Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-AOC | ₹5.3 L | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical NOCHIPALAYAM AUTHUR PO KARUR 2 | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | GOBALAKRISHNAN P L1 | K.SELVARAJ L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 A. TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10 with standard specifications. | 612 | M3 | 329 ₹2,01,348 Lowest | 350 ₹2,14,200 |
| 2.00Cost and Supply of PVC Pipe 6kgsc/cm2 and GI pipes ISI Quality including loading and unloading charges etc., complete as per Specifiction. | |||||
| 2.10 | 90 mm PVC 6kgsc/cm2 PVCPipes | 610 | M | 142 ₹86,620 Lowest | 145 ₹88,450 |
| 2.20 | 110 mm PVC 6kgsc/cm2 PVCPipes | 900 | M | 196.5 ₹1,76,850 Lowest | 200 ₹1,80,000 |
| 3.00Lowering PVC rigid pipes and specials to trench and laying to proper grade and alignment,jointing with PVC couplers with cement paste. | |||||
| 3.10 | 90 mm PVC 6kgsc/cm2 PVCPipes | 610 | M | 23.5 ₹14,335 Lowest | 25 ₹15,250 |
| 3.20 | 110 mm PVC 6kgsc/cm2 PVCPipes | 900 | M | 23.5 ₹21,150 Lowest | 25 ₹22,500 |
| 4.00 | Refilling the excavated earth for pipe line trench including all labour charges etc., complete. | 612 | M3 | 45 ₹27,540 Lowest | 48 ₹29,376 |
Tender Value
₹6.5 L
EMD Value
₹13,000
Closing Date
2 Mar 2026, 3:00 pmClosed
Executive officer
Annur Town Panchayat
Providing Pipeline at Ward no.12 Bharathi nagar North South cross street and East west cross street -1,2,3,4 and union office to kambar street in Annur Town panchayat.
2026_DTP_668566_1
321/2025/A1
Open Tender
Civil Works - Water Works
Works
Annur Town Panchayat
As per norms
1 document required · 1 mandatory
₹0
₹13,000
17 Jun 2026
28 Feb 2026
2 Mar 2026
28 Feb 2026
2 Mar 2026
28 Feb 2026
28 Feb 2026 - 2 Mar 2026
Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 A. TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10 with standard specifications.
Cost and Supply of PVC Pipe 6kgsc/cm2 and GI pipes ISI Quality including loading and unloading charges etc., complete as per Specifiction.
90 mm PVC 6kgsc/cm2 PVCPipes
110 mm PVC 6kgsc/cm2 PVCPipes
Lowering PVC rigid pipes and specials to trench and laying to proper grade and alignment,jointing with PVC couplers with cement paste.
90 mm PVC 6kgsc/cm2 PVCPipes
110 mm PVC 6kgsc/cm2 PVCPipes
Refilling the excavated earth for pipe line trench including all labour charges etc., complete.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_803252.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .