Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.6 LAccepted-AOC | L1 | Accepted-AOC Financial Ranking L1 | |
| 2 | L2₹42.9 L+₹3.0 L (7.60%)Rejected-AOC | L2 | Rejected-AOC Financial Ranking L2 |
| Sl No | Description | Qty | Unit | Air-O-Mec Engineers L1 | Freezee Point Refrigeartion L2 |
|---|---|---|---|---|---|
| 1.10 | Supply of Variable Refrigerant Flow/Volume (VRF/VRV) System for LASER Lab room | 2 | Nos. | 18,54,900 ₹21,88,782 Lowest | 19,91,870 ₹23,50,406.6 |
| 1.20 | Transportation, loading/unloading and incidental cost till consignee’s site | 1 | Nos. | 43,600 ₹51,448 Lowest | 45,000 ₹53,100 |
| 1.30 | Incidental services of supply & installation of all the accessories like ducting, insulation, interconnected refrigerant pipe, drain pipe, Grills/Diffusers as per tender specification (including installation & commissioning, supervision, demonstration, and training) at the consignee’s site | 1 | Nos. | 6,13,400 ₹7,23,812 Lowest | 6,20,970 ₹7,32,744.6 |
| 2.10 | Comprehensive Maintenance Contract after warranty period for First Year | 1 | Year | 1,48,400 ₹1,75,112 Lowest | 1,60,100 ₹1,88,918 |
| 2.20 | Comprehensive Maintenance Contract after warranty period for Second Year | 1 | year | 1,60,300 ₹1,89,154 Lowest | 1,80,600 ₹2,13,108 |
| 2.30 | Comprehensive Maintenance Contract after warranty period for Third Year | 1 | Year | 1,73,100 ₹2,04,258 Lowest | 1,97,300 ₹2,32,814 |
| 2.40 | Comprehensive Maintenance Contract after warranty period for Fourth Year | 1 | Year | 1,86,900 ₹2,20,542 Lowest | 2,13,200 ₹2,51,576 |
| 2.50 | Comprehensive Maintenance Contract after warranty period for Fifth Year | 1 | Year | 2,01,880 ₹2,38,218.4 Lowest | 2,30,500 ₹2,71,990 |
Tender Value
₹28.5 L
EMD Value
₹57,000
Closing Date
16 Sept 2025, 11:00 amClosed
PURCHASE OFFICER
TATA INSTITUTE OF FUNDAMENTAL RESEARCH ,HOMI BHABHA ROAD, NAVY NAGAR, COLABA, MUMBAI - 400005
SITC OF PRECISION TEMPERATURE AIR-CONDITIONING SYSTEM WORKING WITH VRF/VRV
2025_DAE_874742_1
TIFR/PD/CA25-68/250911
Open Tender
Laboratory and scientific equipment
Supply
60 days
TIFR COLABA MUMBAI
AS PER TENDER DETAILS
5 documents required · 5 mandatory
₹0
₹57,000
Yes
4 Nov 2025
26 Aug 2025
17 Sept 2025
26 Aug 2025
16 Sept 2025
26 Aug 2025
Supply of Variable Refrigerant Flow/Volume (VRF/VRV) System for LASER Lab room
Transportation, loading/unloading and incidental cost till consignee’s site
Incidental services of supply & installation of all the accessories like ducting, insulation, interconnected refrigerant pipe, drain pipe, Grills/Diffusers as per tender specification (including installation & commissioning, supervision, demonstration, and training) at the consignee’s site
Comprehensive Maintenance Contract after warranty period for First Year
Comprehensive Maintenance Contract after warranty period for Second Year
Comprehensive Maintenance Contract after warranty period for Third Year
Comprehensive Maintenance Contract after warranty period for Fourth Year
Comprehensive Maintenance Contract after warranty period for Fifth Year
Freezee Point Refrigeartion (BID ID -3283235)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .