| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.1 LAccepted-Finance | ₹16.1 L | L1 | Accepted-Finance Agreement With L1 |
| 2 | L2₹16.3 LRejected-Finance | ₹16.3 L | L2 | Rejected-Finance Agreement With L1 |
| 3 | L3₹16.5 LRejected-Finance | ₹16.5 L | L3 | Rejected-Finance Agreement With L1 |
| 4 | L4₹17.9 LRejected-Finance 0 AJAY KUMAR 85 HASTAM HASTAM BANDA UTTAR PRADESH 210001 HASTAM BANDA UTTAR PRADESH 210001 UDYAM UP 13 0007628 | BANDA | UTTAR PRADESH | 210001 | ₹17.9 L | L4 | Rejected-Finance Agreement With L1 |
| 5 | Rejected-Technical | - | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | KISAAN EICHER TRACTORS L2 | M/S RINKU CONTRACTOR L3 | M/S SHREE JEE CONSTRUCTIONS L1 | M/s Ajay Kumar Contractor L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling reinforced cement concrete including stacking of material, labour, T&P etc. complete. | 4.16 | CUM | 500 ₹2,080 | 633 ₹2,633.28 | 200 ₹832 | 500 ₹2,080 |
| 2.00 | Dismantling brick work or stone work and cement concrete incement mortar & including stacking of materialas material. labour, T&P etc. complete. | 8.01 | CUM | 420 ₹3,364.20 | 518 ₹4,149.18 | 200 ₹1,602 | 500 ₹4,005 |
| 3.00 | Earth work in foundation in all types of soil including all lift and all lead and including filling, watering and ramming excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge | 92.38 | CUM | 60 ₹5,542.80 | 100 ₹9,238 | 50 ₹4,619 | 90 ₹8,314.20 |
| 4.00 | Providing & laying C.C. 1:2:4(M-15) with cement, coarse sand & aggregate (25mm to 10mm) i/c all cost of material, labour T&P ete complete (Per CuM.) | 32.6 | CUM | 4,150 ₹1.4 L | 5,500 ₹1.8 L | 3,500 ₹1.1 L | 6,000 ₹2.0 L |
| 5.00 | Providing & laying R.C.C. 1:1:2 (M-25) with cement, coarse sand & aggregate (25mm to 10mm) and also excluding centering and shuttering and reinforcement i/c all cost of material, labour T&P ete complete (Per CuM.) | 98.08 | CUM | 6,250 ₹6.1 L | 5,500 ₹5.4 L | 6,200 ₹6.1 L | 5,400 ₹5.3 L |
| 6.00 | Providing & laying 1st class (M-150) brick work with 1:4 cement mortar using cement and coarse snad including cost of all material, T&P & labours complete (Per CuM.) | 66.34 | CUM | 4,050 ₹2.7 L | 4,500 ₹3.0 L | 5,000 ₹3.3 L | 5,400 ₹3.6 L |
| 7.00 | Providing Cement pointing (Flush) on brick masonary in 1:2 Cement Mortar including cost of all material, T&P & labours complete( per SqM.) | 90.67 | SQM | 80 ₹7,253.60 | 104.28 ₹9,455.07 | 100 ₹9,067 | 200 ₹18,134 |
| 8.00 | Centering and shuttering for RCC/RB work including cost of centering & shuttering up to 3.0m height. including cost of all material, T&P & labours complete( per SqM.) | 155.7 | SQM | 600 ₹93,420 | 500 ₹77,850 | 500 ₹77,850 | 290 ₹45,153 |
| 9.00 | Supplying & Laying TMT Steel bar Reinforcement (Fe 550D) including removing of rust, cutting, binding with 24BWG wire, bending, placing with proper overlapping providing chair i/e all cost of material, labour, T&P etc. complete (per M.T.) | 6.03 | M.T | 62,000 ₹3.7 L | 65,000 ₹3.9 L | 70,000 ₹4.2 L | 81,000 ₹4.9 L |
| 10.00 | Providing and fixing P.V.C. pipe 100mm dia & 6Kg./cm Sq. I.S.I. Mark i/c all cost of material, labour, T&P etc. complete | 2.4 | R.M | 250 ₹600 | 280 ₹672 | 200 ₹480 | 100 ₹240 |
Tender Value
₹22.0 L
EMD Value
₹44,040
Closing Date
16 Feb 2026, 5:00 pmClosed
Executive Engineer
OFFICE OF THE EXECUTIVE ENGINEER ANOOPSHAHAR BRANCH DIVISION GANGA CANAL MEERUT
TN-09/EE/2025-26 Reconstruction work of the damaged bridge located at Km 1.800 of Mahuakheda drain..Lot No-2
2026_UPIDC_1114721_2
TN-09/EE/2025-26
Open Tender
Civil Works
30 days
As Per NIT
As per NIT And TD
2 documents required · 2 mandatory
₹944
₹44,040
23 Feb 2026
11 Feb 2026
17 Feb 2026
11 Feb 2026
16 Feb 2026
11 Feb 2026
Dismantling reinforced cement concrete including stacking of material, labour, T&P etc. complete.
Dismantling brick work or stone work and cement concrete incement mortar & including stacking of materialas material. labour, T&P etc. complete.
Earth work in foundation in all types of soil including all lift and all lead and including filling, watering and ramming excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge
Providing & laying C.C. 1:2:4(M-15) with cement, coarse sand & aggregate (25mm to 10mm) i/c all cost of material, labour T&P ete complete (Per CuM.)
Providing & laying R.C.C. 1:1:2 (M-25) with cement, coarse sand & aggregate (25mm to 10mm) and also excluding centering and shuttering and reinforcement i/c all cost of material, labour T&P ete complete (Per CuM.)
Providing & laying 1st class (M-150) brick work with 1:4 cement mortar using cement and coarse snad including cost of all material, T&P & labours complete (Per CuM.)
Providing Cement pointing (Flush) on brick masonary in 1:2 Cement Mortar including cost of all material, T&P & labours complete( per SqM.)
Centering and shuttering for RCC/RB work including cost of centering & shuttering up to 3.0m height. including cost of all material, T&P & labours complete( per SqM.)
Supplying & Laying TMT Steel bar Reinforcement (Fe 550D) including removing of rust, cutting, binding with 24BWG wire, bending, placing with proper overlapping providing chair i/e all cost of material, labour, T&P etc. complete (per M.T.)
Providing and fixing P.V.C. pipe 100mm dia & 6Kg./cm Sq. I.S.I. Mark i/c all cost of material, labour, T&P etc. complete
Providing and laying Thermacol sheet in expention joint including i/e all cost of material, labour, T&P etc. Complete.
Earth work for filling in approch road & strengthening of banks including all lift and all lead with rammimg & dressing, proper i/c all cost of material, labour, T&P etc. complete
Earthwork in removing Diversion/Bandha including al lift and all lead with ramming & dressing.proper i/e all cost of material, labour, T&P ete. Complete
Distempering Two coat with oil bound distemper of approved brand and manufacture and of required shade on undercoated wall surface to give an even shade over an including a priming coat cement primer of approved brand and manufacture such as Berger, J&N, Shalimar, Asian Paints after thoroughly brushing the surface free from mortar dropping and other foreign matters and also including preparing the surface even with plaster of paris or approved synthetic material and sand papered smoothi/c all cost of material, labour, T&P etc. complete.
Painting letters including cost of material for writing chainage on V.R.B. i/c all cost of material, labour, T&P etc. complete.
Note : The Quantities written above may increase or decrease as per requirement & site condition
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.05 MB
BOQ_2067432.xls
BOQ • 0.28 MB
TD.pdf
Tender Documents • 2.08 MB
Download all tender documents and submit your bid