Loading…
Loading…
Tender Value
₹5.9 L
EMD Value
₹5,920
Closing Date
31 Aug 2026, 3:30 pm3d left
Block Development officer (V.P)
Block Development officer (V.P)
CONSTRUCTION OF MINI CSC AT VENGATTI
2026_RDTN_694446_1
Minicsc_2627_pappakudi
Open Tender
Civil Works
Item Rate
90 days
Union Office Thiruppuvanam
Please refer tender documents
3 documents required · 3 mandatory
₹0
₹5,920
Yes
14 Aug 2026
14 Aug 2026
31 Aug 2026
14 Aug 2026
31 Aug 2026
14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of Work:Construction of Mini CSC (Model 1) @ PUE school in Venkatti village and Pappakudi Panchayat | - | - | - | - |
| 2 | Earthwork excavation in all classes of soil with initial lead & lift as per SS 20B for fOUNDATION etc complete | 10.39 | sqm | - | - |
| 3 | CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete | 3.26 | cum | - | - |
| 4 | Brick work in Cm 1:5 mix using Country bricks including all cost & conveyance of all materials to site & all labour charges etc complete for Foundation & Basement | 4.09 | cum | - | - |
| 5 | Brick work in Cm 1:5 mix using Country bricks including all cost & conveyance of all materials to site & all labour charges etc complete for Ground floor | 10.38 | cum | - | - |
| 6 | Providing Steel centering & shuttering charges for RCC & plain surface cost of country wood plank including all cost & conveyance and all labour charges etc complete Below Basement | 21.74 | cum | - | - |
| 7 | Providing Steel centering & shuttering charges for RCC & plain surface cost of country wood plank including all cost & conveyance and all labour charges etc complete Above basement | 24.55 | cum | - | - |
| 8 | Supply & cost of fabrication steel including cost of steel & binding wire tying, bending in position etc | 0.7 | kg | - | - |
| 9 | R.C.C. 1:1.5:3 mix using 20mm metal including all cost & conveyance of all materials to site & all labour charges etc complete for Foundation & Basement | 6.62 | cum | - | - |
| 10 | Supplying and painting the walls with two coats of wall putty as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The wall putty shall be got approved by the Executive Engineer before use of work). | 9.44 | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_834898.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].