Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹29,146Accepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹29,736+₹590 (2.02%)Rejected-Finance | 2 | Rejected-Finance Not being lowest | |
| 3 | 3₹32,450+₹3,304 (11.3%)Rejected-Finance | 3 | Rejected-Finance Not being lowest | |
| 4 | 4₹33,040+₹3,894 (13.4%)Rejected-Finance SINAI TRADING CORPORATION NO 12 4TH B CROSS MARUTHI NAGAR MADIWALA BENGALURU KARNATAKA 560068 UDYAM KR 03 0275166 | BENGALURU URBAN | KARNATAKA | 560068 | 4 | Rejected-Finance Not being lowest |
Tender Value
₹29,400
Closing Date
23 Apr 2020, 6:00 pmClosed
GE
GE (South)Bangalore
REDUCTION OF CMD FROM 160 KVA TO90KVA
2020_MES_336424_1
3101/WO/21/E3
Limited
Job Works
Item Rate
30 days
Bangalore
As per tender documents
1 document required · 1 mandatory
₹0
Exempted
2 Mar 2021
26 Mar 2020
25 Apr 2020
26 Mar 2020
23 Apr 2020
28 Mar 2020
(a) Material & Labour for removing the end termination of HT cable by disconnecting the HT 11 KV electric supply for RR No 3 EHT 197 at MAP kut line substation under GE (S) Bangalore in consuliation with BESCOM. (b) Material & Labour for replacement of existing 11 KV Current Transformer with CT Ratio 5/1A, 0.2s class all as directed by BESCOM Engineer. (Make-Volt Amp/ Kalpa/ Vyoma) (c) Testing the complete system including CTs after reconnecting the HT cable for complete satisfaction of Engineer-in-Charge.
Sri Manjunatha Enterprises
MGEE Enterprises
Sinai Trading Corporation
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_376144.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .