| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹19.8 L+₹1,373.31 (0.07%)Rejected-AOC MADURAI MAIN ROAD PALAMEDU | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SAI TRADERS L2 | N D ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 38.52 | cum | 247.89 ₹9,548.72 | 245.66 ₹9,462.82 Lowest |
| 2.00 | CC 1:4:8 mix using 40mm HBG metal including cost and conveyance and all labour charges and materials charges etc,.. | 10.66 | cum | 5,085.64 ₹54,212.92 | 5,081.64 ₹54,170.28 Lowest |
| 3.00 | Supply and fabrication of steel including cost and conveyance and all labour charges etc. complete. | 3.2 | mt | 89,949.74 ₹2,87,839.17 Lowest | 89,949.74 ₹2,87,839.17 Lowest |
| 4.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | 21.62 | cum | 8,913.66 ₹1,92,713.33 | 8,911.06 ₹1,92,657.12 Lowest |
| 5.00 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Grade beam Main wall alround two sides | 42.33 | sqm | 515.46 ₹21,819.42 | 511.05 ₹21,632.75 Lowest |
| 6.00 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. column 0.23 x 0.38 | 38.4 | sqm | 926.44 ₹35,575.3 | 920 ₹35,328 Lowest |
| 7.00 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Main building front side | 90.85 | sqm | 1,035 ₹94,029.75 | 1,029 ₹93,484.65 Lowest |
| 8.00 | Brick work in CM 1:5 mix using country bricks including cost and conveyance and all labour charge etc., | 25.56 | cum | 6,069.37 ₹1,55,133.1 Lowest | 6,069.37 ₹1,55,133.1 Lowest |
| 9.00 | ROLLING SHUTTERS (WITH ISI MONOGRAM) including cost and conveyance of all labour charges etc completed., | 3.78 | cum | 2,419 ₹9,143.82 Lowest | 2,419 ₹9,143.82 Lowest |
| 10.00 | Supply and fixind for Girl work including cost and conveyance of all labour charges etc completed., | 120 | sqm | 106.5 ₹12,780 Lowest | 106.5 ₹12,780 Lowest |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
31 Jul 2025, 5:00 pmClosed
Block Development officer,Walajah
Block Development office,Walajah
Construction of Gym Building with Equipments in Sathambakkam Panchayat in Walajah Block
2025_RDTN_586869_1
A2/1170/2025
Open Tender
Civil Works
Works
30 days
Block Development office, Walajah
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹20,000
1 Sept 2025
29 Jul 2025
31 Jul 2025
29 Jul 2025
31 Jul 2025
29 Jul 2025
Amount
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
CC 1:4:8 mix using 40mm HBG metal including cost and conveyance and all labour charges and materials charges etc,..
Supply and fabrication of steel including cost and conveyance and all labour charges etc. complete.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Grade beam Main wall alround two sides
Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. column 0.23 x 0.38
Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Main building front side
Brick work in CM 1:5 mix using country bricks including cost and conveyance and all labour charge etc.,
ROLLING SHUTTERS (WITH ISI MONOGRAM) including cost and conveyance of all labour charges etc completed.,
Supply and fixind for Girl work including cost and conveyance of all labour charges etc completed.,
Supplying and fixing UPVC (Un-Plasticized Polyvinyl Chloride) Windows of casement type (open) from the profile the size of outer frame 60mm x 58mm and shutter profile are reinforcement with GI/1mm 125GSM and 100% corrosion free, the profiles are multi chambered sections with wall thick of 2mm. The EPDM rubber (black colour) covered with over all the edges of frame and shutter the shutter will be provided with Espag multi power point locks and also it operates as handle. The corners and joints should be welded and cleaned. Radiations free pin headed plain or brown colour glass 4mm thick should be provided to the shutter and it should not allow leakage of water even at most ranging storms and should have key lockable action, security protective hinges, strong locking systems and as per size for arresting noise and energy loss. The connecting mechanism between sash and outer frame that enables opening of the window. The window should be fixed to the wall with 100% packing with screws and silicon packing all round the frames. The window should be got approved from the Executive Engineer before use on work
window - w
Labour charges for fixing doors along with frames in position etc complete Door - D
Labour charges for fixing windows along with frames in position etc complete Window - w
Weathering coarse concrete using 20mm size broken brick jelly with in pure slaked lime over the RCC Roof in the proportion of 32 : 12 1/2 by volume laid in layer beating the concrete with the wooden batters etc as per standard specifications .
Finishing Top of Roof with one Couse of pressed Tiles set in cm:1:3 Mix using tiles of size 23x23x2 cm etc
Supplying and Painting the walls with single coat of JSW wall putty as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The wall putty shall be got approved by the Executive Engineer before use of work)
Plastering with cement mortar 1:5, 12mm thick including cost and conveyance and all labour charges etc.
Paving the floor with best approved quality fine polished Kota stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three M.Sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
Colour washing two coats with approved plastic emulsion paint inlcuding cost and conveyance and all labour charges etc,..completed..
Colour washing two coats with approved Distember paint inlcuding cost and conveyance and all labour charges etc,..completed..
Painting with two coats over new iron work using synthetic enamel paint including all
Provision for Light point
Provision for Fan point
Supply and fixing of 48" ceiling fan
Provision for DPTC
Provision for Plug point
Supply and fixing of Tub light
Supply and fixing of CFL
Supply and run of Service connection wire
Supply and fixing of service board
Supply and fixing of Bulk head fitting
Supply and fixing of 25 mm dia GI pipe
Supply for Gym Equipments
SAI TRADERS (BID ID -1415454)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_700982.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .