Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹8.5 L
EMD Value
₹10,600
Closing Date
5 Mar 2024, 9:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Public Works Department
Shwetha
Construction and Renovation of Sri Mutturayaswamy (Sri Lakshmi Venkateshwara) Temple at Narasikuppe village, Kasaba Hobli, Arakalgud taluk, Hassan district.
PWD/2023-24/BD/WORK_INDENT9446
PWD/2023-24/BD/WORK_INDENT9446
Open
Buildings
Electronic Documents, First(One Cover)
PWD Division Office Hassan
5 documents required · 5 mandatory
₹500
₹10,600
26 Feb 2024
26 Feb 2024
4 Mar 2024
Construction and Renovation of Sri Mutturayaswamy (Sri Lakshmi Venkateshwara) Temple at Narasikuppe village, Kasaba Hobli, Arakalgud taluk, Hassan district.
Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and te...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
5.2 Providing Coursed rubble masonry (first sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- With all lead and lift including cost and conveyance o...
2.2 Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with ...
1.9 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer ...
6.6 Providing Brick work with common burnt clay machine moulded perforated bricks of class designation 5.0 conforming to IS: 2222 in superstructure above plinth level in cement mortar 1:6 (1 cement : ...
2.5 Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite...
2.11 Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, lapi...
12.12 Providing Mathi/Nandi wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement conc...
12.15 Providing and fixing in position fully panelled Honne wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per dra...
12.46 Providing and fixing in position fully glazed for windows shutters with Honne wood stiles and rails of 30mm. thick, 75mm wide in single shutters with 4mm thick plain glass fixed with wooden bead...
10.19 Providing and fixing 20mm thick gang saw water cut Lakared granite for cladding in CM 1:3 (1 cement : 3 coarse sand) proportion with a coat of rough plastering using CM 1:4 (1 cement : 4 fine sa...
Additionalities for formwork,centrening,scaffolding charges shall be added on percentage to the finished concrete [112/14, Vol-1 at 60% of finished rate of concrete in m3) ---- With all lead and lift ...
Additionalities for formwork,centrening,scaffolding charges shall be added on percentage to the finished concrete [112/19, Vol-1 at 45% of finished rate of concrete in m3) ---- With all lead and lift ...
Additionalities for formwork,centrening,scaffolding charges shall be added on percentage to the finished concrete [ 111/1-A, Vol-1 at 8% of finished rate of concrete in m3) ---- With all lead and lift...
Additionalities for formwork,centrening,scaffolding charges shall be added on percentage to the finished concrete [ 111/1-B, Vol-1 at 3% of finished rate of concrete in m3) ---- With all lead and lift...
Additionalities for formwork,centrening,scaffolding charges shall be added on percentage to the finished concrete [ 111/9, Vol-1 at 70% of finished rate of concrete in m3) ---- With all lead and lift ...
Additionalities for formwork,centrening,scaffolding charges shall be added on percentage to the finished concrete [ 111/15, Vol-1 at 50% of finished rate of concrete in m3) ---- With all lead and lift...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
KW-1.doc
Tender Document • 1.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .