Construction of inspection cradle of Bridge No. 46, FOB at Saragaon station, Modification/Construction of platform at Akaltara station and other associated balance work for construction of 4th line between Akaltara and Saragaon station.
CAO-C-BSP-25-26-21~SECR
CAO-C-BSP-25-26-21
Open
Works - General
12 Months
Raipur, Chhattisgarh
₹0
₹6.8 L
23 Jan 2026
1 Jan 2026
9 Jan 2026
1-Execution of All Works As Detailed In Schedule -A (Service Building) 22645511.20 Below/P
2-Execution of All Works As Detailed In Schedule -B (Retaining wall,
3-Execution of All Works As Detailed In Schedule -C Other Items(DSR-
4-Execution of All Works As Detailed In Schedule -D Other
5-Execution of All Works As Detailed In Schedule -E Earthwork in
6-Execution of All Works As Detailed In Schedule -F Bridges (USSOR-
7-Execution of All Works As Detailed In Schedule -G (NS Items-III Other
8-Execution of All Works As Detailed In Schedule -H (Supply of Cement
9-Execution of All Works As Detailed In Schedule -I (Supply of
Item Breakup - 1-Execution of All Works As Detailed In Schedule -A (Service Building)
and Height Gauge on DSR 2021)
Item- 1 Retaining wall, Drain, Service Road and Height Gauge (DSR-2021)
S No. Item Description of Item Unit Qty Rate Amount
2.0 EARTH WORK
Earth work in excavation by mechanical
means (Hydraulic excavator) / manual
means in foundation trenches or drains (not
exceeding 1.5 m in width or 10 sqm on
2.8 plan), including dressing of sides and
ramming of bottoms, lift upto 1.5 m,
including getting out the excavated soil and
disposal of surplus excavated soil as
directed, within a lead of 50 m.
2.25 Filling available excavated earth (excluding cum 2500 253.95 634875
rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding
20cm in depth, consolidating each
deposited layer by ramming and watering,
lead up to 50 m and lift upto 1.5 m.
4.0 CONCRETE WORK
4.1S CEMENT CONCRETE (CAST IN SITU)
Providing and laying in position cement
concrete of specified grade excluding the
cost of centering and shuttering - All work
up to plinth level :
derived from natural sources : 3 graded
stone aggregate 20 mm nominal size
derived from natural sources)
5.0 REINFORCED CEMENT CONCRETE
5.9S FORM WORK
Centering and shuttering including strutting,
propping etc. and removal of form for
5.9.1 Foundations, footings, bases of columns, Sqm 4000 307.95 1231800
etc. for mass concrete
5.9.2 Walls (any thickness) including attached Sqm 6000 669.55 4017300
5 pilasters, butteresses, plinth and string
5.33S DESIGN MIX CONCRETE
CAO-C-HQ-ENGINEERING/SOUTH EAST CENTRAL RLY
Providing and laying in position ready mixed
or site batched design mix cement concrete
for reinforced cement concrete work; using
coarse aggregate and fine aggregate
derived from natural sources, Portland
Pozzolana / Ordinary Portland /Portland Slag
c e m e n t , admixtures in recommended
proportions as per IS: 9103 to accelerate /
retard setting of concrete, to improve
durability and workability without impairing
strength; including pumping of concrete to
site of laying, curing, carriage for all leads;
but excluding the cost of centering,
shuttering, finishing and reinforcement as
per direction of the engineer-in-charge; for
the following grades of concrete. Note: Extra
cement up to 10% of the minimum specified
cement content in design mix shall be
payable separately. In case the cement
content in design mix is more than 1.10
times of the specified minimum cement
content, the contractor shall have discretion
to either re-design the mix or bear the cost
of extra cement.
5.33.1 All works upto plinth level
cement content of 330 kg /cum
All works above plinth level upto floor V
cement content of 330 kg /cum
Schedule Schedule 5-Execution of All Works As Detailed In Schedule -E Earthwork in formation (USSOR-2021)
Item- 1 Earthwork in Formation (USSOR-2021)
S No. Item Description of Item Unit Qty Rate Amount
Earthwork in filling in embankment, guide
bunds, around buried type abutments,
bridge gaps, trolley refuges, platforms etc.
with contractor's own earth conforming to
Soil Quality Class SQ1/SQ2/SQ3, after
preparation of foundations as applicable,
benching in existing banks wherever
required, spreading in layers with motor
grader, bringing the moisture content to
OMC, mechanical compaction to specified
density and dressing of bank to final profile
as per RDSO Specifications: RDSO/2020/GE:
IRS-0004 with latest correction slips. Note:
1) Foundation preparation, Benching
including additional earthwork on account of
this, wherever required, shall be paid extra
under relevant schedule item for benching.
2) Payment for Earthwork under this item
shall be made based on the cross section
measurements calculated (i) with original
ground profile of existing bank based on
initial ground levels before doing benching
and (ii) final profile of the bank worked out
with final levels as per prevailing guidelines.
CAO-C-HQ-ENGINEERING/SOUTH EAST CENTRAL RLY
Earthwork in cutting in formation, trolley
refuges, side drains, level crossing
approaches, platforms, catch water drains,
diversion of nallah & finishing to required
dimension and slopes to obtain a neat
appearance to standard profile inclusive of
all labour, materials, plant & machinery,
leading all cut spoils either to make spoil
dumps or for filling in embankment with
leads within 2 km on either side of edge of
the cutting(s) including all lifts, ascent,
descent, loading, unloading, bailing &
pumping out water, if required, clearance of
site and all other works incidental thereto
for completing the work as per RDSO
Specification No. RDSO/2020/GE: IRS-0004
with latest updated correction slips and to
the satisfaction of the Engineer-in-Charge.
Note: (i) All usable earth arising from cut
spoils shall be led into bank formation and
Unusable spoils shall be dumped / stacked
away from toe of embankment. (ii) All hard
rock /and boulders not fit for filling will be
stacked by the contractor and will be
property of the Railways. (iii)Cut trees shall
be property of Railways and to be deposited
in the railway godown unless specified
otherwise in the Conditions of Contract.
2 012011 In all conditions and classifications of soil cum 6500.00 101.89 662285.00
3 012040 Manufacturing of blanketing material by wet cum 2700.00 827.35 2233845.00
mixing of naturally available suitable soil
including additional blending with naturally
a v a ila b le or manufactured material as
required to achieve specified gradation, in
designed proportion in Pug mill or wet mix
plant to have uniform gradation including all
incidental transportation, laying over
finished formation in uniform layer(s) with
motor grader, compaction with suitable
vibratory roller to specified density and
finishing to correct profile, complete as per
RDSO Specification No. RDSO/2020/GE: IRS-
0004 with latest correction slips.
Turfing / planting, including all lead & lift
and watering as required until properly
rooted with. Note: Initially payment of only
40% will be made. Balance 60% will be paid
after 3 months of maintenance period, only
if the turfing is properly rooted on entire
Turfing with planted doob grass.
Providing portable fencing along running
track where work is to be done in close
vicinity of track, maintaining during
execution of work and removing after
completion of the work as per direction of
the Engineer. Fencing shall consist of self
supporting steel angles of size 50mm x
50mm x 6mm, 1.5m long provided with
hooks etc. and embedded in CC 1:2:4 block
of size 0.23m x 0.23m x 0.23m placed at c/c
distance of 2m along track. 12mm dia rods
in three horizontal layers shall be tack
welded with angle posts. Note : Released
material will be property of the contractor
after completion of work. Cost of cement
required for CC blocks shall be paid
CAO-C-HQ-ENGINEERING/SOUTH EAST CENTRAL RLY
reflective tape in horizontal direction, duly
secured/tight with vertical posts.
Schedule Schedule 6-Execution of All Works As Detailed In Schedule -F Bridges (USSOR-2021)
Item- 1 Bridges (USSOR-2021)
S No. Item Description of Item Unit Qty Rate Amount
Supplying, fabrication, assembling of all
types of steel girders of specified spans with
structural steel conforming to Quality "B0"
Grade Designation E250 conforming to
IS:2062, erection / slewing / end launching
of steel girders with cranes or any other
approved launching methods as per site
conditions (not requiring traffic block) on
sub-structure including provision of trolley
refuges etc., complete as per approved QAP
and drawings conforming to IRS-B1-2001
and other relevant codes and specifications.
Note: 1. Detailed fabrication and erection
drawings & launching methodology will be
prepared by the contractor and got
approved from Railway. 2. The rate is all
inclusive including launching in position,
complete in all respect except cost of (i)
Painting / Metalising; (ii) Bearings & (iii)
HSFG bolts which shall be paid extra under
relevant item. 3. The payment shall be
made on the theoretical weight of main
components and gusset plates only. 4.
Payment Schedule: (i) Receipt of material at
site: 40% (ii) Fabrication of girders: 20% (iii)
Erection/Launching: 20% (iv) Completion in
all respects: 20%
1 041011 Plate Girder/Semi Through Girder/Composite MT 80.00 130208.10 10416648.00
Girder (Steel Work)
Metallizing of steel work of girders with
sprayed aluminium after surface preparation
by Sand/grit blasting, followed by one coat
of etch primer (IS:5666) & one coat of Zinc
Chrome primer (IS:104) and two coats of
aluminium paint (IS:2339) with all labour,
T&P and material as a complete job duly
conforming to all relevant specifications and
process given under Clause 39 of IRS-B1-
2001. Note: Nominal Thickness of sprayed
Aluminium coating shall be 150 microns.
DFT of Zinc chrome primer shall be 25-30
microns and DFT of each coat of Aluminium
paint shall be 12-14 microns.
3 041080 Supplying, Fabricating and fixing access MT 125.00 102400.15 12800018.75
ladders, inspection platforms, Trolley
refuges etc., on bridges with structural steel
conforming to IS:2062 including welding /
bolting, priming painting with one coat of
ready mixed paint of Zinc Chromate (IS:104)
with DFT of 25-30 microns followed by one
coat of Zinc Chrome Red Oxide (IS:2074)
with DFT of 25 microns with all material,
labour, T&P as a complete job. Note:
Painting shall be paid separately under
Painting of cleaned plate/composite bridge
girders including all scaffolding along with
provision of Jhoola / hanging scaffolding
ladders etc. where required.
CAO-C-HQ-ENGINEERING/SOUTH EAST CENTRAL RLY
4 041263 With two coats of Aluminium paint in dual Sqm 1500.00 96.70 145050.00
containers conforming to IS:2339 with DFT
of 15 - 20 Microns for each coat.
Painting cleaned triangulated bridge girders
including all scaffolding, along with
provision of Jhoola / hanging scaffolding
ladder where required.
5 041271 With one coat ready mix Zinc Chromate Sqm 5000.00 113.63 568150.00
conforming to IS:104 with DFT of 25-30
Microns followed by one coat of Zinc
Chrome red oxide conforming to IS:2074
with DFT of 25 Microns.
6 041273 With two coats Aluminium paint in dual Sqm 5000.00 114.72 573600.00
containers conforming to IS:2339 with DFT
of 15 - 20 Microns for each coat.
Removing of existing bed plate from
existing bed block, supply, fabrication and
erection of new bed plate of approved sizes
in exact position over bed block of
pier/abutments by giving full and even
bearing, setting them on the layer of free
flow non-shrinkable grouting compound,
scrapping or chipping of bed block, if
required, fabrication and fixing of holding
down HTS bolts of suitable sizes along with
nuts, washers etc., drilling holes of required
size, grouting of holes by epoxy mortar
after fixing holding down bolts. Total work to
be done during traffic block. Cost of holding
down HTS bolts shall be paid extra under
relevant item for supply of HTS holding
7 041294 Supply of HTS holding down bolts with nuts, Kg 800.00 113.15 90520.00
Schedule Schedule 8-Execution of All Works As Detailed In Schedule -H (Supply of Cement on USSOR-2021)
Item- 1 Supply of Reinforcement (USSOR-2021)
S No. Item Description of Item Unit Qty Rate Amount
Supply and using Cement at Worksite
Schedule 9-Execution of All Works As Detailed In Schedule -I (Supply of Reinforcement on USSOR-
Item- 1 Supply of Reinforcement (USSOR-2021)
S No. Item Description of Item Unit Qty Rate Amount
Supply of steel reinforcement of approved
brands/makes for R.C.C. work including
straightening, cutting, bending, placing in
position and binding all complete.
1 025082 Thermo-Mechanically Treated bars of grade Kg 238345.00 105.57 25162081.65
Fe-500D or more of approved
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TenderDoc25-26-21.pdf
ATTACHMENT
GCCACS102.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .