| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹8.5 L (7.10%)Admitted-Finance | ₹1.3 Cr+₹8.5 L (7.10%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Original EMD and Affidavit are not Submitted |
| 4 | Rejected-Technical 6 18 KADAIYATHUPATTI CHIDAMBARAVIDUTHI POST ARANTHANGI PUDUKKOTTAI DISTRICT 614 622 | PUDUKKOTTAI | TAMIL NADU | 614622 | - | - | Rejected-Technical Original EMD and Affidavit are not Submitted |
| 5 | Rejected-Technical 251 A KARAKATHIKOTTAI MANAMELKUDI TALUK PUDUKKOTTAI 614 619 | PUDUKKOTTAI | TAMIL NADU | 614619 | - | - | Rejected-Technical Original EMD and Affidavit are not Submitted |
| Sl No | Description | Qty | Unit | PALANISAMY UDAYAR PALANIAMMAL L2 | MDR CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00R-278 Strengthening of the road to Kookanur sivan koil road KM 0/0-0/670 | |||||
| 2.00 | Clearing the light jungle uproofing including all cutting charges and clearing etc., complete | 472.68 | Sqm | 6 ₹2,836.08 | 5.1 ₹2,410.67 Lowest |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 361.8 | Cum | 150 ₹54,270 | 148.1 ₹53,582.58 Lowest |
| 4.00 | Picking the Existing BT Surface upto 10cm Thick including all labour charges etc complete | 656.5 | Sqm | 20 ₹13,130 | 18.8 ₹12,342.2 Lowest |
| 5.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 6.00 | KM 0/0- 0/670 | 306.22 | Cum | 2,250 ₹6,88,995 | 2,223.5 ₹6,80,880.17 Lowest |
| 7.00Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | |||||
| 8.00 | KM 0/0- 0/670 | 2,046 | Sqm | 76 ₹1,55,496 | 74.7 ₹1,52,836.2 Lowest |
| 9.00Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | |||||
| 10.00 | KM 0/0- 0/670 | 2,055 | Sqm | 20 ₹41,100 | 17.4 ₹35,757 Lowest |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
23 May 2023, 3:00 pmClosed
JOINT DIRECTOR/PROJECT DIRECTOR
DRDA, PUDUKKOTTAI
MGSMT-22-23- Pack - 10 -Strengthening and Five years Maintenace of three Roads in Aranthagni Block-Pudukkottai District
2023_RDTN_303954_1
Atgi-10/MGSMT-22-23/PDK
Open Tender
Civil Works
Item Rate
180 days
PUDUKKOTTAI
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.2 L
14 Jun 2023
19 Apr 2023
23 May 2023
19 Apr 2023
23 May 2023
19 Apr 2023
Amount
R-278 Strengthening of the road to Kookanur sivan koil road KM 0/0-0/670
Clearing the light jungle uproofing including all cutting charges and clearing etc., complete
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Picking the Existing BT Surface upto 10cm Thick including all labour charges etc complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and laying gravel for side berms including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. complete
Provision for Name Board cum Citizen Board
Provision and fixing ofcautionary, mandatory signboard
Providing and fixing of cautionary, mandatory and informatory sign board Providing and fixing of Retro Reflectorised Cautionary, Mandatory Signs with Definition Plate made out of High Intensity Grade Prismatic Sheeting conforming to IRC-67:2010 & ASTM D 4956-09,Type IV Specification and Fixed over 1.5 mm thick Aluminium Sheet
Provision for Equalatereal Triangle sign board
Provision and fixing of 60 CM circle cautionary, mandatory signboard
Provision and fixing Reflectorwith lense reflector ofcautionary, mandatory signboard
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
(ii) 200 m stone (precast)
(iii) Guard Stone(precast)
Construction of Retaining wall at Ch 330 to 350m and 450 to 460m
Earth work excavation in all classes of soil such as hard stiff clay hard red earth, earth murrams gravel stoney erath, earth mixed with fair size boulders as per SS 20B for foundation.etc., complete
Filling withM.sand including cost and conveyance of all materials to work site and all labour charges etc.,complete
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance to work site including all labour charges for filling etc complete
Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance to work site including all labour charges for filling etc complete
Backfilling behind retaining wall including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Construction of Pipe culvert at Ch 5m
Earth work excavation in all classes of soil such as hard stiff clay hard red earth, earth murrams gravel stoney erath, earth mixed with fair size boulders as per SS 20B for foundation.etc., complete
Filling withM.sand including cost and conveyance of all materials to work site and all labour charges etc.,complete
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance to work site including all labour charges for filling etc complete
Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance to work site including all labour charges for filling etc complete
Cost and supply of 900mm R.C.C. pipes with collar including etc complete
Collection and supply of gravel for filling from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Construction of Pipe culvert at Ch 400m
Earth work excavation in all classes of soil such as hard stiff clay hard red earth, earth murrams gravel stoney erath, earth mixed with fair size boulders as per SS 20B for foundation.etc., complete
Filling withM.sand including cost and conveyance of all materials to work site and all labour charges etc.,complete
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance to work site including all labour charges for filling etc complete
Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance to work site including all labour charges for filling etc complete
Cost and supply of 900mm R.C.C. pipes with collar including etc complete
Collection and supply of gravel for filling from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Construction of Pipe culvert at Ch 665
Earth work excavation in all classes of soil such as hard stiff clay hard red earth, earth murrams gravel stoney erath, earth mixed with fair size boulders as per SS 20B for foundation.etc., complete
Filling withM.sand including cost and conveyance of all materials to work site and all labour charges etc.,complete
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance to work site including all labour charges for filling etc complete
Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance to work site including all labour charges for filling etc complete
Cost and supply of 900mm R.C.C. pipes with collar including etc complete
Collection and supply of gravel for filling from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
R-71 Strengthening of the road from Aranthangi-Kattumavadi road to Edaiyankadu- Sevidangadu road KM 0/0-1/0
Clearing the light jungle uproofing including all cutting charges and clearing etc., complete
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Picking the Existing BT Surface upto 10cm Thick including all labour charges etc complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and laying gravel for side berms including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. complete
Provision for Name Board cum Citizen Board
Provision and fixing ofcautionary, mandatory signboard
Providing and fixing of cautionary, mandatory and informatory sign board Providing and fixing of Retro Reflectorised Cautionary, Mandatory Signs with Definition Plate made out of High Intensity Grade Prismatic Sheeting conforming to IRC-67:2010 & ASTM D 4956-09,Type IV Specification and Fixed over 1.5 mm thick Aluminium Sheet
Provision for Equalatereal Triangle sign board
Provision and fixing of 60 CM circle cautionary, mandatory signboard
Provision and fixing Reflectorwith lense reflector ofcautionary, mandatory signboard
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
(i) Ordinary Kilometer Stone (Precast)
(ii) 200 m stone (precast)
(iii) Guard Stone(precast)
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
R-155 Strengthening of the road from Thanjavur- sayalkudi road to Pachalur road KM 0/0-1/040
Clearing the light jungle uproofing including all cutting charges and clearing etc., complete
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Picking the Existing BT Surface upto 10cm Thick including all labour charges etc complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and laying gravel for side berms including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. complete
Provision for Name Board cum Citizen Board
Provision and fixing ofcautionary, mandatory signboard
Providing and fixing of cautionary, mandatory and informatory sign board Providing and fixing of Retro Reflectorised Cautionary, Mandatory Signs with Definition Plate made out of High Intensity Grade Prismatic Sheeting conforming to IRC-67:2010 & ASTM D 4956-09,Type IV Specification and Fixed over 1.5 mm thick Aluminium Sheet
Provision for Equalatereal Triangle sign board
Provision and fixing of 60 CM circle cautionary, mandatory signboard
Provision and fixing Reflectorwith lense reflector ofcautionary, mandatory signboard
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
(i) Ordinary Kilometer Stone (Precast)
(ii) 200 m stone (precast)
Construction of 3 M span RCC slab culvert at Ch 685m
Earth work excavation in all classes of soil such as hard stiff clay hard red earth, earth murrams gravel stoney erath, earth mixed with fair size boulders as per SS 20B for foundation.etc., complete
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance to work site including all labour charges for filling etc complete
Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete
BELOW SILL
ABOVE SILL
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance to work site including all labour charges for filling etc complete
Cost and supply of steel binding wire including etc complete
RCC Concrete 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance to work site including all labour charges for filling etc complete
Construction of Pipe culvert at Ch 790
Earth work excavation in all classes of soil such as hard stiff clay hard red earth, earth murrams gravel stoney erath, earth mixed with fair size boulders as per SS 20B for foundation.etc., complete
Filling withM.sand including cost and conveyance of all materials to work site and all labour charges etc.,complete
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance to work site including all labour charges for filling etc complete
Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance to work site including all labour charges for filling etc complete
Cost and supply of 900mm R.C.C. pipes with collar including etc complete
Collection and supply of gravel for filling from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
PALANISAMY UDAYAR PALANIAMMAL
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_360484.xls
BOQ • 0.38 MB
10_Tech.pdf
Tender Documents • 0.58 MB
10_Price.pdf
Tender Documents • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .