Tender Value
₹64.5 Cr
EMD Value
₹1.3 Cr
Closing Date
21 Aug 2026, 12:00 pm
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
CE/CON/II
15 conditions · 3 needing a document upload
Submit the scanned copy (In PDF Form) of the documents as per the requirement of financial eligibility criteria of the tender [Refer para 2.3 of tender document {Para 2.3 for tenderer(s) participating as JV firm}]. TENDERS NOT ACCOMPANIED BY THESE DOCUMENTS WILL BE SUMMARILY REJECTED.
Submit the scanned copy (In PDF Form) of the documents for evaluating the Bid Capacity (Please refer Clause 12.25 of tender document). This is applicable in all works contract having tender value of Rs. 10.00 Crore and above. TENDERS NOT ACCOMPANIED BY THESE DOCUMENTS WILL BE SUMMARILY REJECTED.
Submit the scanned copy (In PDF Form) of the work(s) completion certificate(s) as per the requirement of Technical eligibility criteria of the tender [Refer para 2.3 of tender document {Para 2.3 for tenderer(s) participating as JV firm}]. TENDERS NOT ACCOMPANIED BY THESE DOCUMENTS WILL BE SUMMARILY REJECTED.
Defination of Similar Work :- Any ROB/Bridge work with similar superstructure. For ROB across Railway running line the qualifying work shall involve construction of ROB/Bridge superstructure work over Railway running line.
27 conditions · 15 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Notes for all schedules: Standard Schedule of Rates (SSOR) Items: Any item of work carried out by the Contractor on the instructions of the Engineer which is not included in the accepted Bill(s) of Quantities but figures in the Standard Schedule of Rates (SSOR), shall be executed at the rates set forth in the "Standard Schedule of Rates (SSOR)" modified by the tender percentage as accepted in the contract for that chapter of Standard Schedule of Rates (SSOR). However, the cumulative value of all such extra item(s) together (modified by the respective tender percentage) shall not exceed 10 % of the original contract value.
Option of Payment through Letter of Credit (L.C.): Tenderer(s) may submit option for taking payment through Letter of Credit (L.C.). [Refer para 7.1 of tender document].
Credentials if submitted in foreign currency shall be converted into Indian currency i.e., Indian Rupee as under: The conversion rate of US Dollars into Rupees shall be the daily representative exchange rates published by the Reserve Bank of India for the relevant date. Where, relevant date shall be as on the last day of month previous to the one in which tender is invited. In case of any other currency, the same shall first be converted to US Dollars as on the last day of month previous to the one in which tender is invited, and the amount so derived in US Dollars shall be converted into Rupees at the aforesaid rate. The conversion rate of such currencies shall be the daily representative exchange rates published by the International Monetary Fund for the relevant date.
Contract under EBR (IF): It is agreed by and between the parties that Railway shall continue to be held responsible for all obligations, risk and liabilities, whatsoever, arising out of or in connection with the Principal agreement and this novation agreement, whether during the progress of the work or after its completion. It is further agreed and understood by and between the parties that IRFC shall be the owner of assets, if any, arising out of execution of works as defined in the Principal Agreement, except the land whose ownership shall continue with Railway. Accordingly, the invoices shall be issued by capturing GSTIN of contractor (as the supplier) and GSTIN of IRFC (as bill to party). Also, the contractor shall submit the invoice, issued in the name of IRFC, to railway for processing payment by Railway to contractor subject to applicable TDS under the Income Tax, GST or any other applicable laws. It is further agreed by and between the Parties that IRFC shall be responsible to comply with Income Tax and GST laws in relation to filling of returns.
There are several changes in the tender document after the new GCC April 2022 is issued. Tenderer(s) are requested to go through the tender document & GCC carefully before the submission of the offer.
Clarification of Bids: To assist in the examination, evaluation & comparison and pre-qualification of the Tender, the Railway may, at its discretion, ask any Bidder for a clarification of its Bid. Any clarification submitted by a Bidder that is not in response to a request by the Railway shall not be entertained or considered. The Railway request for clarification and the response of the bidder in this regard shall be in writing. However, if a Bidder does not provide clarification of its bid by the date and time communicated in the Railway request for clarification, the bid shall be evaluated as per the documents submitted along with the bid.
All General Instructions are available in the uploaded tender document.
The original Bank Guarantee should be delivered in person to the official nominated as indicated in the tender document before closing date for submission of bids (i.e. excluding the last date of submission of bids). Nominated officials are Dy CE/Con/Works & Stores/GRC, S. E. Railway, Kolkata-700043 and Dy CE/Con/Tatanagar, Office of the Dy CE/Con/Tatanagar, S. E. Railway.
Construction of Road Over Bridges with Camel Back Truss Girder for (i) In Lieu of Level Crossing no. PB- 6 (Span: 1x72.0 Metre) in Jamkundia Yard & (ii) Reconstruction of Road Over Bridge No. 82 (Span: 1x72.0 Metre) in Banspani Yard including approaches etc. and demolishing of existing Road Over Bridge No. 82 in connection with the yard remodeling work of Dangoaposi-Jaroli 3rd & 4th line under jurisdiction of Dy Chief Engineer (Construction), Tatanagar of S. E. Railway.
4655-GRC-CE-C-II-31-2026
4655-GRC-CE-C-II-31-2026
Open
Works - General
18 Months
Unknown (Unspecified Location)
₹0
₹1.3 Cr
27 Jul 2026
27 Jul 2026
7 Aug 2026
116 items across 5 schedules · ₹58,76,77,325.97 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Earthwork in filling in embankment, guide bunds, around buried type abutments, bridge gaps, trolley refuges, platforms etc. with contractor's own earth conforming to Soil Quality Class SQ1/SQ2/SQ3, after preparation of foundations as applicable, benching in existing banks wherever required, spreading in layers with motor grader, bringing the moisture content to OMC, mechanical compaction to specified density a n d dressing of bank to final profile as per RDSO Specifications: RDSO/2020/GE: IRS-0004 with latest correction slips. Note: 1) Foundation preparation, Benching including additional earthwork on account of this, wherever required, shall be paid extra under relevant schedule item for b e n c h in g . 2) Payment for Earthwork under this item shall be made based on the cross section measurements calculated (i) with original ground profile of existing bank based on initial ground levels before doing benching and (ii) final profile of the bank worked out with final levels as per prevailing guidelines. | — | — | — | — | |
| 1 | Using Soil Class SQ1 | cum | 5000.00 | 217.19 | 10,85,950 |
| 2 | Driving rails 90R/52 Kg section below average ground level within the slope/toe of embankment including making of nose with contractor's own arrangement complete in all respect Note: Payment will be made as per actual driven length of rail which will be supplied free by Railways at the site of work. | Metre | 3200.00 | 108.07 | 3,45,824 |
| 3 | Shoring with 'Z' section MS sheet piles side by side in all kinds of soil mechanically or manually as per approved drawing with contractor's own arrangement complete in all respects and removal of sheet piles after completion of the work as directed by engineer in- charge Note: Payment will be made as per actual driven length of pile. | Sqm | 480.00 | 949.68 | 4,55,846.4 |
| Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines. | — | — | — | — | |
| 4 | All kinds of soils | cum | 3000.00 | 205.63 | 6,16,890 |
| 5 | Soft rock (not requiring blasting) | cum | 500.00 | 427.87 | 2,13,935 |
| 6 | Hard rock (requiring blasting) | cum | 250.00 | 776.69 | 1,94,172.5 |
| 7 | Hard rock (blasting prohibited ) | cum | 250.00 | 1,184.98 | 2,96,245 |
| 8 | Providing and fixing Weep Holes in Abutments, Wing walls and Return walls etc., of new bridges with 110mm dia UPVC pipe Type A ISI marked with all contractor's men, material, transportation, all taxes as per specifications and as directed by Engineer-in-Charge. | Metre | 600.00 | 246.59 | 1,47,954 |
| Boring, providing and installation of bored cast in-situ Reinforced Cement Concrete piles using Hydraulic piling Rig of specified diameter and length below pile cap of specified grade with Design Mix Cement Concrete, using 20mm graded crushed stone aggregate and coarse sand of approved quality, to carry a safe working load not less than specified, concreting by machine batching, machine mixing, scaffolding, using Admixture in approved proportion (as per IS:9103), placing with tremie pipe, chipping off of pile top to remove laitance concrete above cut off level etc., pumping and bailing out water complete in all respect as per approved drawing, specification and direction of the Engineer in charge. N o t e : 1. Payment for only cement, reinforcement shall be made extra. 2. Length of the pile for payment shall be measured up to the bottom of RCC pile Cap. 3. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item. | — | — | — | — | |
| 9 | 1200mm diameter | Metre | 500.00 | 8,415.58 | 42,07,790 |
| 10 | Providing, fabricating and installing permanent casing pipe for bored piles for all diameters with specified thickness of steel plate including all labour, materials, tools & complete as per approved drawing & specifications complete in all respect as per the direction of Engineer in charge. Note: Payment shall be made as per the weight of circular plate of casing pipe only. | MT | 75.00 | 1,12,152.91 | 84,11,468.25 |
| Extra for chiselling in addition to boring of piles, if chiselling is required to be resorted to in hard rock or big stone boulders larger than 30cm, manually or by any other means. | — | — | — | — | |
| 11 | 1200mm diameter pile | Metre | 50.00 | 4,823.28 | 2,41,164 |
| Conducting load test of a single pile up to specified capacity in accordance with IS:2911 (Part-IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. with all labour, material, tool & plants, equipment, machinery, etc. complete as per drawing and specification, as directed by the Engineer. | — | — | — | — | |
| 12 | Initial load test up to 50 ton capacity pile | Each | 2.00 | 48,003.43 | 96,006.86 |
| 13 | Initial load test above 50 ton and up to 100 T capacity pile | Each | 2.00 | 57,332.08 | 1,14,664.16 |
| 14 | Initial load test above 100 ton and up to 250 T capacity pile | Each | 2.00 | 80,406.11 | 1,60,812.22 |
| 15 | Extra for every increase of 50 ton in pile capacity or part thereof over 250 ton | Each | 2.00 | 5,217.99 | 10,435.98 |
| 16 | Routine Load Test up to 50 ton capacity pile | Each | 2.00 | 24,001.72 | 48,003.44 |
| 17 | Routine Load Test above 50 ton capacity up to 100 ton capacity pile | Each | 2.00 | 28,666.04 | 57,332.08 |
| 18 | Routine Load Test above 100 ton capacity up to 250 ton capacity pile | Each | 4.00 | 40,203.06 | 1,60,812.24 |
| Lateral load testing of single pile in accordance with "IS Code of practice IS:2911 (Part-IV) for determining safe allowable lateral load of pile" with all labour, material, tool & plants, equipment, machinery, etc complete as per drawing and specification as directed by the Engineer. | — | — | — | — | |
| 19 | Piles with lateral load capacity of up to 50 ton | Each | 2.00 | 21,280.17 | 42,560.34 |
| 20 | Piles with lateral load capacity of above 50 ton and up to 100 ton | Each | 2.00 | 24,598.25 | 49,196.5 |
| 21 | Pulse Echo Test (PET) for integrity testing of piles with contractor's men, materials and machines. The rate includes cost of Inspection of site, preparation of pile head and any other unforeseen cost required for the test, submission of reports in triplicate as per satisfaction of the Engineer in Charge. | Each | 48.00 | 2,843.56 | 1,36,490.88 |
| 22 | Providing and fixing railing used in rows for footpath or anti-crash barrier railing with B class G.I. pipe 65/50 mm nominal dia including cost of M.S. angle and channels in vertical posts, welding / bolting, priming painting with one coat ready mix Zinc Chromate conforming to IS:104 with DFT of 25-30Microns, followed by one coat of Zinc Chrome red oxide conforming to IS:2074 with DFT of 25 Microns with all material, labour, T&P as a complete job. Note: Cost of painting shall be paid extra under relevant item. | Kg | 2500.00 | 103.71 | 2,59,275 |
| Providing and fixing various size HTS holding down bolts conforming to relevant Codes/Specification in concrete column or in other structures with proper nuts, bolts, washers/plates, grouting of holes with cement or epoxy concrete with all material, labour, T&P as a complete job. | — | — | — | — | |
| 23 | With Cement Grout. Cost of cement shall be paid extra. | Kg | 3000.00 | 122.53 | 3,67,590 |
| 24 | Supplying, Fabricating and fixing access ladders, inspection platforms, Trolley refuges etc., on bridges with structural steel conforming to IS:2062 including welding / bolting, priming painting with one coat of ready mixed paint of Zinc Chromate (IS:104) with DFT of 25-30 microns followed by one coat of Zinc Chrome Red Oxide (IS:2074) with DFT of 25 microns with all material, labour, T&P as a complete job. Note: Painting shall be paid separately under relevant item. | MT | 5.00 | 1,02,364.88 | 5,11,824.4 |
| 25 | Supplying fabricating and erecting welded and/or bolted and/or riveted steel work in built up sections, trusses and framed work, staging, racks, Height Gauge etc. for Steel Structures other than bridge girders, using RSJ, tees, angles and channels/flats, plates, gussets, round or square bars, cleats, bolts etc., with contractors own steel including cutting, bending, straightening, drilling, riveting, hoisting, fixing, erecting, welding, bolting etc., with Providing stiffeners wherever required as per approved drawing including applying a priming coat of a approved steel primer with all contractor's materials, labour, tools & plants, lead & lift including crossing of tracks if required etc., complete as per specification and as directed by Engineer- in-charge. Note: The payment shall be made on the theoretical weight of main components and gusset plates only. | MT | 12.00 | 1,14,366.59 | 13,72,399.08 |
| 26 | Supplying of stone boulders weighing not less than 35 kg each at specified bridge locations. | cum | 200.00 | 914.75 | 1,82,950 |
| 27 | Supply and laying of quarry dust including consolidation, supply of all materials, labour, lead, lift, tools, plants, crossing of tracks as per drawing and technical specification as directed by the Engineer in charge in case loose slush is encountered at site of foundation before casting the foundation or laying the filtering media. | cum | 2000.00 | 1,028.7 | 20,57,400 |
| 28 | Supply and laying of coarse sand including consolidation with all labour, lead, lift, tools, plants, crossing of tracks as per drawing and technical specification as directed by the Engineer in charge in case loose slush is encountered at site of foundation before casting the foundation or laying the filtering media. | cum | 2000.00 | 973.1 | 19,46,200 |
| 29 | Providing and laying of filter media consisting of granular materials of GW, GP, SW groups as per IS:1498 (latest) in required profile behind boulder filling of abutments, wing walls / return walls etc. above bed level with all labour and material complete job as per drawing and technical specification of RDSO Guidelines. | cum | 3300.00 | 2,242.92 | 74,01,636 |
| 30 | Providing cast in-situ plaques for bridge foundations details of size 45cmx45cmx5cm in cement concrete 1:2:4 mix using 20mm hard stone aggregate embedded in 30mm deep notch over abutment & piers, engraving the letters & figures with CM 1:3 and finished smooth including painting letters and figures with 2 coats of black enamel and plaque with white enamel with all labour, tools, cement, paint, curing etc. as a complete job. | Each | 4.00 | 1,351.29 | 5,405.16 |
| 31 | Providing Boulder Backing behind wing wall, return wall, retaining wall with hand packed boulders & cobbles with smaller size boulders toward the back including all lead, lift, labour & other incidental charges as complete work in all respect. Payment for boulder/cobbles will be done extra. | cum | 200.00 | 387.52 | 77,504 |
| 32 | Dewatering of natural or accumulated water from any location. Payment to be done for Horse power of pump multiplied by pumping hours. | HP Hour | 2000.00 | 44.97 | 89,940 |
| Painting 2 coats to Bridge Reference / Boards, Structures etc. along track with enamel paint of approved make with different colours & letters, as directed by Engineer in-charge. | — | — | — | — | |
| 33 | Bridge Board | Each | 4.00 | 141.81 | 567.24 |
| 34 | Bridge Tablet | Each | 4.00 | 41.71 | 166.84 |
| 35 | Bridge Height Gauge | Each | 4.00 | 2,433.78 | 9,735.12 |
| 36 | HFL, FSL & DL on Bridge Pier / Abutment | Each | 4.00 | 629.89 | 2,519.56 |
| 37 | Fabrication, supplying and fixing 600mm x 450mm Bridge Board made from 16 SWG MS Sheet duly welded or riveted to back support of two 600mm long horizontal angles of size 25mm x 25mm x 3mm & two numbers 2.5 metre long vertical support of MS Angle of size 50mm x 50mm x 5mm, welded / rivetted to board. Vertical supports shall have split ends for proper fixing in ground. Vertical supports of board shall be embedded in ground in M 20 Cement Concrete blocks of size 300mm x 300mm x 300mm, complete job including painting & writing of subject matter on bridge board, as directed by Engineer - In charge Note: Excavation & concrete work will be paid separately. | Each | 4.00 | 3,336.1 | 13,344.4 |
| Schedule total | ₹3,13,92,010.65 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCCApril-2022.pdf
ATTACHMENT
AdvanceCorrectionSlipNo1to11_1.pdf Advance Correction Slips
ATTACHMENT
BarChart_1.pdf
ATTACHMENT
TD31-2026.pdf
ATTACHMENT
AdvanceCorrectionSlipNo1to11_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].