| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC 140 1 110 N S C BOSE ROAD REGENT PARK KOLKATA WEST BENGAL 700040 | KOLKATA | KOLKATA | WEST BENGAL | 700040 | ₹1.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.1 Cr+₹2.1 L (1.99%)Rejected-AOC | ₹1.1 Cr+₹2.1 L (1.99%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.1 Cr+₹5.7 L (5.35%)Rejected-AOC 522 C D H ROAD 1ST FLOOR ROOM NO 3 KOLKATA 700034 | KOLKATA | KOLKATA | WEST BENGAL | 700034 | ₹1.1 Cr+₹5.7 L (5.35%) | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
29 Apr 2017, 5:30 pmClosed
Director General ( Water Supply )
5, S. N. Banerjee Road, Kolkata-13.
OPERATION AND MAINTENANCE OF PLANT, MACHINERIES AND GARDEN LIGHTING INCLUDING CHLORINATION AND UP-KEEPING OF STATION BUILDING AT MOHINI CHAUDHURI (SENPALLY) BOOSTER PUMPING STATION
2017_KMC_107498_1
KMC/DGWS/SENPALLY_BPS/16-17( R)
Open Tender
Electrical Work/ Equipment
Multi-stage
1095 days
MOHINI CHAUDHURI (SENPALLY) BOOSTER PUMPING STATIO
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
Kolkata Municipal Corporation
₹1.5 L
10 Sept 2020
1 Apr 2017
3 May 2017
1 Apr 2017
29 Apr 2017
1 Apr 2017
Amount
Operation & Maintenance of plant and machineries of 6.6 KV or above voltage item level including necessary preventive maintenance and continuous monitoring of the plant equipments and electrical panels and Yard lighting deploying necessary manpower on 24/7 basis as per direction of Engineer in charge also up-keeping the station building,toilets,campus area & path waya to clean and to make proper disinfection daily by engaging 01 (one) no. sweeper-cum Mathor and cleaning the compound premises of shrubs,plants,jungles of 4030sq.M etc.by cutting and removing five times in a year as directed by Engineering In Charge complying requirement of Tender document Volume-1. . (For the period of first 12 months.
Labour component (75% of Total cost) : This monthly cost remains unaltered from the date of commencement of work till a new order (as per circular of mpl. Secretary as indicated in the Tender Document ) comes in effect. This also indicates the base cost upon which the first increment will be in effect.
Other than labour component (25% of Total cost) : This monthly cost remains unaltered from the date of commencement of work till end of first twelve months. This also indicates the base cost upon which monthly cost of second year will be determined.
Operation & Maintenance of plant and machineries of 6.6 KV or above voltage item level including necessary preventive maintenance and continuous monitoring of the plant equipments and electrical panels and Yard lighting deploying necessary manpower on 24/7 basis as per direction of Engineer in charge also up-keeping the station building,toilets,campus area & path waya to clean and to make proper disinfection daily by engaging 01 (one) no. sweeper-cum Mathor and cleaning the compound premises of shrubs,plants,jungles of 4030sq.M etc.by cutting and removing five times in a year as directed by Engineering In Charge complying requirement of Tender document Volume-1.(For the period of subsequect 12 months).
Labour component (75% of Total cost) : This monthly cost remains unaltered from the commencement of just previous determined rate till a new order (as per circular of Mpl. Secretary as indicated in the Tender Document ) comes in effect. This also indicates the base cost upon which the next increment will be in effect.
Other than labour component (25% of Total cost) :This monthly cost is increased at the rate of three percent on the monthly rate of previous year. This also indicates the base cost upon which monthly cost of subsequent year will be determined.
Operation & Maintenance of plant and machineries of 6.6 KV or above voltage item level including necessary preventive maintenance and continuous monitoring of the plant equipments and electrical panels and Yard lighting deploying necessary manpower on 24/7 basis as per direction of Engineer in charge also up-keeping the station building,toilets,campus area & path waya to clean and to make proper disinfection daily by engaging 01 (one) no. sweeper-cum Mathor and cleaning the compound premises of shrubs,plants,jungles of 4030sq.M etc.by cutting and removing five times in a year as directed by Engineering In Charge complying requirement of Tender document Volume-1..(For the period of subsequect 12 months).
Labour component (75% of Total cost) : This monthly cost remains unaltered from the commencement of just previous determined rate till a new order (as per circular of Mpl. Secretary as indicated in the Tender Document ) comes in effect. This also indicates the base cost upon which the next increment will be in effect.
Other than labour component (25% of Total cost) :This monthly cost is increased at the rate of three percent on the monthly rate of previous year. This also indicates the base cost upon which monthly cost of subsequent year will be determined.
TOTAL(1ST+2ND+3RD) YEAR OF SCHEDULE 1
1ST YEAR RATE OF SCHEDULE-II
2ND YEAR RATE OF SCHEDULE-II(1ST YEAR RATE X1.05)
3RD YEAR RATE OF SCHEDULE-II(2ND YEAR RATE X 1.05)
TOTAL(1ST+2ND+3RD) YEAR OF SCHEDULE 1
ROY ELECTRIC
GHOSH ELECTRICAL AND ELECTRONICS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .