Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.2 LAccepted-AOC NO 1 120 FIRST STREET SANIPOONDI VILLAGE TIRUVANNAMALAI TALUK DISTRICT TAMIL NADU 606 755 | TIRUVANNAMALAI | TIRUVANNAMALAI | TAMIL NADU | 606755 | ₹41.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹42.7 L+₹1.5 L (3.57%)Rejected-Finance M 241 RAGAVENDRA NAGAR TNHB SEVELIMEDU KANCHIPURAM DISTRICT TAMIL NADU 631 502 | SEVELIMEDU | KANCHIPURAM | TAMIL NADU | 631502 | ₹42.7 L+₹1.5 L (3.57%) | L2 | Rejected-Finance L2 |
| 3 | L3₹43.9 L+₹2.7 L (6.53%)Rejected-Finance 0 DHULJI KI DHANI DESURIYAN VISHNOIYAN SURPURA JODHPUR JODHPUR RAJASTHAN 342304 | JODHPUR | RAJASTHAN | 342304 | ₹43.9 L+₹2.7 L (6.53%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | R UVARAJAN L2 | M/s MSK Construction L1 | D K SOLUTIONS L3 |
|---|---|---|---|---|---|---|
| 1.01 | Carefully removing dense vegetation and heavy jungle growth from the lower moat walls and adjoining sides, including collection and disposal of the removed materials to a designated location away from the site, including cost and conveyance of all materials, hire charges of tools and plants, labour charges, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. | 200.93 | 1 SQM | 3,074.23 ₹3,627.59 | 2,813.02 ₹3,319.36 Lowest | 3,214.88 ₹3,793.56 |
| 1.02 | Excavation and leveling of the area to a depth of 0.30 metres, including removal of unwanted debris, and conveying and disposing of the excavated earth to a designated location away from the site, including cost and conveyance of all materials, hire charges of tools and plants, labour charges, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. | 128.8 | 1 SQM | 15,154.61 ₹17,882.44 | 14,168 ₹16,718.24 Lowest | 15,456 ₹18,238.08 |
| 1.03 | Carefully removing fallen huge size stones, including boulders and debris, from a depth of 4.70 metres, and collecting, conveying, and stacking the same at a designated location using pulley block and scaffolding, including cost and conveyance of all materials, hire charges of tools and plants, labour charges, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. | 49.5 | 1 CUM | 81,537.89 ₹96,214.71 Lowest | 81,675 ₹96,376.5 | 83,655 ₹98,712.9 |
| 1.04 | Dismantling of undulated and collapsed brick flat form in lime mortar, including collection and disposal of the dismantled debris to a designated location away from the site, including cost and conveyance of all materials, hire charges of tools and plants, labour charges, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. | 1.17 | 1 CUM | 1,803.37 ₹2,127.98 | 1,755 ₹2,070.9 Lowest | 1,872 ₹2,208.96 |
| 1.05 | Carefully dismantling and removing the precariously standing, out-of-plumb lower moat wall from a height of 4.00 metres, including lifting, collecting, conveying, and stacking the serviceable stones for reuse, and disposing of unserviceable debris to a designated location away from the site, including cost and conveyance of all materials, hire charges of tools and plants, labour charges, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. | 23.97 | 1 CUM | 39,484.1 ₹46,591.24 Lowest | 39,550.5 ₹46,669.59 | 40,749 ₹48,083.82 |
| 1.06 | Earthwork excavation in hard black cotton soil, including collection, conveying, and disposal of the excavated earth away from the fort premises by lorry, including loading and unloading charges, cost and conveyance of all materials, hire charges of tools and plants, labour charges, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. | 340.63 | 1 CUM | 52,102.76 ₹61,481.26 | 51,094.5 ₹60,291.51 Lowest | 57,907.1 ₹68,330.38 |
| 1.07 | Providing and filling sand below foundation concrete, including watering, ramming, and consolidating to achieve proper compaction, including cost and conveyance of all materials, hire charges of tools and plants, labour charges, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. | 1.82 | 1 CUM | 7,086.9 ₹8,362.54 Lowest | 7,087.23 ₹8,362.93 | 7,243.6 ₹8,547.45 |
| 1.08 | Providing and laying lime concrete in proportion 1:2:4 (1 part lime : 2 parts dry river sand : 4 parts 20 mm size brick aggregate) to a thickness of 100 mm as bed for stone flooring, including mixing, laying, leveling, compacting, curing, and finishing, including cost and conveyance of all materials, hire charges of tools and plants, labour charges, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. | 8.39 | 1 CUM | 94,466.2 ₹1,11,470.12 | 90,612 ₹1,06,922.16 Lowest | 94,807 ₹1,11,872.26 |
| 1.09 | Construction of coursed rubble masonry revetment wall using rough granite stones set in lime mortar 1:2 (1 part lime : 2 parts dry river sand), including dressing of stones, laying in courses, providing through and bond stones of size 24 × 24 × 39 cm at required intervals, jointing, curing, scaffolding, and all incidental works, including cost and conveyance of all materials, labour charges, hire charges of tools and plants, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials | 48.22 | 1 CUM | 6,67,457.86 ₹7,87,600.28 | 6,26,860 ₹7,39,694.8 Lowest | 6,72,669 ₹7,93,749.42 |
| 1.10 | Reconstruction of fallen and out-of-plumb stone masonry of the lower moat wall using 70% available old stones and 30% new rough granite stones(approximate size 0.25 m × 0.25 m × 0.15 m), dressed, cut, and shaped to the required size and conforming to the existing cylindrical fortification profile (approximate size 0.80 m × 0.45 m × 0.45 m), set in lime mortar 1:2 (1 part lime : 2 parts dry river sand), including lifting, placing, proper bonding, jointing, curing, erection and dismantling of scaffolding, use of chain pulley blocks, and all incidental works. The item includes cost and conveyance of all materials, labour charges, hire charges of tools and plants, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. | 85.73 | 1 CUM | 18,34,971.78 ₹21,65,266.7 | 18,00,330 ₹21,24,389.4 Lowest | 18,86,060 ₹22,25,550.8 |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
1 Jun 2026, 11:00 amClosed
Superintending Archaeologist
O/o Superintending Archaeologist, ASI, Chennai Circle, Chennai-9
MC EW (CAM) to Special Repairs to Fort Vellore for the year 2025-26
2026_ASI_907886_1
T-15014/52/2026-CHENNAI CIRCLE
Open Tender
Civil Works - Buildings
Works
180 days
as per tender document
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹1.1 L
Yes
11 Sept 2026
7 May 2026
2 Jun 2026
7 May 2026
1 Jun 2026
8 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1.01 | Carefully removing dense vegetation and heavy jungle growth from the lower moat walls and adjoining sides, including collection and disposal of the removed materials to a designated location away from the site, including cost and conveyance of all materials, hire charges of tools and plants, labour charges, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. | 200.93 | 1 SQM | 15.25 | ₹3,064.18 | 18% |
| 1.02 | Excavation and leveling of the area to a depth of 0.30 metres, including removal of unwanted debris, and conveying and disposing of the excavated earth to a designated location away from the site, including cost and conveyance of all materials, hire charges of tools and plants, labour charges, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. | 128.8 | 1 SQM | 117.31 | ₹15,109.53 | 18% |
| 1.03 | Carefully removing fallen huge size stones, including boulders and debris, from a depth of 4.70 metres, and collecting, conveying, and stacking the same at a designated location using pulley block and scaffolding, including cost and conveyance of all materials, hire charges of tools and plants, labour charges, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. | 49.5 | 1 CUM | 1,642.3 | ₹81,293.85 | 18% |
| 1.04 | Dismantling of undulated and collapsed brick flat form in lime mortar, including collection and disposal of the dismantled debris to a designated location away from the site, including cost and conveyance of all materials, hire charges of tools and plants, labour charges, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. | 1.17 | 1 CUM | 1,536.73 | ₹1,797.97 | 18% |
| 1.05 | Carefully dismantling and removing the precariously standing, out-of-plumb lower moat wall from a height of 4.00 metres, including lifting, collecting, conveying, and stacking the serviceable stones for reuse, and disposing of unserviceable debris to a designated location away from the site, including cost and conveyance of all materials, hire charges of tools and plants, labour charges, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. | 23.97 | 1 CUM | 1,642.3 | ₹39,365.93 | 18% |
| 1.06 | Earthwork excavation in hard black cotton soil, including collection, conveying, and disposal of the excavated earth away from the fort premises by lorry, including loading and unloading charges, cost and conveyance of all materials, hire charges of tools and plants, labour charges, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. | 340.63 | 1 CUM | 152.5 | ₹51,946.08 | 18% |
| 1.07 | Providing and filling sand below foundation concrete, including watering, ramming, and consolidating to achieve proper compaction, including cost and conveyance of all materials, hire charges of tools and plants, labour charges, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. | 1.82 | 1 CUM | 3,882.25 | ₹7,065.7 | 18% |
| 1.08 | Providing and laying lime concrete in proportion 1:2:4 (1 part lime : 2 parts dry river sand : 4 parts 20 mm size brick aggregate) to a thickness of 100 mm as bed for stone flooring, including mixing, laying, leveling, compacting, curing, and finishing, including cost and conveyance of all materials, hire charges of tools and plants, labour charges, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. | 8.39 | 1 CUM | 11,225.7 | ₹94,183.62 | 18% |
| 1.09 | Construction of coursed rubble masonry revetment wall using rough granite stones set in lime mortar 1:2 (1 part lime : 2 parts dry river sand), including dressing of stones, laying in courses, providing through and bond stones of size 24 × 24 × 39 cm at required intervals, jointing, curing, scaffolding, and all incidental works, including cost and conveyance of all materials, labour charges, hire charges of tools and plants, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials | 48.22 | 1 CUM | 13,800.53 | ₹6,65,461.56 | 18% |
| 1.1 | Reconstruction of fallen and out-of-plumb stone masonry of the lower moat wall using 70% available old stones and 30% new rough granite stones(approximate size 0.25 m × 0.25 m × 0.15 m), dressed, cut, and shaped to the required size and conforming to the existing cylindrical fortification profile (approximate size 0.80 m × 0.45 m × 0.45 m), set in lime mortar 1:2 (1 part lime : 2 parts dry river sand), including lifting, placing, proper bonding, jointing, curing, erection and dismantling of scaffolding, use of chain pulley blocks, and all incidental works. The item includes cost and conveyance of all materials, labour charges, hire charges of tools and plants, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. | 85.73 | 1 CUM | 21,340.06 | ₹18,29,483.34 | 18% |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
BOQ_954226.xls
BOQ • 0.28 MB
Tenderdocumentvellorefort.pdf
Tender Documents • 13.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .