Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹3 L
Closing Date
1 Dec 2020, 12:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
PR & CC
This tender is for New Retail Outlet Project and modernization of existing outlet under Durgapur RRO.
20000645-HD-10157
20000645-HD-10157
Open Tender
Two Bid
Shimla, Himachal Pradesh
₹0
₹3 L
1 Dec 2020
10 Nov 2020
1 Dec 2020
1 Dec 2020
11 Nov 2020 - 24 Nov 2020
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | SITE CLEARANCE | SITE CLEARANCE — Surface dressing of the ground including removing small plants, bushes ,vegetation (dia less than 4") and making surface levelled and disposal of rubbish outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge. | - | Square Meters |
| 2 | EXCAVATION IN EARTH UPTO | EXCAVATION IN EARTH UPTO — Excavation for foundation upto required depth below existing ground level up to 1.5m in any tyoe odf soil except hard rock. Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, trenches/plinth beam etccompacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete. The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths. | - | Cubic Meters |
| 3 | EXCAVATION - 1.5 TO 3 M | EXCAVATION - 1.5 TO 3 M — Excavation for foundation upto required depth below ground level in any type of soil except hard rock . Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, foundation, trenches/plinth beam etc compacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete . The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths.EXCAVATION IN EARTH BETWEEN 1.5 TO 3 M | - | Cubic Meters |
| 4 | EXCAVATION - 3 TO 4.5 | EXCAVATION - 3 TO 4.5 — Excavation for foundation upto required depth below ground level in any type of soil except hard rock . Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, compacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete . The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths. EXCAVATION IN EARTH BETWEEN 3 TO 4.5 | - | Cubic Meters |
| 5 | EXCAVATION- HARD ROCK | EXCAVATION- HARD ROCK — Excavation for foundation upto required depth below existing ground level up to 1.5 m. depth in concrete road by chiselling / pneumatic drilling . Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the job to restore the original state of the ground and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including curing, watering and compaction and complete . The measurement of the excavation would be based on actual depth of excavation. | - | Cubic Meters |
| 6 | EXCAVA-HARDROCK 1.5- 3.0 | EXCAVA-HARDROCK 1.5- 3.0 — Excavation for foundation upto required in hard rock and excavation shall be done by chiselling / pneumatic drilling or Blasting. Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, trenches/plinth beam etc compacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete . The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths. EXCAVATION IN HARD ROCK 1.5 mts- 3.0 mts | - | Cubic Meters |
| 7 | EXCAVA-HARD ROCK 3.0- 4.5 | EXCAVA-HARD ROCK 3.0- 4.5 — Excavation for foundation upto required in hard rock and excavation shall be done by chiselling / pneumatic drilling or Blasting. Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, compacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete . The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths. EXCAVATION IN HARD ROCK BETWEEN 3 TO 4.5 | - | Cubic Meters |
| 8 | CRUSHEDSTONESAND | CRUSHEDSTONESAND — Supply and filling with Crush Sand as per IS 21116-1980-2 & IS 486:2000 & IS 383.1970 The particle shape is semi rounded or cubical & not flakey or elongated. Dust percentage is strictly controlled 10 - 15% with fineness modulus 2.6 to 3. Supply and filling with Stone Crushed sand of approved quality in layers of 150 mm each including spreading, compacting by hand ramming and watering etc, all complete as per direction of Engg.-In-Charge. compacted thickness only. | - | Cubic Meters |
| 9 | EARTH FILLING-LAYERS | EARTH FILLING-LAYERS — Supplying and filling imported earth of approved quality in layers not exceeding compacted thickness of 200mm incl. Watering ,ramming, compacting, and if required, rolling and re-rolling with power roller , mechanical compactors of 80KN- 100 KN capacity to achieve maximum compaction, all complete as per direction of Engg.-In- Charge. The earth should be free from weeds, grass and other objectionable debris. Black Cotton soil shouldn't be used. Measurement basis compacted thickness only. Rate shall include conducting compaction test as per tech spec. | - | Cubic Meters |
| 10 | MURRUM FILLING-LAYERS | MURRUM FILLING-LAYERS — Supplying and filling imported murrum of approved quality in layers not exceeding compacted thickness of 200 mm inclusive spreading, Watering ,ramming, compacting, and if required, rolling and re-rolling with power roller, mechanical compactor of 80 KN to 100 KN capacity to achieve maximum compaction, all complete as per direction of Engg.-In-Charge. The murrum should be excavated from a quarry / mines, free from weeds, grass and other objectionable debris. Measurement basis compacted thickness only. Rate shall include conducting compaction test as per tech spect. | - | Cubic Meters |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
20000645-HD-10157.pdf
TENDER_DOCUMENT • 33.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .