Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹21.8 LAdmitted-Finance CAMP WARD NO 17 GHAROULA MOHALLA NEW BUS STAND SHAHDOL DIST SHAHDOL MP PIN 484001 | SHAHDOL | MADHYA PRADESH | 484001 | ₹21.8 L | Admitted-Finance |
| 2 | ₹22.5 LAdmitted-Finance CAMP VILLAGE DEVGAI POST KUDRI SHADOL MP PIN 484110 | SHAHDOL | MADHYA PRADESH | 484110 | ₹22.5 L | Admitted-Finance |
| 3 | ₹37.1 LAdmitted-Finance | ₹37.1 L | Admitted-Finance |
| 4 | ₹37.2 LAdmitted-Finance WARD NO 06 RANJCET DAFAI AMLAI COLLIERY DISTT ANUPPUR M P | ANUPPUR | ANUPPUR | MADHYA PRADESH | ₹37.2 L | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S D K SINGH | UDAY RAJ SINGH | RAVI KUMAR JAISWAL | SURENDRA KUMAR SINGH |
|---|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading Part (A) labour Cost | |||||||
| 1.01 | Cleaning/ removal of debris/stone from galleries and stacking within 50m distance | 71.62 | m3 | 21,486 ₹25,353.48 | 42,542.28 ₹50,199.89 | 17,905 ₹21,127.90 | 42,542.28 ₹50,199.89 |
| 1.02 | Cutting in soft stone by Chisel & Hammer | 15.19 | m3 | 45,570 ₹53,772.60 | 91,231.14 ₹1.1 L | 56,051.1 ₹66,140.30 | 91,231.14 ₹1.1 L |
| 1.03 | Cutting of coal by using chisel/pick-axe | 30.59 | m3 | 30,590 ₹36,096.20 | 50,473.5 ₹59,558.73 | 30,987.67 ₹36,565.45 | 50,473.5 ₹59,558.73 |
| 1.04 | RCC (1:2:4) in wall/roof ceiling of air crossing/ stopping (any thickness) in u/g (Excluding centring, shuttering, reinforcement cutting, bending, placing in position and binding etc all complete as well as cost of RCC materials) | 130.64 | m3 | 3,91,920 ₹4.6 L | 7,01,536.8 ₹8.3 L | 4,31,112 ₹5.1 L | 7,01,536.8 ₹8.3 L |
| 1.05 | Cement concrete/PCC (1:2:4) in foundation /plinth / flooring/wall (any thickness) in u/g (Excluding centring, shuttering and cost of CC materials) | 4.34 | m3 | 13,020 ₹15,363.60 | 18,965.8 ₹22,379.64 | 11,661.58 ₹13,760.66 | 18,965.8 ₹22,379.64 |
| 1.06 | Centring, shuttering, finishing and reinforcement including cutting, bending, placing in position and binding and strutting, propping etc complete. | 635.05 | m2 | 2,54,020 ₹3.0 L | 6,54,101.5 ₹7.7 L | 2,85,772.5 ₹3.4 L | 6,54,101.5 ₹7.7 L |
| 1.07 | 06 mm Thick cement plaster/cement punning (1:4) to RCC/PCC work in u/g including curing etc complete(exclusive cost of materials) | 1,019.04 | m2 | 2,03,808 ₹2.4 L | 3,82,140 ₹4.5 L | 1,92,598.56 ₹2.3 L | 3,82,140 ₹4.5 L |
| 1.08 | White washing in u/g with white lime to give an even shade on old work/new work | 675.63 | m2 | 6,756.3 ₹7,972.43 | 11,485.71 ₹13,553.14 | 5,405.04 ₹6,377.95 | 11,485.71 ₹13,553.14 |
| 1.09 | Loading of all kinds of building materials into Tub at Incline/pit mouth on surface with lead of 50m
Cement | 937 | bag | 8,433 ₹9,950.94 | 9,838.5 ₹11,609.43 | 5,622 ₹6,633.96 | 9,838.5 ₹11,609.43 |
Tender Value
₹34.1 L
EMD Value
₹42,600
Closing Date
15 Apr 2026, 5:00 pmClosed
STAFF OFFICER MINING
OFFICE OF THE STAFF OFFICER MINING
Construction of 23 Nos. RCC Sectionalization stoppings in VI Top Seam at Bangwar UG Mine
2026_SECL_357689_1
SECL/SGP/SO(M)/2025-26/NIT-724 dated 28-03-2026
Open Tender
Civil Works - Others
365 days
BANGWAR UG MINE
as per NIT
8 documents required · 8 mandatory
₹42,600
20 May 2026
28 Mar 2026
17 Apr 2026
28 Mar 2026
15 Apr 2026
30 Mar 2026
28 Mar 2026 - 7 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Item Description/ Heading Part (A) labour Cost | ||||||
| 1.01 | Cleaning/ removal of debris/stone from galleries and stacking within 50m distance | - | m3 | 545.17 | - | item1 |
| 1.02 | Cutting in soft stone by Chisel & Hammer | - | m3 | - | - | item2 |
| 1.03 | Cutting of coal by using chisel/pick-axe | - | m3 | - | - | item3 |
| 1.04 | RCC (1:2:4) in wall/roof ceiling of air crossing/ stopping (any thickness) in u/g (Excluding centring, shuttering, reinforcement cutting, bending, placing in position and binding etc all complete as well as cost of RCC materials) | - | m3 | - | - | item4 |
| 1.05 | Cement concrete/PCC (1:2:4) in foundation /plinth / flooring/wall (any thickness) in u/g (Excluding centring, shuttering and cost of CC materials) | - | m3 | - | - | item5 |
| 1.06 | Centring, shuttering, finishing and reinforcement including cutting, bending, placing in position and binding and strutting, propping etc complete. | - | m2 | - | - | item6 |
| 1.07 | 06 mm Thick cement plaster/cement punning (1:4) to RCC/PCC work in u/g including curing etc complete(exclusive cost of materials) | - | m2 | - | - | item7 |
| 1.08 | White washing in u/g with white lime to give an even shade on old work/new work | - | m2 | 15.86 | - | item8 |
| 1.09 | Loading of all kinds of building materials into Tub at Incline/pit mouth on surface with lead of 50m
Cement | - | bag | 9.69 | - | item9 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.75 MB
Tendernotice_2.pdf
PDF • 1.47 MB
BOQ_370553.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid