Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.7 L+₹10,450.08 (6.42%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.7 L+₹11,320.92 (6.95%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.8 L
EMD Value
₹3,600
Closing Date
11 Aug 2026, 5:00 pmClosed
EXECUTIVE ENGINEER REW KISHTWAR
Hall No 4 O/O Executive Engineer REW Kishtwar
Refer BOQ
2026_RDPR_317736_16
e-NIT No 46 of REW KISHTWAR 2026-27 Dated. 24.07.2026
Open Tender
Civil Works
Percentage
30 days
TRIGAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹3,600
18 Aug 2026
25 Jul 2026
12 Aug 2026
25 Jul 2026
11 Aug 2026
25 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | - | CUM | - | - |
| 2 | Centering and shuttering including strutting, propping etc. and removal of form work for:
4.6.1 Foundations, footings | - | sqm | - | - |
| 3 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in
foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 1 | CUM | - | - |
| 4 | Extra for brick work with common burnt clay bricks/cement concrete bricks in
superstructure above plinth level upto floor five level | 1 | cum | - | - |
| 5 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering.1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | - | cum | - | - |
| 6 | 15mm Cement plaster on the rough side of single or half brick wall of
mix:1 : 6 ( 1 cement : 6 fine sand) | - | sqm | - | - |
| 7 | Finishing walls with water proofing cement paint of required shade on
New work (two or more coats applied @ 3.84 kg/10sqm) | - | sqm | - | - |
| 8 | Carriage of sand & bajree from 40 km by M/T | - | cum | - | - |
| 9 | Carriage of bricks | - | 1000 No | - | - |
| 10 | CIB (citizen information Board ) all complete | - | No | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
BOQ_1043086.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .