| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.5 CrAccepted-AOC | ₹15.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹16.5 CrRejected-Finance | ₹16.5 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹17.9 CrRejected-Finance | ₹17.9 Cr | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical REJECTED |
| Sl No | Description | Qty | Unit | M/S Rajkishor Tiwari L1 | BANSAL BROTHERS L3 | INTERGEN ENERGY LTD L2 |
|---|---|---|---|---|---|---|
| 1.00Work of Water Supply System of Bakho town under AMRUT 2.0 | ||||||
| 1.01 | Survey(both Existing and proposed components), Soil investigation, Design and Construction of a) Construction of Intake Well and Raw water pumphouse on Son River intake well is considered with diameter 6 meters and height 22 meters having average wall thickness 350 mm also pumphouse of 4.00 m height is considered b) Construction of collecting well having a diameter of 4.5 m and 6 meter. c) Raw water pump: Supplying and installation of 3 nos. Vertical turbine pumps 3 no 35 kw (Discharge m 23 LPS. Head 94.0 meter) (2W+1S) d) water treatment plant of 3.50 MLD capacity along with Clear water Pumps for 3.50 MLD and all necessary electrical and mechanical equipment for clear water pump house. e) Clear water pump: 3 Nos.22 kw (two working and One Stand By) discharge 22 lps and 57 m head,22 KW. f) Providing and Laying of Raw water pumping Main 300 mm dia DI-K-9 having cumulative length of 7126 meter. g) Providing and laying of clear water pumping Main 100mm to 300 mm dia DI-K-9 having cummulative length of 4048 meter. h) Construction of Three Nos. 20.00 m staging height RCC overhead Service Reservoir having capacity of 475 KL, 400 KL, 425 KL for effective distribution of water. i) Providing, Laying and Jointing of 110mm to 355 HDPE PN-6 class pipe & 400 mm dia DI K7 pipe for strengthening and extension of water supply distribution network of Bakho water supply arrangement having total length of 51518 meter. j) Supply and Installation of PLC SCADA for entire water supply system k) Providing / Shifting House service connections for 1226 Nos. of Domestic Water Connection. l) 11 KV HT feeder of 10 KM length for intake well & WTP Substation for WTP and Intake Well. | 1 | Nos | 15,52,51,041.6 ₹15.5 Cr | 17,94,35,000 ₹17.9 Cr | 16,50,13,346 ₹16.5 Cr |
Tender Value
₹16.9 Cr
EMD Value
₹8.4 L
Closing Date
19 Apr 2025, 5:00 pmClosed
C.M.O.
NAGAR PARISHAD BAKHO
Work of Water Supply System of Bakho town under AMRUT 2.0
2025_UAD_393771_2
24
Open Tender
Water Supply/Equipments/Meter/Drilling/Boring
540 days
BAKHO
Please refer Tender documents.
9 documents required · 9 mandatory
₹30,000
₹8.4 L
NAGAR PARISHAD BAKHO
28 Oct 2025
3 Apr 2025
21 Apr 2025
3 Apr 2025
19 Apr 2025
3 Apr 2025
9 Apr 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid