Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC MAIN ROAD BILAUNJI WAIDHAN 486 886 DISTT SINGRAULI MP | WAIDHAN | SINGRAULI | MADHYA PRADESH | 486886 | L1 | Accepted-AOC L1 Bidder Technically and Commercially Qualified | |
| 2 | L2₹8.3 L+₹61,656.80 (8.07%)Rejected-AOC 01 NEAR GOVERMENT HOSPITAL KOTHI BAZAR ROAD KOTHI SATNA MADHYA PRADESH 485666 | SATNA | MADHYA PRADESH | 485666 | L2 | Rejected-AOC L2 Bidder | |
| 3 | L3₹9.0 L+₹1.4 L (18.1%)Rejected-AOC | L3 | Rejected-AOC L3 Bidder | |
| 4 | L4₹9.3 L+₹1.6 L (21.2%)Rejected-AOC AT PO RAJRAPPA PROJECT DIST RAMGARH JHARKHAND 829150 | RAJRAPPA PROJECT | RAMGARH | JHARKHAND | 829150 | L4 | Rejected-AOC L4 Bidder |
Tender Value
₹9.6 L
EMD Value
₹12,100
Closing Date
8 Jul 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SO(EnM), Dudhichua Area
PO-Khadia, Distt. -Sonebhadra, U.P., Pin- 231222
Dismantling, Repairing and Fitting of complete Pump model EST250200 of M/s. WILO for Monsoon in coal section in Dudhichua Project
2024_NCL_310728_1
DCH/EnM/Tender/FLD/23-24/027
Open Tender
Electrical and Maintenance Works
Item Rate
60 days
Dudhichua NCL
Please refer tender documents
4 documents required · 4 mandatory
₹12,100
23 Sept 2024
26 Jun 2024
9 Jul 2024
26 Jun 2024
8 Jul 2024
27 Jun 2024
26 Jun 2024 - 1 Jul 2024
Amount
Dismantling, repairing and fitting of complete pump model EST250200-Sr no. DCH/EST/06 & 08 and rotating assembly 03 nos. of WILO make Qty (02+03=05 nos.)
Dismantling and cleaning of all the spares and body Manpower required - a) 4 skilled x 2 shift x 14 days
Manpower required - b) 3 unskilled x 2 shift x 12 days
Hardware store i.e. for cotton west, kerosene oil, chisel, emery paper etc.
contractor profit on labour charge
Repairing of pump body EST pump two no. Sl No. 06 & 08
Cost of C.I machinable Electrodes- Lorthem 705
Welding labour charges
Cost of machining Size of boring- 280mm x I.D.270mm x Length 38mm
Complete fittment of the two no. pump with Rotating assly and one no rotating assly
Manpower required - a) 4 skilled x 2 shift x 15 days
Manpower required - b) 3 unskilled x 2 shift x 13 days
Hiring charge over head crane for fittment of pump 6 Hrs. x 5 nos
contractor profit on labour charge
Providing and fitting of nut and bolt size M24X120/M22X130 for body stud
Providing and fitting of casing ring
Providing and fitting of shaft sleeve
Repairing of rotating assly
Repairing of Shaft 3 Nos. a) Welding electrode 680CG
b) Welding electrode 660NH
c) Welding charges
d) Machining Charges
e) Key way cutting
Repairing of Impeller- 3 Nos.
a) Welding electrode Lotherem 534
b) Welding charges
c) Machining Charges
d) Dynamic balancing charges
Total impact of GST for the purpose of CTC
ADARSH ENTERPRISES
MAYURA TECH
Prakash Enterprises
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_321973.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .