Loading…
Loading…
Tender Value
₹2.9 L
EMD Value
₹5,860
Closing Date
11 Jul 2026, 6:00 pmClosed
EE MGCCD8 BULANDSHAHR
EE MGCCD8 BULANDSHAHR
Construction of Fall at Km. 0.200 of Amavati Minor
2026_UPIDC_1157876_12
02/EE/2026-27
Open Tender
Civil Works
Item Rate
45 days
sambhal
TECHNICAL
FEE
EMD
2 documents required · 2 mandatory
₹767
₹5,860
13 Jul 2026
4 Jul 2026
13 Jul 2026
4 Jul 2026
11 Jul 2026
4 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T & P, leads and lift etc. | 50.78 | CUM | - | - |
| 2 | Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 9.27 | CUM | - | - |
| 3 | Providing first class M-100 brick work in 1:4 CM including cost of all materials, labour T & P, all lifts and leads etc. for proper completion of work. | 1.97 | CUM | - | - |
| 4 | Providing and Laying lean concrete (1:4:8) cement concrete including cost of all materials, labour, T&P, all lifts and leads etc. complete. | 0.15 | CUM | - | - |
| 5 | Providing and Laying M-15 C.C. (1:2:4) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 25.18 | CUM | - | - |
| 6 | Providing and Laying M-20 C.C.1:1.5:3 cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 3.23 | CUM | - | - |
| 7 | Providing and Laying M-25 C.C.1:1:2 cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 0.38 | CUM | - | - |
| 8 | Providing and fixing Centering & shuttering for C.C. works (form work of concrete) including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work. | 104.25 | SQM | - | - |
| 9 | Providing and fixing of 50 mm dia P.V.C. pipe in proper position for drainage spout including cost of all material, cutting, jointing , labour, T&P, all lifts and leads etc complete as per direction of Engineer-in-charge. | 0.88 | RM | - | - |
| 10 | providing and Laying 12 mm Thick Plaster in 1:4 Cement mortor including cost of all material, labour, T&P, Curing etc complete for proper completion of work | 3.6 | SQM | - | - |
stage.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_2187015.xls
BOQ • 0.22 MB
CorrigendeumdateexetendNIt2sign.pdf
PDF • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .