Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹52.7 L
EMD Value
₹1.1 L
Closing Date
25 Jun 2026, 5:00 pmClosed
SM_TENDER CELL
GNIDA OFFICE
Construction of 11 KV 24X7 un-interrupted power supply of 6 Percent abadi plot in village Dadha Greater Noida.
2026_GNIDA_1160676_21
SM/(E-TENDER CELL)/2026/758 DATED-11.06.2026
Open Tender
Electrical Works
Fixed-rate
90 days
GREATER NOIDA
REFER TENDER DOCUMENT
5 documents required · 5 mandatory
₹1,710
₹1.1 L
2 Jul 2026
16 Jun 2026
29 Jun 2026
16 Jun 2026
25 Jun 2026
16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | BOQ | - | - | - | - |
| - | Supply and laying of 3 core standered aluminium conductor XLPE (Cross linked polyethylene) insulated PVC bedded. Galvanised flat steel strip armoured cables confirming to 1.S. 7098 (Part-11 with latest amendments) 11 KV grade at a depth of 900 min below ground level over a cushion of 100 mm thick fine river sand all around and protected with well burnt bricks on sides and on top put across. The armouring of cable shall be properly connected with earth conductor by clamps etc. GNIDA 2/d | - | - | - | - |
| - | 11KV XLPE Cable 300x3C | 2,500 | Mtr | 1,692 | ₹42,30,000 |
| 2 | S/E of Section Double pole structure on ST pole 410 SP-62 with 1/6 over length of poles grounted with cement conerete in 1:3:6 Cone cement: 3 coarse sand 6 Stone balleast) including plingthing of pole 30 em above grade level. plastering of plinth including excavation & back filling ete. The double pole structure consist of 100X50X2.24 mtr. & 75X40 mm 2.24 mtr. M.S. channel and bracings with M.S. clamp packing piece Nuts Bolts etc. The rates includes all materials labour T&P etc. required for proper completion I work as per direction of E/I GNIDA-28 | 6 | Nos | 66,298 | ₹3,97,788 |
| 3Supply. Delivery. Installation, Testing & Commissioning of 11 KV Out door type cable termination kit of 3 core cable for cable termination at the panel & transformer complete in all respects as required for proper completion of work. (650mm length) GNIDA-5/d (make Raychem/C.C.L/Frontec) | |||||
| - | 3CX300 Sq.mm. | 8 | Nos | 12,921 | ₹1,03,368 |
| 4Supply. Delivery. Installation. Testing & Commissioning of 11 KV in door type cable jointing kit of 3 core cable for cable joint complete in all respects as required for proper completion of work. (650mm length) GNIDA-4/d (make Raychem/C.C.I./Frontee) | |||||
| - | 3CX300 Sq.mm. | 4 | Nos | 10,792 | ₹43,168 |
| 5 | Supply & erection of strut consisting 410 SP-58 12 mtr long ST pole with M.S clamp complete with grouting ete complete in all respect etc as per Direction of Engineer in charge. GNIDA-30 | 8 | Nos | 23,554 | ₹1,88,432 |
| 6 | Supply & erection of stay set at least 3.5 Metres away from the pole complete with galvanised 19 mm día x1.80 Metre long stay rod. 30 cm x 30 cm x 6.3 mm anchor plate. thimble stay clamps. stay insulator. 19 mm x 600 double screw tightener. 7/4.00 mm G.1 stay wire etc. in 1:3:6 cement concrete complete in all respect.UPPWD-2018, S.N- 631 | 10 | Nos | 3,029 | ₹30,290 |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.08 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.37 MB
BOQ_2175566.xls
BOQ • 0.24 MB
PreQ_Cons_11KV_24X7_UN_Inter_Power_Vill_Dadha.pdf
Tender Documents • 1.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .