| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹10.4 L+₹1.7 L (19.1%)Rejected-Finance | L2 | Rejected-Finance BEING L2, DUE TO HIGH RATE |
Tender Value
₹10.7 L
EMD Value
₹26,855
Closing Date
5 Oct 2022, 10:00 amClosed
Executive Engineer(KandGN)
O/o The DCE(N), ALHW, Campbell Bay
Construction of Compound Wall at B Quarry complex at Campbell Bay.
2022_ALHW_715159_1
ALHW/EEC/CB/DB/TEND-05/2022-23
Open Tender
Construction Works
Item Rate
90 days
Campbell Bay, Great Nicobar Islands
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹26,855
Yes
23 Dec 2022
29 Sept 2022
6 Oct 2022
29 Sept 2022
5 Oct 2022
29 Sept 2022
29 Sept 2022 - 3 Oct 2022
Amount
Construction of Compound Wall at “B” Quarry complex at Campbell Bay.
Earth work in excavation in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m and including cost of all materials, and transportation charges, materials to work site, cost of all labour charges, labour cess, minor tools and GST etc., complete. a) All kinds of soil.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m and including cost of all materials, and transportation charges, materials to work site, cost of all labour charges, labour cess, minor tools and GST etc., complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level and including cost of cement, mainland river sand & stone metal, cost of all other materials, all labour charges, transportation charges of all materials to work site, cost of minor tools and GST etc. complete. a) 1:4:8 (1cement: 4 mainland river sand: 8 graded stone aggregate 40mm nominal size from mainland quarry)
Centering and shuttering including strutting, propping etc. and removal of form work for, including cost of all other materials, all labour charges, transportation charges of all materials to work site, cost of minor tools and GST etc. complete. a) Foundation, footings, bases of columns
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level and including cost of cement, mainland river sand & stone metal, cost of all other materials, all labour charges, transportation charges of all materials to work site, cost of minor tools and GST etc. complete. a) 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from mainland quarry : 3 graded stone aggregate 20 mm nominal size derived from mainland quarry)
Steel reinforcement for R.C.C. work including cost of steel, all labour charges, transportation charges of all materials to work site, straightening, cutting, bending, placing in position and binding all complete upto plinth level, cost of minor tools and GST etc, complete
Providing and fixing up to floor five level precast cement concrete hollow block, including hoisting and setting in position with cement mortar 1:2 (1 cement : 2 coarse sand), including cost of required centering, shuttering, cement, mainland river sand & stone metal, cost of all other materials, all labour charges, transportation charges of all materials to work site, cost of minor tools and GST etc. complete. a) 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from mainland quarry : 3 graded stone aggregate 20 mm nominal size derived from mainland quarry).
12mm thick cement plaster of mix 1:4 including cost of cement, mainland river sand, all labour charges, transportation charges of all materials to work site, cost of minor tools and GST etc, complete.
USR TRANSPORT
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .