| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.9 LAccepted-Finance | ₹13.9 L | L1 | Accepted-Finance Lowest rate |
| 2 | L2₹15.2 LAccepted-Finance | ₹15.2 L | L2 | Accepted-Finance Highest rate |
| 3 | L3₹18.0 LAccepted-Finance 16 19 ATTAIAMAL NAGAR 1 KANNAKURICHY SALEM 636008 | SALEM | SALEM | TAMIL NADU | 636008 | ₹18.0 L | L3 | Accepted-Finance Highest rate |
| Sl No | Description | Qty | Unit | PRAGATHESH ENTERPRISES L2 | SRS ENTERPRISES L3 | T K CHITI BABU L1 |
|---|---|---|---|---|---|---|
| 1.00 | I. Material portion: ISMC 150 x 75mm | 3.7 | MT | 64,000 ₹2,79,424 Lowest | 66,000 ₹2,88,156 | 67,000 ₹2,92,522 |
| 2.00 | ISA 75 x 75x 6mm | 1.28 | MT | 66,600 ₹1,00,592.64 | 70,000 ₹1,05,728 | 64,000 ₹96,665.6 Lowest |
| 3.00 | Chequered Plate 6mm | 3.7 | MT | 83,500 ₹3,64,561 Lowest | 86,000 ₹3,75,476 | 84,000 ₹3,66,744 |
| 4.00 | G.I pipe for hand rail 1.5 inch (40mm)
(class B) | 220 | M | 180 ₹46,728 | 200 ₹51,920 | 140 ₹36,344 Lowest |
| 5.00 | II. Labour Portion: Leading, lifting & Transportation of supplied iron & steel materials from NCTPS-I stores to site including special consumables. | 8.67 | MT | 4,100 ₹41,945.46 | 5,500 ₹56,268.3 | 3,105 ₹31,766.01 Lowest |
| 6.00 | Dismantling of corroded/damaged existing Iron & steel structure from North east Corner concrete pillar leading towards Ash handling pump house, devolution the same to store including consumables, and T&P’s. (Above 6m elevation) | 4.34 | MT | 8,100 ₹41,481.72 | 12,000 ₹61,454.4 | 7,200 ₹36,872.64 Lowest |
| 7.00 | Fabrication and erection of new walk way platform its supporting structural’s over the cement concrete pillar of Ash Slurry Line No.1 to 5 from North East corner concrete pillar leading towards Ash handling pump house and fabrication, erection of approaching ladder including consumables, & T&P’s. (Above 6 m elevation) Note. Walk way platform size 1mx1m.. | 8.67 | MT | 45,000 ₹4,60,377 | 62,000 ₹6,34,297.2 | 42,000 ₹4,29,685.2 Lowest |
| 8.00 | Erection of hand rails 40 NB pipes (GI pipe) by marking cutting the pipes to the required length leading lifting the pipe to the work spot and erection of pipes. | 220 | M | 350 ₹90,860 | 400 ₹1,03,840 | 150 ₹38,940 Lowest |
| 9.00 | Surface cleaning and painting of the fabricated MS structural surface with 1 coat of red oxide and two coats of Enamel paint including cost of consumables, T&P’s & cost of paint. | 333.7 | M² | 250 ₹98,441.5 | 300 ₹1,18,129.8 | 145 ₹57,096.07 Lowest |
Tender Value
Refer Docs
EMD Value
₹14,900
Closing Date
12 Mar 2026, 2:00 pmClosed
CE/NCTPS-I
CE/NCTPS-I
NCTPS I SE M II Circle AHP Dn Dismantling the damaged severely corroded walk way platform and fabrication erection of new walk way platform and its supporting structural over the newly provided structural column along the Ash Slurry Line No 1 to 5
2026_EB_667927_1
CE/NCTPSI/SE/MII/SpNo151/25-26
Open Tender
Power/Energy Projects/Products
Works
45 days
NCTPS Chennai
Refer the tender documents
3 documents required · 3 mandatory
₹0
₹14,900
Yes
27 Aug 2026
27 Feb 2026
13 Mar 2026
27 Feb 2026
12 Mar 2026
27 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | I. Material portion: ISMC 150 x 75mm | 3.7 | MT | - | - |
| 2 | ISA 75 x 75x 6mm | 1.28 | MT | - | - |
| 3 | Chequered Plate 6mm | 3.7 | MT | - | - |
| 4 | G.I pipe for hand rail 1.5 inch (40mm)
(class B) | 220 | M | - | - |
| 5 | II. Labour Portion: Leading, lifting & Transportation of supplied iron & steel materials from NCTPS-I stores to site including special consumables. | 8.67 | MT | - | - |
| 6 | Dismantling of corroded/damaged existing Iron & steel structure from North east Corner concrete pillar leading towards Ash handling pump house, devolution the same to store including consumables, and T&P’s. (Above 6m elevation) | 4.34 | MT | - | - |
| 7 | Fabrication and erection of new walk way platform its supporting structural’s over the cement concrete pillar of Ash Slurry Line No.1 to 5 from North East corner concrete pillar leading towards Ash handling pump house and fabrication, erection of approaching ladder including consumables, & T&P’s. (Above 6 m elevation) Note. Walk way platform size 1mx1m.. | 8.67 | MT | - | - |
| 8 | Erection of hand rails 40 NB pipes (GI pipe) by marking cutting the pipes to the required length leading lifting the pipe to the work spot and erection of pipes. | 220 | M | - | - |
| 9 | Surface cleaning and painting of the fabricated MS structural surface with 1 coat of red oxide and two coats of Enamel paint including cost of consumables, T&P’s & cost of paint. | 333.7 | M² | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_802517.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].