Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.5 Cr+₹1.2 L (0.80%)Admitted-Finance | ₹1.5 Cr+₹1.2 L (0.80%) | L2 | Admitted-Finance |
| 3 | L3₹1.6 Cr+₹11.1 L (7.32%)Admitted-Finance | ₹1.6 Cr+₹11.1 L (7.32%) | L3 | Admitted-Finance |
| 4 | L4₹1.6 Cr+₹12.5 L (8.28%)Admitted-Finance | ₹1.6 Cr+₹12.5 L (8.28%) | L4 | Admitted-Finance |
| 5 | L5₹1.6 Cr+₹13.3 L (8.81%)Admitted-Finance | ₹1.6 Cr+₹13.3 L (8.81%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Aakar Infra Engineers PVT Ltd L6 | M/S Kailash Chandra Samal L4 | M/S BHAIRAB CHARAN SWAIN L2 | Ms Gangadhar Jena L1 | NNS CONSTRUCTIONS AND ENGINEERING PRIVATE LIMITED L5 | SUBRAT KUMAR BEHURA L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Engagement of Payloader/Dozer for clearing the area or for any other purpose including Port entry fees, hire & running charges, fuel, lubricants, T&P, all taxes, operation expenses etc. all complete excluding GST and as per direction of Engineer in charge.
NB: No idle hours shall be paid.
For levelling of Road side over burden debrises/ heavy structrals/concrete Blocks etc. | 16 | Each Hour | 2,600 ₹41,600 | 1,200 ₹19,200 | 900 ₹14,400 Lowest | 1,200 ₹19,200 | 1,000 ₹16,000 | 1,200 ₹19,200 |
| 2.00Supply of all labour, T&P for shifting of existing cable line, backfilling, levelling and other alied works including Port entry fees, etc. all complete excluding GST and as directed by the Engineer-in-charge. | |||||||||
| 2.01 | Skilled Labourers. | 60 | Each Manday | 650 ₹39,000 | 610 ₹36,600 | 400 ₹24,000 Lowest | 500 ₹30,000 | 500 ₹30,000 | 560 ₹33,600 |
| 2.02 | Semi-skilled Labourers. | 60 | Each Manday | 600 ₹36,000 | 520 ₹31,200 | 350 ₹21,000 Lowest | 400 ₹24,000 | 400 ₹24,000 | 450 ₹27,000 |
| 3.00 | Furrow cutting to 50mm depth in the existing Bituminous road cleaning the surface with cost of all labour, T&P, all taxes, Port entry fees, transportation, hire and running charges of all machineries and vehicles, etc complete as directed by the Engineer in charge.
North oil jetty area to pump house. | 938 | Each Sqm | 20 ₹18,760 | 50 ₹46,900 | 6 ₹5,628 | 2.8 ₹2,626.4 Lowest | 80 ₹75,040 | 10 ₹9,380 |
| 4.00 | Earth work excavation in all kinds of soil from the existing ground level in foundation trenches with initial lead and lifts & levelling, ramming as per requirement etc with disposal of the excavated materials at locations as directed, dewatering if required etc. with supply of all labour, materials, T&P, hire & running charges of all machineries, Port entry fees, all taxes etc all complete excluding GST and as per direction of Engineer in charge. | 3,045.5 | Each Cum | 100 ₹3,04,550 | 80 ₹2,43,640 | 40 ₹1,21,820 Lowest | 70 ₹2,13,185 | 90 ₹2,74,095 | 80 ₹2,43,640 |
| 5.00 | Dismantling of RCC works by Jack hammer and disposing the same with supply of all labour, engagement, hire & running charges of all equipments, T&P, all taxes, Port entry fees, providing safety arrangements for workmen, cleaning the site, all transportation etc all complete excluding GST and as directed by the Engineer in charge. | 15 | Each Cum | 500 ₹7,500 Lowest | 550 ₹8,250 | 600 ₹9,000 | 850 ₹12,750 | 800 ₹12,000 | 700 ₹10,500 |
| 6.00 | Cement concrete of M-20 grade (using Crusher broken hard granite chips of 12 mm to 20 mm size of approved quality for R.C.C work), mixing in a Batching Plant, transporting the concrete by any approved means excluding form works, hoisting, laying in slabs/retaining wall/shearkey/drain/other works, consolidating by mechanical vibrator, finished smooth to the exposed surface where necessary, curing by ponding/Hessian clothes etc. with supply of all materials, labour, T&P, all taxes, Port entry fees, royalties, tollage, all transportation charges, all testing, cost for design mix, engagement, hire & running charges of all machineries (But excluding cost of binding wire, cost of Steel & labour charges for bending & binding of steel) etc. all complete excluding GST and as directed by Engineer in charge. | 639 | Each Cum | 5,600 ₹35,78,400 | 4,800 ₹30,67,200 | 4,000 ₹25,56,000 | 4,000 ₹25,56,000 | 3,950.5 ₹25,24,369.5 Lowest | 4,800 ₹30,67,200 |
| 7.00 | Cement concrete of M-30 grade (using Crusher broken hard granite chips of 12 mm to 20 mm size of approved quality for RCC work) mixing in a Batching Plant, transporting the concrete by any approved means excluding form works, hoisting, laying in slabs in panels of required size, applying Coaltar on the Concrete surface throughout its depth, providing thermocol at panel joints so as to create a gap of 12mm between panels, consolidating by mechanical vibrator, finished smooth to the exposed surface to proper grade and camber, texturing the top surface by brooming with wire brush, curing by ponding/Hessian clothes, barricading the area etc with supply of all materials, labour, taxes, T&P, Port entry fees, royalties, tollage, transportation charges, engagement hire & running charges of all machineries, all testing, cost for design mix, sealing the top 50mm of the panel joints with bitumastic filler (But excluding cost of binding wire, cost of Steel & labour charges for bending & binding of steel) etc. all complete excluding GST and as directed by Engineer in charge. | 1,070 | Each Cum | 7,000 ₹74,90,000 | 5,050 ₹54,03,500 | 5,010 ₹53,60,700 | 4,600 ₹49,22,000 Lowest | 5,200 ₹55,64,000 | 5,200 ₹55,64,000 |
| 8.00 | Supplying, mixing, transporting, laying in proper level & grade Cement Concrete 1:3:6 (1 Cement : 3 Coarse Sand : 6 hard granite graded chips of 25mm & below size Crusher Broken) for Dry Lean Cement Concrete including form works made of ply/steel shutters, hoisting, laying in layers, laying over compacted Gr.II surface compacting with smooth wheeled Vibratory Road Roller of minimum 8 to 10 Ton capacity Static weight, finished smooth to the exposed surface, to proper level & gradient, curing etc with supply of all materials, labour, T&P, all taxes, royalties, engagement hire & running charges of all machineries, transportation charges, Port entry fees etc all complete excluding GST and as directed by the Engineer in charge. | 391 | Each Cum | 5,200 ₹20,33,200 | 3,450 ₹13,48,950 | 3,900 ₹15,24,900 | 3,700 ₹14,46,700 | 3,300 ₹12,90,300 Lowest | 3,600 ₹14,07,600 |
Tender Value
Refer Docs
EMD Value
₹3.2 L
Closing Date
29 Jul 2020, 5:15 pmClosed
G D Sethy,EE,HWD-1,PPT
G D Sethy,EE,HWD-1,PPT
Upgradation to existing Road from Fire Station to North Oil Jetty inside Port area.
2020_MoS_569611_1
CE/HWDI/ACCTS-56/19/341
Open Tender
Civil Works
Works
180 days
Paradip
Refer Tender Document and e-TCN
3 documents required · 3 mandatory
₹3,000
Yes
As per Tender Document and e-TCN
₹3.2 L
Yes
21 Sept 2020
7 Jul 2020
31 Jul 2020
7 Jul 2020
29 Jul 2020
7 Jul 2020
Amount
Engagement of Payloader/Dozer for clearing the area or for any other purpose including Port entry fees, hire & running charges, fuel, lubricants, T&P, all taxes, operation expenses etc. all complete excluding GST and as per direction of Engineer in charge. NB: No idle hours shall be paid. For levelling of Road side over burden debrises/ heavy structrals/concrete Blocks etc.
Supply of all labour, T&P for shifting of existing cable line, backfilling, levelling and other alied works including Port entry fees, etc. all complete excluding GST and as directed by the Engineer-in-charge.
Skilled Labourers.
Semi-skilled Labourers.
Furrow cutting to 50mm depth in the existing Bituminous road cleaning the surface with cost of all labour, T&P, all taxes, Port entry fees, transportation, hire and running charges of all machineries and vehicles, etc complete as directed by the Engineer in charge. North oil jetty area to pump house.
Earth work excavation in all kinds of soil from the existing ground level in foundation trenches with initial lead and lifts & levelling, ramming as per requirement etc with disposal of the excavated materials at locations as directed, dewatering if required etc. with supply of all labour, materials, T&P, hire & running charges of all machineries, Port entry fees, all taxes etc all complete excluding GST and as per direction of Engineer in charge.
Dismantling of RCC works by Jack hammer and disposing the same with supply of all labour, engagement, hire & running charges of all equipments, T&P, all taxes, Port entry fees, providing safety arrangements for workmen, cleaning the site, all transportation etc all complete excluding GST and as directed by the Engineer in charge.
Cement concrete of M-20 grade (using Crusher broken hard granite chips of 12 mm to 20 mm size of approved quality for R.C.C work), mixing in a Batching Plant, transporting the concrete by any approved means excluding form works, hoisting, laying in slabs/retaining wall/shearkey/drain/other works, consolidating by mechanical vibrator, finished smooth to the exposed surface where necessary, curing by ponding/Hessian clothes etc. with supply of all materials, labour, T&P, all taxes, Port entry fees, royalties, tollage, all transportation charges, all testing, cost for design mix, engagement, hire & running charges of all machineries (But excluding cost of binding wire, cost of Steel & labour charges for bending & binding of steel) etc. all complete excluding GST and as directed by Engineer in charge.
Cement concrete of M-30 grade (using Crusher broken hard granite chips of 12 mm to 20 mm size of approved quality for RCC work) mixing in a Batching Plant, transporting the concrete by any approved means excluding form works, hoisting, laying in slabs in panels of required size, applying Coaltar on the Concrete surface throughout its depth, providing thermocol at panel joints so as to create a gap of 12mm between panels, consolidating by mechanical vibrator, finished smooth to the exposed surface to proper grade and camber, texturing the top surface by brooming with wire brush, curing by ponding/Hessian clothes, barricading the area etc with supply of all materials, labour, taxes, T&P, Port entry fees, royalties, tollage, transportation charges, engagement hire & running charges of all machineries, all testing, cost for design mix, sealing the top 50mm of the panel joints with bitumastic filler (But excluding cost of binding wire, cost of Steel & labour charges for bending & binding of steel) etc. all complete excluding GST and as directed by Engineer in charge.
Supplying, mixing, transporting, laying in proper level & grade Cement Concrete 1:3:6 (1 Cement : 3 Coarse Sand : 6 hard granite graded chips of 25mm & below size Crusher Broken) for Dry Lean Cement Concrete including form works made of ply/steel shutters, hoisting, laying in layers, laying over compacted Gr.II surface compacting with smooth wheeled Vibratory Road Roller of minimum 8 to 10 Ton capacity Static weight, finished smooth to the exposed surface, to proper level & gradient, curing etc with supply of all materials, labour, T&P, all taxes, royalties, engagement hire & running charges of all machineries, transportation charges, Port entry fees etc all complete excluding GST and as directed by the Engineer in charge.
Supplying, mixing, transporting, laying in proper level & grade Cement Concrete 1:3:6 (1 Cement : 3 Coarse Sand : 6 hard granite graded chips of 20mm & below size Crusher Broken) for PCC including form works made of ply/steel shutters, hoisting, laying over compacted surface, finished smooth to the exposed surface, to proper level & gradient, barricading the work site curing etc with supply of all materials, labour, T&P, all taxes, hire & running charges of all machineries, transportation charges, Port entry fees etc all complete excluding GST and as directed by the Engineer in charge.
Supplying & forming 12mm wide x 85mm deep longitudinal joints by fixing 10mm dia 450mm long HYSD Bars @ 420mm C/C painted 50mm at center with anticorrosive paint including providing & fixing bitumen paper, painting one side of concrete surface (250mm thick) with bituminous black paint, cutting grooves of required size and sealing the grooves with bitumastic filler etc complete with supply of all materials, T&P, labour, hire & running charges of all machineries, all taxes, royalties, Port entry fees etc. all complete excluding GST and as directed by the Engineer-in-charge.
Supplying & forming 25mm wide x 300mm deep expansion joints by fixing 32mm dia. & 450mm long M.S round bars at 300mm center to center including painting 275mm length of bars with anticorrosive paints & covering the same with 1.25mm thick tough & durable plastic sheathing, providing closely fitted HDPE/ G.I Cap of 100mm long at the other end including fixing 25mm thick & 220mm deep Joint filler Board (Shalitex or equivalent) painting one side of concrete surface with bitumastic black paint & sealing the groove with bitumastic filter etc. all complete with supply of all labour, material, T&P, hire & running charges of all machinery, taxes, Port entry fees etc. complete excluding GST as directed by the Engineer-in-charge.
Supplying and forming 12mm wide x 60mm deep contraction joints by fixing 32mm dia 450mm long Mild Steel round bars @ 300C/C including painting two third of the bars with anticorrosive paint & covering the same with 1.25mm thick tough & durable plastic seathing, providing & fixing bitumen paper, painting one side of concrete surface with bitumastic black paint and sealing the grooves with bitumastic filler including cost of all materials, T&P, labour, all taxes, royalties, Port entry fees etc complete excluding GST and as directed by the Engineer-in-charge.
Filling with saline sand up to required including collecting, conveying by private trucks / dumpers with all lead and lifts, loading and unloading spreading and laying, watering, compacting by using VRR, dressing, leveling to required height, level and slope etc. with supply of all labour, materials, T&P, taxes, royalties, running & hire charges of VRR, trucks, dumpers, Port entry fees etc. complete excluding GST and as per direction of Engineer in charge. N.B:- 10% voids shall be deducted from the measured quantity of sand after compaction to arrive at the payable quantity.
Collecting, Conveying, Supplying and transportation of Quarry Dust of approved quality, conveying the same by private Trucks including loading, unloading, spreading quarry dust over the approved surface in suitable layers, compacting all complete including cost of all materials, labour, T&P, royalties, Taxes, hire & running charges of all equipments, Port entry fees, operator expenses cost of water, fuel, lubricants etc all complete excluding GST and as directed by the Engineer in charge.
Collecting, Conveying, Supplying & Spreading, IRC Grade-I metal of approved quality over the prepared sub-base in suitable layers, filling the interstices with required graine stone quarry dust as per specification, maintaining required slope and level, compacting by smooth wheeled Vibromax Road Roller of minimum 8 to 10 Ton Static Weight for both Dry and Wet rolling to the satisfaction of Engineer including supply of all materials, labour, T&P, transportation charges, engagement, hire and running charges of all equipments, water sprinkling, royalties, Taxes, Port entry fees etc all complete excluding GST and as directed by the Engineer in Charge.
Collecting, Conveying, Supplying & Spreading of IRC Grade-III metal of approved quality & filling the interstices with required Quarry Dust as per specification, laying over the compacted Gr-I surface to required slope, compacting by earth/plate vibrator including supply of all materials, labour, T&P, transportation charges, hire & running charges of all equipments, water sprinkling, royalties, Taxes, Port entry fees etc. all complete excluding GST and as directed by the Engineer in charge.
Supplying and laying 125 Micron polythene separation membrane with Overlapping of 300mm at joints including cleaning the surface before placing the membrane etc. complete including cost of all materials, labour, all taxes, cost of over lapping, Port entry fees etc. all complete excluding GST and as directed by the Engineer-in-charge.
Supply of Fe-500 steel confirming to I.S. Specifications including cutting, straightening, bending, binding & placing the grills in position for RCC works including cost of binding wire of 18 to 20 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, Port entry fees etc. all complete excluding GST and as directed by the Engineer in charge. N.B: Payment shall be made as per the co-efficient laid down in IS-1786. No wastages shall be paid.
Providing Rigid and smooth leak proof centring and shuttering for RCC works in slabs including dismantling them after setting with cost of all material, labour, T&P, taxes, tollage, gate entry fees etc all complete excluding GST and as per direction of Engineer in charge. * Foundation and Plinth
Design, development, supplying and fixing of single sided Signboards of size 0.75m x 0.50m made of Micro Prismatic Retro Reflective sheeting DG-3 pasted on 3 mm thick aluminum composite material as per IRC 67-2010, fixing each board with 8 Nos. of SS Mechanical Anchor Bolt of 8mm dia and 100mm long, the front side covered with Retro Reflective sheeting DG-3 with all letters, numerals and pictographs with border as per approved colour scheme including all taxes, transportation, tollage, hire & running charges of all equipments, Port entry fees, taking all safety precautions while installation etc. all complete excluding GST and as per direction of Engineer in charge.
Supplying, transporting, fabrication of 150mm dia GI pipe of C-Class (Heavy Duty) of Zindal make or equivalant quality including fabricating, finishing, errection charges, making structurals of required shape and fixing in position with proper alignment, level with supply of all materials, labour, T&P, cutting, welding, bending charges, hire and running charges of all machineries, transportation charges, Port entry fees, safety arrangements, all taxes etc. complete excluding GST and as per direction of Engineer in charge.
M/S BHAIRAB CHARAN SWAIN
SUBRAT KUMAR BEHURA
M/S Kailash Chandra Samal
NNS CONSTRUCTIONS AND ENGINEERING PRIVATE LIMITED
Aakar Infra Engineers PVT Ltd
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .