| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹61.1 LAccepted-AOC | L1 | Accepted-AOC Quoted Lowest rate and Executed Agreement on 31.01.2024 | |
| 2 | L2₹62.7 L+₹1.6 L (2.61%)Rejected-AOC 6TH CROSS STREET KAMARAJ NAGAR PALAYAMKOTTAI | PALAYAMKOTTAI | TIRUNELVELI | TAMIL NADU | 627002 | L2 | Rejected-AOC L2 |
Tender Value
₹61.8 L
EMD Value
₹1.2 L
Closing Date
4 Aug 2023, 3:00 pmClosed
The Addl. Collector (Dev) DRDA Thoothukudi
DRDA Thoothukudi
Thoothukudi Dt - PMGSY Incentive Grant 2022-23 Pkg No TN 25-73 Periodic Renewal and Five Years Maintenance of the PMGSY Road From Akkanayakkanpatti - Chokkanathapuram Road Km 0/0-2/950 in Ottapidaram Block
2023_RDTN_126586_1
DRDPR,Che,Lr.No. DIPR/3802/Tender/2023 dt.20.07.23
Open Tender
Civil Works - Roads
Item Rate
120 days
Thoothukudi District
As per Tender Schedule
4 documents required · 4 mandatory
₹0
₹1.2 L
DRDA Thoothukudi
20 Feb 2024
21 Jul 2023
4 Aug 2023
21 Jul 2023
4 Aug 2023
28 Jul 2023
28 Jul 2023
Amount
Periodic Renewal and Five Years Maintenance of the PMGSY Road From L072-Akkanaikanpatti-Chokkanathapuram road Km 0/0-2/950 in Ottapidaram Block in Pkg.no TN25-73
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Earth Work Excavataion and depositing on back with an initial of 10m and lift 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20A
Providing and Laying Red Gravel for soling & for side berms to 100 mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing Advance BT patches using 45 mm IRC metal premixed with 44 Kg of bitumen including removal of failed material, trimming the sides to vertical and leveling the bottom, cleaning the same with compressed air or any appropriate method, filled with 50mm thick BM, after applying bitumen emulsion tack coat at the bottom and sides as per technical specifications clause 502, 503 and 504.
Providing and laying tack coat over the BT surface using 3.00 Kg of Emulsion bitumen for 10 sqm. Including cost of bituminous emulsion including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 Km. 0/0 - 0/907
Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc complete as per MORT&H specification No.803
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing etc., as per drawing and Technical specification clause 1703 Ordinary Kilometer Stone (Precast)
Reinforced cement concrete M15 grade Hectametre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing etc., as per drawing and Technical specification clause 1703 Ordinary Hectameter Stone (Precast) 200m stone (precast)
Cost of Painting and Lettering in Name board
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse an (Wearing Coat)
Routine Maintenance after completion of work
Towards the charges for routine maintenance of the road work including dressing of bermsby refilling the gully with form berms, desilting of side drains and CD works , Whitewashing guardstones, painting of KM & HM stones,Parapets, cutting of breaches of trees, refixing displaced guard stones , caution boards, speed limit boards etc with the periodiocity for the above actitvities as prescribed in IRC SP 20-2002 and as directed by the departmental officers except for the constructional defects which has to be rectiufied by the contractor at his own cost.
For the First year from the date of completion of work
For the second year from the date of completion of work
For the third year from the date of completion of work
For the fourth year from the date of completion of work
For the fifth year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Pothiraj and Co
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .