| 1 | L1₹3.8 CrAccepted-AOC | ₹3.8 Cr Quoted ₹4.0 Cr | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹4.1 Cr+₹12.2 L (3.09%)Rejected-Finance | ₹4.1 Cr+₹12.2 L (3.09%) | L2 | Rejected-Finance Among the three bidders, this bidder has quoted the Highest Value. |
| 3 | L3₹4.1 Cr+₹19.3 L (4.88%)Rejected-Finance | ₹4.1 Cr+₹19.3 L (4.88%) | L3 | Rejected-Finance Among the three bidders, this bidder has quoted the Highest Value. |
| Sl No | Description | Qty | Unit | VELMURUGA CONSTRUCTION L1 | M VENKATESHBABU L3 | S.BASKARAN L2 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling, Clearing away and carefully stacking materials useful for re - use for any thickness of walls of stone masonry in cement mortar walls under 3 M high - etc complete complying with standard specifications and as directed by the departmental officers | 13 | Cubic meter | 309 ₹4,017 Lowest | 324 ₹4,212 | 318 ₹4,134 |
| 2.00 | Dismantling, clearing away and carefully stacking materials useful for reuse for any thickness of plain cement concrete etc complete complying with standard specifications and as directed by the departmental officers | 203 | Cubic meter | 530 ₹1,07,590 Lowest | 556 ₹1,12,868 | 546 ₹1,10,838 |
| 3.00 | Earth work in all soils except Medium rock / hard rock requiring blasting by deploying earth moving machineries and conveying the excavated earth by using lorries / tippers with a lead of 1 Km and unloading the same for formation of bund including benching, spreading in layers not exceeding 15 cm thick, breaking clods, ramming, compacting by extra watering & consolidation by power roller, sectioning etc., complete complying with standard specifications and as directed by the departmental officers | 45,000 | Cubic meter | 123 ₹55,35,000 Lowest | 129 ₹58,05,000 | 127 ₹57,15,000 |
| 4.00 | Earth work Excavation deploying earth moing machinery for desliting channel having a width of more than 10m and forming bund either sides and deposting the earth on bank including jungle clearance etc complete.. (Channel Desilting U/S) | 22,000 | Cubic meter | 54 ₹11,88,000 Lowest | 57 ₹12,54,000 | 57 ₹12,54,000 |
| 5.00 | Earth work Excavation deploying earth moing machinery for desliting channel having a width 3m to 10m and forming bund either sides and deposting the earth on bank including jungle clearance etc complete.. (Channel Desilting) | 5,000 | Cubic meter | 46 ₹2,30,000 Lowest | 49 ₹2,45,000 | 48 ₹2,40,000 |
| 6.00 | Earth Work Excavation for foundation in all soils and sub soils and to full depth as may be directed by the Departmental Officers except hard rock requiring blasting including shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated soil in layers not exceeding 15 cm thick, well rammed and consolidated and depositing including all initial leads and initial lifts, etc., complete complying with standard specifications and as directed by the departmental officers (Narrow Excavation) | 4,943 | Cubic meter | 240 ₹11,86,320 Lowest | 251 ₹12,40,693 | 247 ₹12,20,921 |
| 7.00Supplying and erecting centring for vertical plain / RCC concrete walls of supply channel, retaining wall etc of following height with necessary supports, all cross bracing with mild steel size of 90 cm x 60 cm and gauge BG 10 stiffened with welded mild steel sheet angles of size 25 mm x 25 mm x 3 mm for bearing laid silver Oak / Country wood joist of size 7.50 cm x 5.0 cm spaced @ about 90 cm C / C and supported by Casurina props of 10 cm to 13 cm spaced @ 75 cm C / C, etc., complete complying with standard specifications and as directed by the departmental officers (Vertical Centering) | ||||||
| 7.01 | Vertical Centering Height - 0 to 90 CM | 377 | Square meter | 564 ₹2,12,628 Lowest | 591 ₹2,22,807 | 580 ₹2,18,660 |
| 7.02 | Vertical Centering Height - 0 to 180 CM | 506 | Square meter | 650 ₹3,28,900 Lowest | 681 ₹3,44,586 | 668 ₹3,38,008 |
| 7.03 | Centering Height 0 to 270 / 300CM | 1,533 | Square meter | 731 ₹11,20,623 Lowest | 767 ₹11,75,811 | 752 ₹11,52,816 |
Tender Value
₹3.9 Cr
EMD Value
₹2.1 L
Closing Date
4 Sept 2025, 12:00 pmClosed
Superintending Engineer, WRD
O/o Superintending Engineer, WRD., Palar Basin Circle, Chennai
Rehabilitation of Kondam across natural drain (Veeramangalam Tank Supply Channel) near Chinnanagapudi Village in R.K.Pet Taluk of Thiruvallur District.
2025_WRD_597038_1
e-Tender Short Term Notice No.04 PBC / 2025-26 / Dt.22.08.2025
Open Tender
Civil Works
Lump-sum
182 days
Thiruvallur
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹2.1 L
29 Oct 2025
25 Aug 2025
4 Sept 2025
25 Aug 2025
4 Sept 2025
28 Aug 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .