| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹21.8 LAccepted-AOC CAMP WARD NO 17 GHAROULA MOHALLA NEW BUS STAND SHAHDOL DIST SHAHDOL MP PIN 484001 | SHAHDOL | MADHYA PRADESH | 484001 | ₹21.8 L | L-1 | Accepted-AOC Accepted as L-1 |
| 2 | L-2₹22.5 L+₹70,162.27 (3.22%)Rejected-Finance CAMP VILLAGE DEVGAI POST KUDRI SHADOL MP PIN 484110 | SHAHDOL | MADHYA PRADESH | 484110 | ₹22.5 L+₹70,162.27 (3.22%) | L-2 | Rejected-Finance Rejected as L-2 |
| 3 | L-3₹37.1 L+₹15.4 L (70.5%)Rejected-Finance | ₹37.1 L+₹15.4 L (70.5%) | L-3 | Rejected-Finance Rejected as L-3 |
| 4 | L-4₹37.2 L+₹15.4 L (70.9%)Rejected-Finance WARD NO 06 RANJCET DAFAI AMLAI COLLIERY DISTT ANUPPUR M P | ANUPPUR | ANUPPUR | MADHYA PRADESH | ₹37.2 L+₹15.4 L (70.9%) | L-4 | Rejected-Finance Rejected as L-4 |
| Sl No | Description | Qty | Unit | M/S D K SINGH | UDAY RAJ SINGH | RAVI KUMAR JAISWAL | SURENDRA KUMAR SINGH |
|---|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading Part (A) labour Cost | |||||||
| 1.01 | Cleaning/ removal of debris/stone from galleries and stacking within 50m distance | 71.62 | m3 | 21,486 ₹25,353.48 | 42,542.28 ₹50,199.89 | 17,905 ₹21,127.9 Lowest | 42,542.28 ₹50,199.89 |
| 1.02 | Cutting in soft stone by Chisel & Hammer | 15.19 | m3 | 45,570 ₹53,772.6 Lowest | 91,231.14 ₹1,07,652.75 | 56,051.1 ₹66,140.3 | 91,231.14 ₹1,07,652.75 |
| 1.03 | Cutting of coal by using chisel/pick-axe | 30.59 | m3 | 30,590 ₹36,096.2 Lowest | 50,473.5 ₹59,558.73 | 30,987.67 ₹36,565.45 | 50,473.5 ₹59,558.73 |
| 1.04 | RCC (1:2:4) in wall/roof ceiling of air crossing/ stopping (any thickness) in u/g (Excluding centring, shuttering, reinforcement cutting, bending, placing in position and binding etc all complete as well as cost of RCC materials) | 130.64 | m3 | 3,91,920 ₹4,62,465.6 Lowest | 7,01,536.8 ₹8,27,813.42 | 4,31,112 ₹5,08,712.16 | 7,01,536.8 ₹8,27,813.42 |
| 1.05 | Cement concrete/PCC (1:2:4) in foundation /plinth / flooring/wall (any thickness) in u/g (Excluding centring, shuttering and cost of CC materials) | 4.34 | m3 | 13,020 ₹15,363.6 | 18,965.8 ₹22,379.64 | 11,661.58 ₹13,760.66 Lowest | 18,965.8 ₹22,379.64 |
| 1.06 | Centring, shuttering, finishing and reinforcement including cutting, bending, placing in position and binding and strutting, propping etc complete. | 635.05 | m2 | 2,54,020 ₹2,99,743.6 Lowest | 6,54,101.5 ₹7,71,839.77 | 2,85,772.5 ₹3,37,211.55 | 6,54,101.5 ₹7,71,839.77 |
| 1.07 | 06 mm Thick cement plaster/cement punning (1:4) to RCC/PCC work in u/g including curing etc complete(exclusive cost of materials) | 1,019.04 | m2 | 2,03,808 ₹2,40,493.44 | 3,82,140 ₹4,50,925.2 | 1,92,598.56 ₹2,27,266.3 Lowest | 3,82,140 ₹4,50,925.2 |
| 1.08 | White washing in u/g with white lime to give an even shade on old work/new work | 675.63 | m2 | 6,756.3 ₹7,972.43 | 11,485.71 ₹13,553.14 | 5,405.04 ₹6,377.95 Lowest | 11,485.71 ₹13,553.14 |
| 1.09 | Loading of all kinds of building materials into Tub at Incline/pit mouth on surface with lead of 50m
Cement | 937 | bag | 8,433 ₹9,950.94 | 9,838.5 ₹11,609.43 | 5,622 ₹6,633.96 Lowest | 9,838.5 ₹11,609.43 |
Tender Value
₹34.1 L
EMD Value
₹42,600
Closing Date
15 Apr 2026, 5:00 pmClosed
STAFF OFFICER MINING
OFFICE OF THE STAFF OFFICER MINING
Construction of 23 Nos. RCC Sectionalization stoppings in VI Top Seam at Bangwar UG Mine
2026_SECL_357689_1
SECL/SGP/SO(M)/2025-26/NIT-724 dated 28-03-2026
Open Tender
Civil Works - Others
Item Rate
365 days
BANGWAR UG MINE
as per NIT
8 documents required · 8 mandatory
₹42,600
23 Jun 2026
28 Mar 2026
17 Apr 2026
28 Mar 2026
15 Apr 2026
30 Mar 2026
28 Mar 2026 - 7 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description/ Heading Part (A) labour Cost | |||||
| 1.01 | Cleaning/ removal of debris/stone from galleries and stacking within 50m distance | - | m3 | 545.17 | - |
| 1.02 | Cutting in soft stone by Chisel & Hammer | - | m3 | - | - |
| 1.03 | Cutting of coal by using chisel/pick-axe | - | m3 | - | - |
| 1.04 | RCC (1:2:4) in wall/roof ceiling of air crossing/ stopping (any thickness) in u/g (Excluding centring, shuttering, reinforcement cutting, bending, placing in position and binding etc all complete as well as cost of RCC materials) | - | m3 | - | - |
| 1.05 | Cement concrete/PCC (1:2:4) in foundation /plinth / flooring/wall (any thickness) in u/g (Excluding centring, shuttering and cost of CC materials) | - | m3 | - | - |
| 1.06 | Centring, shuttering, finishing and reinforcement including cutting, bending, placing in position and binding and strutting, propping etc complete. | - | m2 | - | - |
| 1.07 | 06 mm Thick cement plaster/cement punning (1:4) to RCC/PCC work in u/g including curing etc complete(exclusive cost of materials) | - | m2 | - | - |
| 1.08 | White washing in u/g with white lime to give an even shade on old work/new work | - | m2 | 15.86 | - |
| 1.09 | Loading of all kinds of building materials into Tub at Incline/pit mouth on surface with lead of 50m
Cement | - | bag | 9.69 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.75 MB
Tendernotice_2.pdf
PDF • 1.47 MB
BOQ_370553.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .