Tools & Plants. | 9 | nos | 7,900 ₹71,100 Lowest | 8,200 ₹73,800 |
| 2.00 | Charges for removing of journal head assembly along with the roller for rectification/ replacement/ attending defects in journal assembly/ bull ring segments/ bull ring clamping ring/grinding rollers/journal skirt/bowl hub assembly including cost of consumables and hire charges for Tools & Plants. | 9 | nos | 15,600 ₹1,40,400 Lowest | 15,900 ₹1,43,100 |
| 3.00 | Charges for re-shifting the rectified/new grinding roller journal assembly with saddle from repair bay/work shop including hire charges for T&P's and cost of consumables. | 9 | nos | 8,100 ₹72,900 Lowest | 8,300 ₹74,700 |
| 4.00 | Charges for re-fixing the journal door after attending the breakdown works for rectification/ replacement/attending defects in journal assembly/bull ring segments/bull ring clamping ring/grinding rollers/journal skirt/bowl hub assembly including cost of consumables and hire charges for Tools & Plants. | 9 | nos | 7,800 ₹70,200 Lowest | 8,100 ₹72,900 |
| 5.00 | Charges for Journal bearing play test checking of reading, removal of journal upper housing, journal shaft with bearing, inspecition and cleaning including leading lifing, including cost of consumables and hire charges for Tools & Plants. | 9 | nos | 50,500 ₹4,54,500 Lowest | 52,000 ₹4,68,000 |
| 6.00 | Charges for dismantling the worn out upper and lower journal bearing and refixing the new/retrieved bearing by Cooling and fixing in upper Journal bearing and fixing the lower Journal bearing by cooling the bearings outer racer and heating the inner racer including leading, lifing, cost of consumables, dry ice and T&Ps. | 9 | nos | 87,000 ₹7,83,000 Lowest | 92,000 ₹8,28,000 |
| 7.00 | Charges for removal of worn out seal wear ring, metal clad oil seal, o ring from the journal assembly and assembling of new/rectified seal wear ring, metal clad oil seal, o ring in the journal shaft including cost of consumables and hire charges for Tools & Plants. | 9 | nos | 35,900 ₹3,23,100 Lowest | 38,000 ₹3,42,000 |
| 8.00 | Charges for checking the end ply of upper journal bearing, dimantling the bearing spacer, if necessary correction to be made and adding shims to reducing the journal bearing ply, including cost of consumables and hire charges for Tools & Plants. | 9 | nos | 21,200 ₹1,90,800 Lowest | 23,000 ₹2,07,000 |
| 9.00 | Charges for dismantling of pillow blocks / trunnion shaft end cap, removing wornout trunnion bushings, damaged end covers, cleaning, inspection, repairing of wornout sealing areas, end covers, retapping wornout threaded areas, changing of worn-out trunnion bushings and assembling, including cost of consumables and hire charges for T&Ps., | 18 | nos | 11,400 ₹2,05,200 Lowest | 12,200 ₹2,19,600 |
Tender Value
Refer Docs
EMD Value
₹19,800
Closing Date
3 Oct 2026, 2:00 pmClosed
SE M1
NCTPS II
NCTPS-II MI MPM - Unit-II - Mills 2A to 2J - Overhauling of released Roller Journal assembly / Readiness of Spare Journal assembly using new retrieved spares for a period of one year.
2026_EB_705931_1
NCTPS_II_UII_Spec_93_26_27
Open Tender
Maintenance Works
Works
NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹19,800
Yes
10 Oct 2026
19 Sept 2026
5 Oct 2026
19 Sept 2026
3 Oct 2026
19 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for dismantling & removal of journal door from mill for rectification/ replacement/ attending defects in journal assembly/bull ring segments/ bull ring clamping ring/grinding rollers/ journal skirt/ bowl hub assembly including cost of consumables and hire charges for Tools & Plants. | 9 | nos | - | - |
| 2 | Charges for removing of journal head assembly along with the roller for rectification/ replacement/ attending defects in journal assembly/ bull ring segments/ bull ring clamping ring/grinding rollers/journal skirt/bowl hub assembly including cost of consumables and hire charges for Tools & Plants. | 9 | nos | - | - |
| 3 | Charges for re-shifting the rectified/new grinding roller journal assembly with saddle from repair bay/work shop including hire charges for T&P's and cost of consumables. | 9 | nos | - | - |
| 4 | Charges for re-fixing the journal door after attending the breakdown works for rectification/ replacement/attending defects in journal assembly/bull ring segments/bull ring clamping ring/grinding rollers/journal skirt/bowl hub assembly including cost of consumables and hire charges for Tools & Plants. | 9 | nos | - | - |
| 5 | Charges for Journal bearing play test checking of reading, removal of journal upper housing, journal shaft with bearing, inspecition and cleaning including leading lifing, including cost of consumables and hire charges for Tools & Plants. | 9 | nos | - | - |
| 6 | Charges for dismantling the worn out upper and lower journal bearing and refixing the new/retrieved bearing by Cooling and fixing in upper Journal bearing and fixing the lower Journal bearing by cooling the bearings outer racer and heating the inner racer including leading, lifing, cost of consumables, dry ice and T&Ps. | 9 | nos | - | - |
| 7 | Charges for removal of worn out seal wear ring, metal clad oil seal, o ring from the journal assembly and assembling of new/rectified seal wear ring, metal clad oil seal, o ring in the journal shaft including cost of consumables and hire charges for Tools & Plants. | 9 | nos | - | - |
| 8 | Charges for checking the end ply of upper journal bearing, dimantling the bearing spacer, if necessary correction to be made and adding shims to reducing the journal bearing ply, including cost of consumables and hire charges for Tools & Plants. | 9 | nos | - | - |
| 9 | Charges for dismantling of pillow blocks / trunnion shaft end cap, removing wornout trunnion bushings, damaged end covers, cleaning, inspection, repairing of wornout sealing areas, end covers, retapping wornout threaded areas, changing of worn-out trunnion bushings and assembling, including cost of consumables and hire charges for T&Ps., | 18 | nos | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_848429.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .