Tender Value
₹28.3 L
EMD Value
₹2.8 L
Closing Date
24 Aug 2026, 3:00 pmClosed
CE NNS
CE NNS
Construction work for the boundary wall railings and footpath at the British-era Cemetery in Ward No. 56 Sangam Vihar..
2026_NNSAH_1174588_1
2416 G
Open Tender
Civil Works
Percentage
30 days
saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,298
₹2.8 L
5 Aug 2026
5 Aug 2026
25 Aug 2026
5 Aug 2026
24 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordnary soil including lift upto 30M and including filling watering (S.I - 251) | 131.76 | cum | 110 | ₹14,493.6 |
| 2 | Concrete with 4c.m. gauge brick ballast, fine send of 1:25 R.M. and cement, in proportion of 12:6:1 in foundation and under floors Tools & plants etc. required for proper completion of the work.(S.I - 273) | 27.34 | cum | 2,985 | ₹81,597.96 |
| 3 | Disposal of waste malba from site upto 5.0 km i/c all comp of M-150 Brick Work in 1:3 cement & coarse sand Mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper ompletion of the work. (Sl -307) | 39.46 | cum | 4,765 | ₹1,88,036.43 |
| 4 | Reinforced Cement Concrete with 2c.m.gauge approved stone ballast, coarse sand & cement in the proportion of 3:1.5:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (S.I.289) | 23.33 | cum | 7,800 | ₹1,81,958.4 |
| 5 | Reinforced Cement Concrete with 2c.m.gauge approved stone ballast, coarse sand & cement in the proportion of 3:1.5:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (S.I.289) | 34.41 | cum | 7,800 | ₹2,68,405.8 |
| 6 | Reinforcement and its bending, but including its fixing and binding centering and shuttering etc. and supply of all materials, Labor ,Tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra.S.I.504 | 6,798.76 | kg | 85.29 | ₹5,79,866.24 |
| 7 | M-150 Brick Work in 1:3 cement & coarse sand Mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper ompletion of the work. (S.I. - 307+309) | 84.73 | cum | 4,995 | ₹4,23,211.37 |
| 8 | 12 mm thick plaster with with cement and approved coarse sand mortar in 1:3. over brick work minimum thickness not to be less than 1cm. Including supply of all materials, labour, tools & plants etc. required for proper completion of the work. | 484.2 | sqm | 165 | ₹79,893 |
| 9 | Two coat of painting with synthetic enamel paint (Asian / Berger) over one coat of primer including supply of all materials, labours and T&P etc. (SI- 644) | 484.2 | sqm | 70 | ₹33,894 |
| 10 | Snowcem two coats of approved quality (Acrocem) including supply of all materials, laoburs and T&P etc. (SI - 660) | 484.2 | sqm | 70 | ₹33,894 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.83 MB
BOQ_2206974.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].