Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.1 LAccepted-AOC KAMBAINALLUR | KAMBAINALLUR | DHARMAPURI | TAMIL NADU | ₹11.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.1 LRejected-AOC | ₹11.1 L | L2 | Rejected-AOC L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Bidder Not submitted Proper Pre - Qualification documents and responsive. Hence, Price Bid may be Rejected |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Bidder Not submitted Proper Pre - Qualification documents and responsive. Hence, Price Bid may be Rejected |
| Sl No | Description | Qty | Unit | P.SELVARAJ L2 | R PANNEERSELVAM L1 |
|---|---|---|---|---|---|
| 1.00Strengthening to the Road from A.Pallipatty Morappur Road to Chinthalapdi Colony Road Km 0/0 -0/360 H/O Chinthalpadi | |||||
| 2.00 | 1. Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 518.4 | Sqm | 5.4 ₹2,799.36 | 5 ₹2,592 |
| 3.00 | 2. Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 145.8 | Cum | 120 ₹17,496 | 120 ₹17,496 |
| 4.00 | 3. Collection and supply of Girrty gravel for side berms and labour charges for filling etc complete | 64.8 | Cum | 575 ₹37,260 | 570 ₹36,936 |
| 5.00 | 4. Picking up existing BT surface upto 5 to 10 cm of old metalled surface , cambering, sectioning of carriage way etc., complete | 360 | Cum | 20 ₹7,200 | 20 ₹7,200 |
| 6.00 | 5. Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Km 0/0-0/360 | 162 | Cum | 2,130 ₹3.5 L | 2,136 ₹3.5 L |
| 7.00 | 6. Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Km 0/0-0/360 | 1,080 | Cum | 75 ₹81,000 | 80 ₹86,400 |
| 8.00 | 7. Providing and laying TACK COAT over the WMM surface (treated with primer) using 2.50 Kg of Bituminous Emulsion RS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | 1,080 | Sqm | 17 ₹18,360 | 15 ₹16,200 |
| 9.00 | 8. Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 27 | Sqm | 10,226 ₹2.8 L | 11,200 ₹3.0 L |
| 10.00 | 9. Road marking with hot applied thermoplastic compound with Reflectorising glass beads on bituminous surface etc., | 72 | Sqm | 900 ₹64,800 | 880 ₹63,360 |
Tender Value
₹11.2 L
EMD Value
₹11,200
Closing Date
10 Feb 2026, 3:00 pmClosed
Block Development Officer(BP), Kadathur
Block Development Officer(BP), Kadathur
Strengthening to the Road from A.Pallipatty Morappur Road to Chinthalapdi Colony Road Km 0/0 -0/360 H/O Chinthalpadi
2026_RDTN_651010_1
Roc.No.1856/2025/A2 P01- General Fund -2025-26
Open Tender
Civil Works
90 days
Block Development Office, Kadathur
Can be seen in the Tender Documents
3 documents required · 3 mandatory
₹0
₹11,200
7 Mar 2026
4 Feb 2026
10 Feb 2026
4 Feb 2026
10 Feb 2026
4 Feb 2026
Strengthening to the Road from A.Pallipatty Morappur Road to Chinthalapdi Colony Road Km 0/0 -0/360 H/O Chinthalpadi
1. Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
2. Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
3. Collection and supply of Girrty gravel for side berms and labour charges for filling etc complete
4. Picking up existing BT surface upto 5 to 10 cm of old metalled surface , cambering, sectioning of carriage way etc., complete
5. Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Km 0/0-0/360
6. Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. Km 0/0-0/360
7. Providing and laying TACK COAT over the WMM surface (treated with primer) using 2.50 Kg of Bituminous Emulsion RS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
8. Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
9. Road marking with hot applied thermoplastic compound with Reflectorising glass beads on bituminous surface etc.,
10. Provision for Hectometer stone
11. Provision for Citizen Information Board
12. Provision for Sign board (Triangle)
13. Add 5% Escallation
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.53 MB
Techbid1.pdf
Additional Documents • 0.70 MB
Pricebid1.pdf
Tender Documents • 0.42 MB
BOQ_780624.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid