| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.0 LAccepted-AOC | ₹24.0 L Quoted ₹25.0 L | L1 | Accepted-AOC Lowest |
| 2 | L2₹31.6 L+₹6.6 L (26.5%)Rejected-Finance | ₹31.6 L+₹6.6 L (26.5%) | L2 | Rejected-Finance not lowest |
| 3 | L3₹35.7 L+₹10.7 L (42.7%)Rejected-Finance PLOT NO 28 SANTOSHIMA COLONY WEST MARREDPALLY SECUNDERABAD 500026 | HYDERABAD | TELANGANA | 500026 | ₹35.7 L+₹10.7 L (42.7%) | L3 | Rejected-Finance not lowest |
| 4 | L4₹35.8 L+₹10.8 L (43.2%)Rejected-Finance | ₹35.8 L+₹10.8 L (43.2%) | L4 | Rejected-Finance not lowest |
| 5 | L5₹37.5 L+₹12.5 L (50.1%)Rejected-Finance | ₹37.5 L+₹12.5 L (50.1%) | L5 | Rejected-Finance not lowest |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
28 Jun 2021, 6:00 pmClosed
GE I R and D Kanchanbagh
GE I R and D Kanchanbagh Kanchanbagh Post Hyderabad 500058
REPAIR/MAINTENANCE AND SERVICING OF COMPRESSORS, CHILLERS, CONDENSORS, COOLING TOWERS, DUCTS INCLUDING WATER LINES OF CENTRAL/ PACKAGE AC PLANTS INSTALLED AT DRDL / ASL AREA UNDER GE (I) RND KANCHANBAGH, HYDERABAD
2021_MES_447448_1
GE I KBAGH TOKEN 24 OF 2021 2022
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
Hyderabad
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Yes
GE I R and D Kanchanbagh
₹98,000
Yes
3 Jul 2021
1 Jun 2021
30 Jun 2021
1 Jun 2021
28 Jun 2021
15 Jun 2021
1 Jun 2021 - 7 Jun 2021
Amount
Leak testing of the AC plant with nitrogen (N2) pressure after evacuating of the existing gas from the system into empty cylinder by separating the entire system, like compressors, evaporator, condensers, cooling coil and refrigerant lines and rectifying the leakage including cutting welding brazing etc and replacing of 'O' ring, washers, gaskets etc flushing out the Nitrogen and vaccumising, recharging the taken out refrigerant gas including testing complete all as directed to AC plants of capacity 2 x 22 TR AC plant.
All as per item No. 1.00 here-in-before but of capacity 3 x 78 TR Central AC plant.
All as per item No. 1.00 here-in-before but of capacity 3 x 20 TR AC plant.
All as per item No. 1.00 here-in-before but of capacity 3 x 35 TR AC plant.
All as per item No. 1.00 here-in-before but of capacity 2 x 45 TR AC plant.
All as per item No. 1.00 here-in-before but of capacity 3 x 40 TR AC plant.
All as per item No. 1.00 here-in-before but of capacity 3 x 24 TR Central AC plant, X-Ray bldg.
All as per item No. 1.00 here-in-before but of capacity 1 x 39 TR AC plant.
All as per item No. 1.00 here-in-before but of capacity 3 x 30 TR AC plant.
All as per item No. 1.00 here-in-before but of capacity 3 x 70 TR AC plant.
All as per item No. 1.00 here-in-before but of capacity 3 x 145 TR AC plant. Note :- One condenser/Chiller unit shall be measured as one job for the purpose of payment.
Supply only refrigerant gas R-22 complete all as directed
Supply only refrigerant gas R-407c complete all as directed.
Supply only refrigerant gas R-134a complete all as directed.Make Srl No 2 to 2.02 Mefron/Fluron/Freon
Descaling of one condenser unit of following capacity of AC plants of capacity acity 3x70 TR central AC plant any make/type with and including descaling compound DC-96 by using Spiral brushing machine circulation with Magnetic pump for Impeller as required to remove complete scales from all copper tubes till the desired pressure is achieved including renewing of gaskets, nuts, bolts and washers Inlet & Outlet etc. and testing complete all as directed. Note: (i)Descaling Compound and Spiral Brushing Eqpt are deemed in quoted rate (ii)Descaling pump/spiral brushing eqpt produced by contractor are deemed in quoted rate . (iii) One condenser unit shall be measured as one job for the purpose of payment.
All as per item No. 3.00 here-in-before but of capacity 3 x 20 TR Central AC plant at old Astra, Metrology Bldgs & Range sys plant.
All as per item No. 3.00 here-in-before but of capacity 3 x 30 TR central AC plant at Alignment metrology centre (140 bldg)
All as per item No. 3.00 here-in-before but of capacity 3 x 35 TR Central AC plant at Alignment inspection centre (140A bldg).
All as per item No. 3.00 here-in-before but of capacity 3 x 32 TR central AC plant at PMS-I.
All as per item No. 3.00 here-in-before but of capacity 3 x 40 TR Central AC plant at PMS-II, Mag 1.3 bldg & NGARM Exp bldg.
All as per item No. 3.00 here-in-before but of capacity 3 x 78 TR central AC plant at Computer Centre.
All as per item No. 3.00 here-in-before but of capacity 3 x 24 TR Central AC plant at X-Ray bldg.
All as per item No. 3.00 here-in-before but of capacity 3 x 48 TR Central AC plant at Digital Video bldgs.
All as per item No. 3.00 here-in-before but of capacity 3 x 50 TR Central AC plant at Data bldg.
All as per item No. 3.00 here-in-before but of capacity 1 x 39 TR Central AC plant at ZZ-YY mag.
All as per item No. 3.00 here-in-before but of capacity 3 x 145 TR Central AC plant, at Astra bldg.
All as per item No. 3.00 here-in-before but of capacity 3 x 11 TR Central AC plant at Machine Facility bldg & Mag 1.1 bldg.
All as per item No. 3.00 here-in-before but of capacity 3 x 75 TR Central AC plant at NGARM Workshop building.
All as per item No. 3.00 here-in-before but of capacity 1 x 50.2 TR Central AC plant at precision metrology bldg.
Taking out carefully the chiller electronic programmable logic control board of any capacity / make of the chiller unit after disconnecting all connection and taking the PLCB to the auth OEM service centre if necessary or repairing at site and testing the PLCB replacing the defective component of PLCB and testing the functioning of software and updating the software and code if necessary and refixing the same to its original position making all connections testing all parameter like the chillers loading , unloading suction / head pressure , all temperature logs but of capacities 11 to 16.5 TR AC plants complete to the entire satisfaction of Engr – In – Charge.
All as per item No. 4.00 here-in-before but of capacities 20 to 50TR AC plants.
All as per item No. 4.00 here-in-before but of capacities 70 to145 TR AC plants
Removing the unserviceable V-Belts from the system and supply & Fix new V-Belts of ISI marked following sizes and testing and all as specified and directed, of sizes A-32 / A-39 / A-42/A-29.
All as per item No. 5.00 above but of sizes B-81 / B-90 / B-92/ /B-68/B-63/B-93/B-88
All as per item No. 5.00 above but of sizes B-106/B-108/B-124/B-122/B-125/B-117
All as per item No. 5.00 above but of sizes C-110/C-90/C-108
Draining out old compressor oil Lubricants , supply and filling new refrigeration compressor oil of flash point COC 210 Degree Celsius Min. Suitable for compressors working on refigerant R-22/R-407C/R-134A confirming IS 13256: 1992 complete all as directed by Engr-in-charge.Make : Servo press T68 or Hycom 150P.
Dismounting the centrifugal / mono block pumps of capacity upto 7.5 HP and shifting the pump to the workshop and replacing the damaged parts like impellers (ss) bearings, bushes and necessary spares and re-fixing to its original position for testing to the entire satisfaction of the Engr-in-Charge Note: the old U/S worn out parts should be displayed to Engr-in-Charge for testing the genuiness of repairs
All as per item No. 7.00 as above but of capacity 12.5 HP to 15 HP.
Supply and Fixing PVC Fills suitable to make of cooling tower MIHIR as required at site including nuts & bolts complete all as specified and directed.
Disconnecting and taking out the existing old unserviceable water sensors and supply & fix new water sensor new anti freeze/ ambient air sensor of scroll compressor chillers of any capacity complete all as specified and testing as directed. Make: As per OEM
Cleaning of the Evaporator coils/cooling tower fins with acid by force feed method to remove the unwanted dust particles formed on the coils/fins and cleaning of the dust particles cleaning of the filler, of any capacity make / model to the entire safisfaction of Engr-in-charge
Servicing greasing overhauling of AHU blower motor Of any capacity, checking the pulleys, base frame, cooling to opening covers and replacing the bearings pulleys as per the existing model, lubricating all mechanical parts with synthetic grease and reassembling all parts, aligning of the pulley to its original position complete to the entire satisfaction of Engr-in Charge
Supply & fix PVC spray nozzles of any dia flower type, (PVC pipe, bend, nipple as required sizes) suitable for 80/100/120 TR capacity cooling tower including removing the unserviceable sparay nozzles from site complete all as specified and directed. Make - MIHIR/PAHARPUR.
Dismantling the complete cooling tower FD fan assembly and supply & fixing new blade, fan motor (ISI marked) of as per the existing capacity shaft hub key including aligning of fan blades complete. Testing to the entire satisfaction for capacity 1 x 35 TR AC plant.
All as per item No. 13.00 as above but of capacity 3 x 78 TR plant.
All as per item No. 13.00 as above but of capacity 3 x 25 TR plant.
All as per item No. 13.00 above but of capacity 3 x 30 TR plant.
All as per item No. 13.00 above but of capacity 3 x 11 TR plant. Make of item No. 13 to 13.04 : As approved by GE
Removing the existing unserviceable Oil pressure pump from the compressor, supply and fix new oil pressure pump of type as per the existing model / make and including replacing the valve plate gasket-3 No's complete all as specified and directed of make as per at site requirement.
Disconnecting and removing the burnt out Cooling tower/AHU/Chiller fan motor from the existing plants, rewinding of the same with supper enamelled copper conductor with same existing gauge, turns ration, replacing the stator insulations replacement of bearings and reconnecting the same with electrical connections and testing to the satisfaction of Engr-in-charge complete all as specified and directed of capacity 5 HP to 7.5 HP.
All as per item No. 15.00 as above but of capacity 12 HP to 15 HP.
Disconnecting and removing the burnt out monoblock pumping sets from the existing plants, of central/package type AC plants, rewinding the same with supper enamelled copper conductor with same existing gauge and reconnecting the same with electrical connections and testing complete all as specified of capacity 5 HP to 7.5 HP.
All as per item No. 16.00 as above but of capacity 12 HP to 15 HP.
Disconnecting and taking out the repairable centrifugal pumping sets from the existing plants of 20 HP to 25 HP capaties of central AC plants, replace the impeller, bearing, bush gasket sets, nut & bolts etc. of the same pumping sets including reinstallation the same plants, reconnecting the same with electrical connections and testing complete all as specified and directed.
Disconnecting and removing the unserviceable solenoid valve assembly and supply and fix the new solenoid assembly of MOP275 PSI, SWP 300PSI and reconnect the electrically and testing complete all as specified and directed. Make : Sporlon/Sanlan/Denfoss
Taking out unserviceable water pressure cutout and supply and fix new water pressure cutout IPS 70. Make: INDFOSS/Danfoss or equivalent
Disconnecting and removing the unserviceable suction valve assembly and supply and fix the new suction valve assembly of 3x24 TR capacity AC plants and reconnect the same with existing plants and testing complete all as specified and directed Make: Sporlon/sanlam or its equivallent.
All as per item No. 20.00 as above but of capacity 3x78 TR AC plants.
All as per item No. 20.00 as above but of capacity 3x50.2 TR AC plants. Make of item No. 20.00 to 20.02 : Sporlon/Sanlam or its equivallent.
Taking out old unserviceable Pre filter and S & F Air pre filters suitable for HVAC Air conditioning system AHU’s as per norms made with galvanised steel frame aluminium separators with non woven synthetic filter media of 20 micron as per existing size and shape including taking down old U/S Air pre filters completed all as directed make:As approved by GE
Taking out old unserviceable HEPA filter and S & F Air pre filters suitable for HVAC Air conditioning system AHU’s as per the ASHRAY norms made with galvanised steel frame aluminium separators with non woven synthetic filter media of 5 micron as per existing size and shape including taking down old U/S Air pre filters completed all as directed make:As approved by GE
Material and labour for taking out the damaged insulation portion of existing outdoor duct, cleaning the duct, applying two coats of CPRX compound to cleaned portion of duct, applying one coat of bitumen paint, fixing of 50mm thick glass wool of 48 KG density to the duct and sealing it with hessian cloth and 15 mm thick chicken wire mesh and 15mm thick sand cement plaster with cement mortor CM 1:4 to the duct and applying two coats of white wash and two coats of snow cem of excising color and site clearance of old debris and making good all as specified and directed.
Material and labour for taking out the damaged insulation portion of existing refrigerant line/chilled water pipe line of sizes and cleaning the pipe and insulation with thermocole pipe section TF quality wrapped around pipe and fixing with GI wire mesh, plastering with cement mortar 1:4, 15 mm thick finished smooth and duly painted with two coats of cement based paint of existing colour and site clearance of old debris all as specified and directed
M&L for painting the interior and exterior parts of cooling towers with epoxy seal paint as per the manufactures specifications including preparing the surfaces of cooling towers after removing all the PVC fill , nozzles, ID fan and cleaning the water collecting tray for algae free surfaces using necessary detergent chemicals complete sealing the leakage on the body if any while apply the epoxy sealing paint complete to the entire satisfaction of Engr-in-Charge.
Removing the existing unserviceable fan blade assembly with hub from cooling tower and supply and fix new fan blade assembly with hub including clamp and fixing arrangement suitable for 20 to 48 TR capacity of exisiting make cooling tower complete all as specified and directed.
All as per item No. 26.00 but of 50 to 78 TR capacity cooling tower complete all as specified and directed of make : As per the existing make & model.
Supply & Fix in repairs MCCB 3 Pole, 415 V, fixed type, 400 Amps with breaking capacity 36 KA , Icu=100% Ics, thermal magnetic, adjustable over load and short circuit ratings including spreaders links complete all as specified and directed. Make : L&T / Legrand / Schneider / Seimins
Supply & Fix in repairs MCCB 4 Pole, 415 V, fixed type, 200 Amps with breaking capacity 36KA, Icu=100% Ics, thermal magnetic, adjustable over load and short circuit ratings including spreaders links complete all as specified and directed.
Supply & Fix in repairs MCCB 4 Pole, 415 V, fixed type, 250 Amps with breaking capacity 36KA complete all as specified and directed.
M&L for fixing in repairs the Aluminium composite panel thickness of sheet not less than , cutting and pasting the vinyl letters as per the installation details given by the Site-In-Charge including fixing the board on the location specified with necessary fixing stainless steel bolts and washers. Make: As approved by the GE. Note: The sample piece of the panel should be produced for prior approval from GE before ordering. (ii) Working height upto 5mtrs deemed to be included in quoted rate.
M&L for fabricating the base channel (ISI marked) frame work for the centrifigual monoblock pumps as per existing frame sizes thickness smooth and fixing to the PCC foundation using necessary bolts & nuts as required at site complete all as specified and directed.
M&L for preparation of Base frame of any size and applying one coat of red oxide primer and two coats of black color anti-corrosive paint complete all as specified and directed.
Supply and replace the following unserviceable components of AC plants - LP/HP cut out MP-15 of Make Sporlan/Sanlam.
Oil pressure cut out MP-55, of Make Sporlan/Sanlam.
Contactors ML-1.5 AC-3 type (make : L&T/GE)
Contactors ML-1 AC-3 type (Make :L&T/GE)
Contactors TC 1 D 5011 AC-3 type (Make :Telemake/GE)
Three Pole contactor MN -16 (Make : L&T/GE)
Three Pole contactor MN -25 (Make : L&T/GE)
Single phase preventor suitable for 415V, AC, 50 Hz Make-Minelec/GE.
HRC fuse 4 amp with fuse holder as per existing panel Make-FTC/GE.
Thermal over load relay range 14-23 Amps suitable for MN type contactor, Make-FTC/GE.
Thermal over load relay range 9-15 Amps suitable for MN type contactor, Make-FTC/GE. Make for Item Nose : 28.00 to 28.12 : Sporlan/Sanlam or its equivallent.
Material and labour for replacement of shaft seal assembly Compressor of ACCEL Make SMC 4 - 100 model including removing unserviceable one.
Material and labour for replacement of shaft seal assembly Compressor of Accel Make SMC 4 - 65 model including removing unserviceable one.
Material and labour for replacement of shaft seal assembly Compressor of Voltas Make 5F - 40 model including removing unserviceable one.
Material and labour for replacement of shaft seal assembly Compressor of York Make J63F050B model including removing unserviceable one.
Taking down compressor motor 37 KW 3 phase 415 volts 50 Hz 1455 RPM cutting & removing the burnt winding, rewinding with same gauge of super enamelled copper conductor, insulating materials etc and heat varnishing the winding, replacing the worn out bearings complete reassembling connecting testing and commissioning complete all as specified and directed.
Description all as per item No.39.00 Here in before but 30 KW, 3 phase 50 Hz 1470 RPM
Description all as per item No.39.00 Here in before but 15 KW, 3 phase 50 Hz 1470 RPM
Supply and Fix microprocessor control panel board of existing make suitable to package AC plant of capacity 3 x 11 TR make : Voltas/Carrier or its equivallent.
Supply and Fix electronic control panel board of existing make/type suitable to package AC plant of capacity 2 x 7.5 TR make : Voltas/Carrier or its equivallent.
Removing the existing unserviceable liquid line drier filter and supply & fix new liquid line drier filter for use with CFC/HCFC/HFC/R-22/R-134a/R-407c complete and key suitable for 7.5/8.5/9 TR AC plants, all as specified and directed.
All as item No. 44.00 as above but of capacity 24/30/32/35 TR AC plant.
All as per item No. 44.00 above but of cap 75/70/78 TR Central AC plant.
All as per item No. 44.00 above but of cap 40/45/48/50 TR AC plant.
All as per item No. 44.00 above but of cap 11/16.5 TR AC plant.
All as per item No. 44.00 above but of cap 145 TR AC plant.
Taking out the unserviceable scroll/reciprocating compressor from the existing position and supply & fix new scroll/reciprocating compressor including initial filling up refrigerant gas as per manufacturer recommendation to the required pressure and reconnecting of all connected system complete all as directed by the Engr-in-Charge, of capacity 7.5 TR,.
All as item No. 50.00 as above but of capacity 11 to 12.5 TR
All as item No. 50.00 as above but of capacity 19.5 TR Make of item No. 50.00 to 52.00 : Copeland/Danfoss or as per site reqd.
Disconnecting and removing the unserviceable expansion valve assembly and supply and fix the new expansion valve assembly of 5/7.5/8.5 TR capacity AC plants and reconnect the same with existing plants and testing complete all as specified and directed
All as item No. 53.00 as above but of capacity 24/30/32/35 TR AC plant.
All as per item No. 53.00 above but of cap 75/70/78 TR Central AC plant.
All as per item No. 53.00 above but of cap 39/40/45/48/50 TR AC plant.
All as per item No. 53.00 above but of cap 11/16.5 TR AC plant. Make of item No. 53.00 to 57.00 : Sporlan/Sanlam or its equivallent.
Taking down steel/caste/GI iron tubing and connections carefully without any damage (including all fittings) complete all as specified and directed of following sizes:-
150 mm dia.
100 mm dia.
80 mm dia.
50 mm dia.
25 mm dia.
Supplying, laying PP-R pipes of following sizes and including cutting of CI/GI pipe line complete all as per specfied and as directed.
160 mm dia.
110 mm dia.
90 mm dia.
50 mm dia.
25 mm dia.
Removing the existing unserviceable butterfly valve of any size and supply and fix butterfly valve of following sizes including replacing of nuts, bolts, washers and packing and testing all as specified and directed. Make-Kirloskar/Kartar/upadyaya.
50 mm dia.
100 mm dia.
Supply & fix Scale guard of suitable size of existing Central AC following plants of 70TR capacity water cooled pipe line removing existing scale guard carefully without any damaging of pipe line and fix new scale guard testing complete all as specified and directed.
All as item No. 61.00 as above but of capacity 50.02 TR AC plant.
Material and labour strip opening of compressor model Semihermetic ACCEL SMC 4-100 of 35 TR capacity cheking of serviceability of parts, keeping a side for refixing , replacing the unsv worn out parts for top overhauling the compressor complete incl grinding , polishing and after minor repairs /replacement of minor parts with necessary split pins, recondition of suction and discharge valve replacing rubber sealing etc all as specified and directed by Engineer-in-charge at 3DCNC. Note : Spares required will be required measured and paid in relevant items.
Supply only following spares for the Compressor Model SMC 4-100 Make 'ACCEL'. The part shall be ACCEL Make.
Main bearing non end driving.
Main bearing driving end.
Connecting rods
Discharge reed with springs(sets)
Suction reed with springs (sets)
Piston ring (sets)
Cylinder liner
Piston
Gasket set
Gudgen pin with bush.
Crank shaft
Supply and Fix indicator lamps LED type 110 Volts for LT panels including removing of the unserviceable complete all as specified and directed. Make :- L&T/Alstom/Siemens
M&L for fabricating angle iron support of size as per the existing cooling tower of any size using nuts, bolts, washers and etc., and removing the existing nuts, bolts, washers and refixing angle iron support without any damage making good the disturbed portion complete all as specified and directed.
M&L in repairs clamps, flanges and back plate fabricated from structural steel sections / channels including nuts, bolts, washers, rods, welding bending cold or hot, drilling holes for bolts in any shape or size as indicated or directed and inclusive of one primer coat , one under coat and finishing coat of synthetic enamel paint as in supports of pipe complete all as per site requirement and directed.
Supply and Fixing the dial type Pressure Gauges in the Chiller & AHU water pipe line complete with all fittings and gun metal valves for isolation for ease of maintenance and operation all as per manufacturer design complete all as specified and as directed. Make: H Guru
Supply and Fixing the dial type Temperature Gauges of size 100 mm dia in the Chiller & AHU water pipe line complete with all fittings and gun metal valves for isolation for ease of maintenance and operation all as per manufacturer design complete all as specified and as directed. Make: H Guru
All as per Sl item No.71 above but 80 mm dia complete all as specified and as directed.
Removing the existing un serviceable gate valve and supply and fix new PP-R gate valves with necessary PP-R fittings of the following sizes :- MAKE : Leader/Zoloto/Neta/Mittal
25 mm dia
32 mm dia
50 mm dia
63 mm dia
Removing the existing unserviceable butterfly valve of any size and supply and fix PP-R butterfly valve of following sizes including replacing of nuts, bolts, washers and packing and testing all as specified and directed. Make :- SFMC/Vector/Kitec
50 mm dia.
63 mm dia.
Removing the exisiting unserviceable FRP cooling tower and Supply & Fix FRP induced draft cooling tower of 11 TR capacity, bottle type, complete with spray section honey comb fill basin fan, TEFC motor, intake bird screen and other accessories as required with and including provision of suitable brick work staging with PCC 1:4:8 type D2 using 40mm graded stone aggregate in foundation and excavation to the required size in any strata, Provision of ladder etc and including PVC Fills as required qty deemed in the quoted rate complete all as specified and directed. Note : (i) Inlet and outlet pipes with control valves from nearest tapping point for coling tower shall deemed to be included in rate quoted.
SRI SAI ENTERPRISES
Universal refrigeration and Engineering Company
Bismi Engineering
CHITRA ENGINEERING CORPORATION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .