| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.4 CrAccepted-AOC | ₹13.4 Cr | 1 | Accepted-AOC Lowest bidder |
| 2 | 2₹14.0 CrRejected-Finance 201 2ND FLOOR IRIS TECH PARK SECTOR 48 SOHNA ROAD GURGAON 122018 HARYANA | GURUGRAM | HARYANA | 122018 | ₹14.0 Cr | 2 | Rejected-Finance rates are higher |
| 3 | 3₹14.6 CrRejected-Finance 37 205 A 2 A 1 BUNDHU KATRA GWALIOR ROAD AGRA 282001 | AGRA | UTTAR PRADESH | 282001 | ₹14.6 Cr | 3 | Rejected-Finance rates are higher |
| 4 | 4₹14.8 CrRejected-Finance N A | ₹14.8 Cr | 4 | Rejected-Finance rates are higher |
| 5 | 5₹15.3 CrRejected-Finance HOUSE NO 120P HOUSE NO 120P SECTOR 4 REWARI 123401 | REWARI | HARYANA | 123401 | ₹15.3 Cr | 5 | Rejected-Finance rates are higher |
Tender Value
₹14.9 Cr
EMD Value
₹29.7 L
Closing Date
17 Sept 2021, 5:00 pmClosed
Executive Engineer (EDC), Infra-I, GMDA, Gurugram
Plot no.03 Sector 44 Gurugram
Special repair on Sector Dividing Road 82A/83, 82/83 (Asset ID 69), 84/85 and 88/89 (Asset id 80),Gurugram.
2021_HRY_185434_1
Job No. 09/2021/EDC/Infra-I
Open Tender
Civil Works
180 days
Gurugram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹29.7 L
Yes
8 Feb 2022
27 Aug 2021
20 Sept 2021
27 Aug 2021
17 Sept 2021
27 Aug 2021
Amount
Providing and applying tack coat with penetration grade bitumen VG - 10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications
Providing and laying 50 mm dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG 30 @ 4.5% by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete, as per technical clause No. 505 of MORT&H specifications
Providing and laying 40 mm bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG 40 @ 5.4% per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of per MORTH specifications
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.85 kg/sqm using mechanical means as per technical clause 503 of MORT&H specifications
Hiring of one No. tractor trolley including diesel/lubricant & maintenance and along with 10 Nos. Beldar with kassi & basket etc, for eight hours Working for lifting of material GSB/ construction material waste/metal/earth etc & filling in tractor trolley complete and filling of potholes manually by labour as per site requirement of material at site. Including all the charges, taxes and contractor profit etc, complete in all respect, and entire satisfaction of Engineer in charge.
Hiring of 1 no. of JCB for lifting of GSB/metal/building waste material/earth and filling in trolley including operator and Diesel etc .Complete in all respect (8 hours per day)
Hiring of 1 no. Dumper for lifting of GSB/metal/building waste material/earth and filling in trolley including operator and Diesel complete in all respect to disposal off to a suitable location (8 hours per day)
PART B (Storm Water Drain) Providing and fixing of pre casted RCC cover slab of minimum size 800x500x145 mm with 5.2 kg/cover with steel bar of 8mm/ 10mm and two nos. plastic balls and iron hooks including labour carriage and material complete all respect
Desilting of existing Surface Drain including disposal of silt on the Designated location decided by GMDA within 5 km
PART C (Footpath) Precast GRC paving tiles M-40, 25 mm thick, including cement mortar and laying, complete in all respect.
Bidder Name
Amount
Sarvodya Infracon Ptd. Ltd.(GSTN-09AAYCS3350E1ZZ)
jain construction co.(GSTN-06AAEFJ4717B1ZT)
KALUWALA CONSTRUCTION PRIVATE LIMITED(GSTN-06AAHCK0172D1ZY)
P C Gupta and Co(GSTN-06AAEPG5955G1ZR)
The Thola Gamdu Coop L&C Society Matindu(GSTN-NA)
KALUWALA CONSTRUCTION PRIVATE LIMITED
P C Gupta and Co
jain construction co.
Sarvodya Infracon Ptd. Ltd.
KALUWALA CONSTRUCTION PRIVATE LIMITED
jain construction co.
P C Gupta and Co
Sarvodya Infracon Ptd. Ltd.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid