Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹17.5 LAccepted-AOC AMLAI COLLIERY ANUPPUR MADHYA PRADESH 484114 | AMLAI | ANUPPUR | MADHYA PRADESH | 484114 | L-1 | Accepted-AOC Accepted as L-1 | |
| 2 | Rejected-Technical CAMP CAMP Q NO H 54 WARD NO 17 HALLOW BLOCK KOTMA COLLIERY DIST ANUPPUR MP | KOTMA | ANUPPUR | MADHYA PRADESH | - | Rejected-Technical Rejected as L-3 | |
| 3 | Rejected-Technical CAMP VILLAGE DEVGAI POST KUDARI SHAHDOL MP | NOWROZABAD | UMARIA | MADHYA PRADESH | 484110 | - | Rejected-Technical Rejected as L-2 |
Tender Value
₹23.4 L
EMD Value
₹29,300
Closing Date
16 Dec 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Staff Officer (Mining)
Staff Officer (Mining) SECL Sohagpur Area, PO- Dhanpuri, Distt- Shahdol (MP),Mobile No.- 9425533459
Construction of 06 nos Air crossing in proposed depillaring panel and Development working section of Damini UG Mine of Sohagpur Area
2023_SECL_295341_1
SECL/SGP/ET/23-24/641 dt05/12/2023
Open Tender
Civil Works - Others
Item Rate
180 days
Damini UG Mine
As per NIT
8 documents required · 8 mandatory
₹29,300
28 Dec 2023
5 Dec 2023
18 Dec 2023
5 Dec 2023
16 Dec 2023
6 Dec 2023
5 Dec 2023 - 12 Dec 2023
Amount
Item Description/ Heading Part (A) labour Cost
Roof heightening- ( Drilling, blasting, dressing, mucking etc.) Air crossing 06 Nos. (a) ( Drilling, blasting, dressing, mucking etc.) Including mucking - 6(5.50 X 4.50 X 1.50) = 222.75 M³
(b) ( Drilling, blasting, dressing, etc.) Excluding mucking - i) 6(2.50 X 4.50 X 1.50+0 /2) = 50.63 M³ ii) 3(11.00 X 4.50 X 1.50+1.0+0.5+1.0+1.50/5) = = 163.35 M³ (Total b = 213.98 M³ ( Rate for excluding mucking = Item No. 2(h) -1652.46 (-) Item No. 1(d)- 414.58 = 1237.88
Groove cutting in soft stone In roof – 6{2X(4.80m.x0.15m.X0.10 m.)}=0.86 m3 In side – 6{4X(1.00m.x0.15m.X0.15 m.))=0.54 m3 Total = 1.40 m3
Groove cutting in coal/shale - In floor – 6{2X( 5.10m.x0.30m.X0.30 m.)}=5.51 m3 In side – 6{4X (2.50m.x0.30m.X0.30 m.)}=5.40 m3 6{4X(0.50m.x0.15m.X0.10 m.)}=0.18 m3 Total = 11.09 m3
Reinforced cement concrete (1:2:4) in wall/roof ceiling of air crossing/stopping (any thickness) in u/g (Excluding centring, shuttering, reinforcement cutting, bending, placing in position and binding etc all complete as well as cost of RCC materials) Lower wall- 6{2X5.10m.X2.80m.X0.30m.} = 51.41 m3 Upper wall – 6{2X4.80m.X1.60m.X0.15m.} = 13.82 m3 Roof slab of Air crossing- 6{5.10m. X 4.50m. X 0.10m.}= 13.77 m3 Total = 79.00 m3
Centring, shuttering, finishing and reinforcement including cutting, bending, placing in position and binding and strutting, propping etc complete Lower wall- 6{2X4.50m.X2.50m.} = 135.00 m2 Upper wall – 6{2X4.50m.X1.50m.} = 81.00 m2 Roof slab of Air crossing- 6{4.50m. X 4.50m. } = 121.50 m2 Total = 337.50 m2
6 mm thick cement plaster along with making of Board (1:6) 6{2 X (4.50m. X 2.50m. )}= 135.00 m2 6{2 X (4.50m. X 1.50m. ))= 81.00 m2 TOTAL = 216.00 m2
Loading of all kind building materials in to tub at Inc. mouth- a) Stone chips -70.31 m³ b) Sand - 38.40 m³ c) Cement - 17.85 m³ d) Steel rod(10+12) - 0.46m³ TOTAL = 127.02m
Transportation of all kind of building material from surface to u/g through haulages with tramming and pushing, coupling /uncoupling etc for a distance every 1.0 Km or part there of and bringing the empty tubs to surface
Unloading of all kind building materials in to tub at destination-
Lead for transportation/carriage of all kinds building materials by manually in u/g. Upto 75m..
Roof support including drilling of holes (stone) by providing of drill bit. drill rod, & jet pump by the contractor and installation of roof bolts (1.50m to 1.80m) with bearing plate & w-strap (where required) , Anchorage testing and carrying of support materials. Total length – 86.00 m. X 4 row = 344 nos. Side support = 100 nos. Total = 444 nos
Part (B) Material Cost - Cement
Sand (Coarse grand)
Stone Chips
Steel rod
Total impact of GST for the purpose of CTC
RAVI KUMAR JAISWAL
Ram Awadh Singh
stage.html
html • 0.04 MB
techsummary_305907.pdf
PDF • 0.15 MB
finsummary_305907.pdf
PDF • 0.15 MB
AOC641.pdf
PDF • 2.02 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .