| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 LAdmitted-Finance | ₹9.4 L | L1 | Admitted-Finance |
| 2 | L2₹11.3 LAdmitted-Finance | ₹11.3 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | N R S COMPANY L2 | Rising Construction Co-Operative Society Ltd L1 |
|---|---|---|---|---|---|
| 1.00Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m | |||||
| 1.01 | All kinds of soil | 64.97 | cum | 400 ₹25,988 | 245 ₹15,917.65 |
| 2.00Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 2.01 | 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | 57.85 | cum | 10,000 ₹5.8 L | 8,150 ₹4.7 L |
| 3.00Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | |||||
| 3.01 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.42 | cum | 14,000 ₹19,880 | 9,900 ₹14,058 |
| 4.00Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level. | |||||
| 4.01 | Thermo-Mechanically Treated bars of grade Fe-500D or more. | 341.55 | Kg | 115 ₹39,278.25 | 84 ₹28,690.20 |
| 5.00Centering and shuttering including strutting, propping etc. and removal of form for: | |||||
| 5.01 | Foundations, footings, bases of columns, etc. for mass concrete | 289.18 | sqm | 250 ₹72,295 | 300 ₹86,754 |
Tender Value
₹12.5 L
EMD Value
₹25,075
Closing Date
30 Apr 2026, 3:00 pmClosed
Executive Engineer
Executive Engineer (PRI) South Andaman Division-I No. J/4, Old Councilor Bungalow, Junglighat, Sri Vijaya Puram, South Andaman
Construction of C.C Footpath from Village road of Chunna Bhatta (Near Hemawathi residence) to PKS Nagar village road via S.Indu, Baskar and Vasanth Raj residence at North Bay Ward No.01 under Gram Panchayat Hope Town.
2026_RDPRI_22783_1
EE/PRI/SAD-I/RR/2026-27/12
Open Tender
Civil Works - Others
120 days
Chunna Batta, Hope Town
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Executive Engineer, GPPS
₹25,075
5 May 2026
22 Apr 2026
30 Apr 2026
23 Apr 2026
30 Apr 2026
23 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m | |||||
| 1.01 | All kinds of soil | 1 | cum | - | - |
| 2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 2.01 | 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 3Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | |||||
| 3.01 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 4Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level. | |||||
| 4.01 | Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | Kg | - | - |
| 5Centering and shuttering including strutting, propping etc. and removal of form for: | |||||
| 5.01 | Foundations, footings, bases of columns, etc. for mass concrete | - | sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
Document.pdf
Tender Documents • 2.17 MB
BOQ_24137.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid