Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.1 LAccepted-Finance | 1 | Accepted-Finance L1 | |
| 2 | 2₹7.7 L+₹65,101.73 (9.18%)Rejected-Finance | 2 | Rejected-Finance L2 | |
| 3 | 3₹8.2 L+₹1.1 L (16.0%)Rejected-Finance | 3 | Rejected-Finance L3 | |
| 4 | 4₹9.1 L+₹2.0 L (28.1%)Rejected-Finance | 4 | Rejected-Finance L4 | |
| 5 | 5₹9.2 L+₹2.1 L (29.6%)Rejected-Finance | 5 | Rejected-Finance L5 |
Tender Value
₹15.9 L
EMD Value
₹31,880
Closing Date
20 Aug 2026, 6:00 pmClosed
Ex. Engineer PMGSY Budgam
Ex. Engineer PMGSY Budgam Near SDH Chadoora
Permanent Restoration (SASCI-I) of works of PMGSY SD Budgam namely (A)Suranhall, Package No JK02-155 B)Parthen to Lassipora Package No Jk02-26, C)Budgam to Hayatpora Package No Jk02-98
2026_KSRRD_149129_5
ENIT No.09/EE/PMGSY/B/E-TENDERING OF 2026-27 Dated 13-08-2026
Open Tender
Civil - Roads and Bridges
Percentage
30 days
Budgam
As per NIT
7 documents required · 7 mandatory
₹800
₹31,880
25 Sept 2026
13 Aug 2026
21 Aug 2026
13 Aug 2026
20 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1(A)Suranhall, Package No JK02-155 | |||||
| 1.01 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of soil ( JKSOR 2.90 ) | 18.75 | CUM | 225.21 | ₹4,222.69 |
| 1.02 | Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii) (PMGSY 9.20B) | 3.06 | CUM | 1,525.26 | ₹4,667.3 |
| 1.03 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 1.25 | CUM | 5,505.56 | ₹6,881.95 |
| 1.04 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and
curing complete with Cement mortar 1:6 (1 Cement : 6 coarse sand) | 34.22 | CUM | 7,457.85 | ₹2,55,207.63 |
| 1.05 | Dry random rubble masonry with hard stone in foundation and plinth:
With bond stone | 22.81 | CUM | 5,427.73 | ₹1,23,806.52 |
| 1.06 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete (JKSOR 4.18) | 15 | Sqm | 392.11 | ₹5,881.65 |
| 1.07 | Centering and shuttering including strutting, propping etc. and removal of form for:Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc. | 2.5 | Sqm | 551.47 | ₹1,378.68 |
| 1.08 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 ( Pmgsy 12.10) | 11.48 | CUM | 1,425.22 | ₹16,361.53 |
| 2(B)Parthen to Lassipora Package No Jk02-26, | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.14 MB
BOQ_234629.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .