Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹66,350Accepted-AOC | L1 | Accepted-AOC REASONABLE | |
| 2 | L2₹67,500+₹1,150 (1.73%)Rejected-Finance VIKASH NAGAR RAMGARH CANTT HAZARIBAGH JHARKHAND 829122 | RAMGARH | JHARKHAND | 829122 | L2 | Rejected-Finance HIGH RATE | |
| 3 | L3₹68,500+₹2,150 (3.24%)Rejected-Finance | L3 | Rejected-Finance HIGH RATE | |
| 4 | L4₹69,300+₹2,950 (4.45%)Rejected-Finance | L4 | Rejected-Finance HIGH RATE | |
| 5 | L5₹69,330+₹2,980 (4.49%)Rejected-Finance | L5 | Rejected-Finance HIGH RATE |
Tender Value
Refer Docs
Closing Date
14 Sept 2020, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AGE I AF SINGARSI
AGE I AF SINGARSI
REPAIR REWINDING TO INDUCTION MOTOR 75 HP INSTALLED AT BOOSTER PUMP HOUSE AT AGE I AF SINGARSI
2020_MES_375140_1
3011/2/E3
Limited
Job Works
Item Rate
30 days
AGE I AF SINGARSI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
10 Oct 2020
5 Sept 2020
15 Sept 2020
5 Sept 2020
14 Sept 2020
7 Sept 2020
30 days
Amount
Dismantling of 75 HP squirrel cage induction motor (Make : Kirloskar) from pump after disconnection of mechanical tyre coupling and unbolting from foundation base plate,discconection of electric connection from terminal, loading/unloading the motor to vehicle and transportation of the motor from Singarsi to workshop ( Pakur / Nalhati / Dumka ) for repair / replacement, open the motor and cutting the burnt winding and clean the rotor & stator with CTC or other cleaning agent and M & L re-winding of stator winding with super enamelled copper wire of gauge and turn as per existing, insulating the leads with insulating tubes and varnishing the stator with good quality of insulating varnish and after that, heating the stator in heat chamber for continuous two days for better insulation resistance. Re-assembling the stator & rotor carefully after replacement of worn out bearings as per existing and again transportation of the motor through vehicle from workshop to Singarsi including loading/unloading the motor on its base frame, connection of motor with pump with tyre coupling and fixing to the base frame by bolts incl super enamelled copper wire of existing gauge / size / quality to match with the existing as comply with Indian Standard Specification. After checking up the alignment, testing of motor with megger for checking of insulation resistances, electric connection of motor to the control panel, testing on load for continous running for three hours complete all as specified and directed by Engr-in-Charge.
M/S AWDHESH KUMAR CO AND BROS
M/S JAI MATA DI ENTERPRISES
MAA SHANTI ENTERPRISES
GUPTA ENTERPRISE
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .