Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.7 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹20.8 L+₹2.1 L (11.4%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹25.1 L+₹6.4 L (34.3%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
24 Oct 2023, 5:00 pmClosed
Superintending Engineer
edc, ayodhya
Construction of line, Increasing Capacity of Transformers, Installation of Addation Transformer and Under ground Cable Laying at Different Places Under Electricity Distribution Division-IIIrd, Milkipu Ayodhya
2023_MVVNL_849249_2
99 H(F)(W)/2023-24
Open Tender
Electrical Works
Item Wise
90 days
Ayodhya
as per tender
2 documents required · 2 mandatory
₹3,540
Superintending Engineer, EDC
₹25,000
31 Oct 2023
18 Oct 2023
25 Oct 2023
18 Oct 2023
24 Oct 2023
18 Oct 2023
Amount
Part - A ( Material) Following Material Supplied by the Contractor:-
F Clamp
X arm Holding Clamp
L T Clamp
LT Clamp for PCC Pole
LT Shackle Insulator
D Box Clamp
Fuse Set unit Clamp
Aluminum Lug 63 KVA T/F
Aluminum Lug 100 KVA T/F
Aluminum Lug 250 KVA T/F
Holding Clamp Top & Dropper Channel
G.I. Pipe 6'' dia
Nut & Bolt
Carriage including loading,unloading & Proper stacking of following Stock materials from store/departmental store to Dump site distance 0 to 20 Kms. (distance approx)
PCC Pole 8.5 Mtr. Long
11 KV XLPE Cable 3x185 sqmm
11 KV Cable Jointing Kit outdoor 3x185 sqmm
LT PVC Cable 1x240 sqmm
LT PVC Cable 1x400 sqmm
LT PVC Cable 1x630 sqmm
AB Cable 3x50
AB Cable 3x95
AB Cable 3x120
ACSR Weasel Conductor
Transformer 25 KVA
Transformer 63 KVA
Transformer 100 KVA
Transformer 250 KVA
Transformer 400 KVA
Distribution Box Three Phase
Other matching Materials
Dragging of PCC/ST Pole from dump site to pit site
Fabrication and Errection of Double Pole Support on PCC 8.5 Mtr. including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Fabrication and Errection of Single Pole Support on PCC 8.5 Mtr. including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Stringing, Sagging, Binding and jumpering of ACSR Weasel Conductor as per RESSPO Norms
Stringing, Sagging, Binding and jumpering of AB Cable 3x50/3x95/3x120 sqmm as per RESSPO Norms
Grouting and Binding of Stay with in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per RESSPO Norms
Earthing of Poles as per RESPO Norms
Mounting of 25 KVA Transformer as per RESSPO Norms.
Mounting of 63 KVA Transformer as per RESSPO Norms.
Mounting of 100 KVA Transformer as per RESSPO Norms.
Mounting of 250 KVA Transformer as per RESSPO Norms.
Mounting of 400 KVA Transformer as per RESSPO Norms.
Erection & Commissioning of of 3 Phase/Single Phase Distribution Box with help of clamps (Cost of clamp & Bolt & Nuts shall be borne by contactor ) as per Norms.
Laying of underground 11 KV 3x70/120/185 sq mm D/C XLPE Cable in Normal Soil by digging of trench 1050 mm deep, 750 mm wide including supply of required material as fine sand, Ist class bricks as per norms. (All the material will be supplied by the contractor except 11 KV XLPE cable)
Hanaging, Hosting & clamping of G.I. Pipe, channel, nut & Bolt 3x70/3x120/3185 mm2 XLPE 11 KV cable as per RESSPO Norms (cost of all accessories will be borne by contractor)
Installation of Heat Shrinkable Type cable jointing kits Outdoor end Termination suitable for 11 KV XLPE cable 3x70/120/185 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.)
Construction of Transformer Plinth including excavation of foundation, base concreting of 1:6:12 (Cement mortar of Ratio 1:4 foundation, CC in 1:4:8 ratio (Cement fine sand and brick ballast ) and RCC work with ratio 1:2:4 Cement, Coarse sand and Stone Grit of 20 mm gause as per RESSPO norms
FRP Fencing of Transformer Plinth with the help of wire mesh/Barbed wire after grouting proper size of angle as per RESSPO Norms. Inclusive of all material such as Wiremesh/Barbed Wire, Angle Flats, Nut Bolts etc.
Earthing by way of boring and lowering of "B" class G.I. pipe 50 mm dia 20 mtr. Long from ground upto the water lavel it will be connected to the G.S. Strip for T/F nutral connection the earth strip will be welded to the G.I. pipe the work also included top cap and clamps for pouring water the cost of all material will all labour and T n P etc. complete in all respect . (all the material will be supplied by the contractor.)
Connection of L.T. XLPE Cable Different Size
Rect. Back old and used 16 KVA T/F Site to Store Center
Rect. Back old and used 25 KVA T/F Site to Store Center
Rect. Back old and used 100 KVA T/F Site to Store Center
Old and used Control Pannel Site to Store Center
M/S SATYAM TRADING COMPANY
Hindustan Electric Work
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .