Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹61.4 LAccepted-AOC 1 14 SUJAL MANSION B BLOCK BHANGWADI KALBADEVI ROAD MUMBAI 400 002 | MUMBAI | MAHARASHTRA | 400002 | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹61.7 L+₹32,500 (0.53%)Rejected-Finance SWAGAT CO OP HSG SOCIETY LTD 22 303 CHAITANYA SHIVAJI RAJE COMPLEX MHADA COMPLEX OPP EKA NAGAR KANDIVALI W MUMBAI 400 067 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400067 | L2 | Rejected-Finance Other than being lowest | |
| 3 | L3₹85.0 L+₹23.6 L (38.4%)Rejected-Finance GARDEN AVENUE PLOT NO 242 243 244 RH 4 SECTOR 21 NERUL NAVI MUMBAI 400 706 | THANE | MAHARASHTRA | 400706 | L3 | Rejected-Finance Other than being lowest | |
| 4 | L4₹91.7 L+₹30.4 L (49.4%)Rejected-Finance 67 KAILASH VIHAR TIWARIPUR BAGIA JAJMAU KANPUR 208010 | KANPUR | KANPUR NAGAR | UTTAR PRADESH | 208010 | L4 | Rejected-Finance Other than being lowest | |
| 5 | L5₹1.0 Cr+₹39.1 L (63.7%)Rejected-Finance 702 A1 SHREE PRASAD TAWADEWADI SHREE DATTAGURU PARK KUMBHARWADA URAN DIST RAIGAD MAHARASHTRA 400 702 | URAN | RAIGAD | MAHARASHTRA | 400702 | L5 | Rejected-Finance Other than being lowest |
Tender Value
₹99 L
EMD Value
₹1.7 L
Closing Date
18 Sept 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE (NW) Mumbai
Commander Works Engineer NW Dr Homi Bhabha Road Navy Nagar Colaba Mumbai 05
REPAIR MAINTENANCE MANNING AND OPERATION OF EM INSTALLATION LHS TO LION GATE AT VARIOUS JETTIES AND ALLIED WORKS AT NAVAL DOCKYARD UNDER GE NW KUNJALI COLABA MUMBAI
2024_MES_662756_1
8360/CWE (NW) Mumbai/E8
Open Tender
Civil Works
Item Rate
330 days
GE (NW) Kunjali
As per tender documents
7 documents required · 7 mandatory
₹1,000
Yes
GE (NW) Kunjali
₹1.7 L
Yes
CWE (NW) Mumbai
17 Dec 2024
28 Jun 2024
20 Sept 2024
28 Jun 2024
18 Sept 2024
18 Jul 2024
28 Jun 2024 - 11 Jul 2024
11 Jul 2024
Amount
Manning and operation including attending breakdowns of HT/LT network at SS1, SS2 & SS3 sub stations 6.6 KV/433 volts with 6.6 KV incoming from MRSS/INSS sub station and consisting of various sub stations and frequency convertor, transformers, HT/LT braker, LT capacitor bank, battery chargers, LT panels, APFC panels, COPE points, distribution panels, including internal lighting/ventilention of the sub stations and manning duty round the clock by one electrician per shift in three shifts by skilled operator having minimum 3 years experince in electrical, mechanical and external electrification. carryout of maning duties by deploying the under mentioned manpower in three shifts incl Sunday/Holidays:- Electrician -15 Nos (Skilled) Notes :- (i) Electrician must have passed matriculation with minimum three years experience in the trade. (ii) Shift timings above are as under:- (a) First shift: 0600 hr to 1400 hr (b) Second shift: 1400 hr to 2200 hr (c) Third shift: 2200 hr to 0600 hr
Manning and operation including attending breakdowns of HT/LT network at SS1, SS2 & SS3 sub stations 6.6 KV/433 volts with 6.6 KV incoming from MRSS sub station and consisting of various sub stations and frequency convertor such , cruiser wharf sub station transformers, HT/LT braker, LT capacitor bank, battery chargers, LT panels, APFC panels, COPE points, distribution panels, including internal lighting/ventilention of the sub stations and manning duty round the clock in three shifts by skilled operator having minimum 3 years experince in electrical, mechanical and external electrification. carryout of maning duties by deploying the under mentioned manpower in three shifts incl Sunday/Holidays:- Mate electrician - 9 Nos (Semi-skilled) Notes :- (i) Mate electrician must have passed matriculation with minimum three years experience in the trade. (ii) Shift timings of above are as under:- (a) First shift: 0600 hr to 1400 hr-03 Nos (b) Second shift: 1400 hr to 2200 hr-03 Nos (c) Third shift: 2200 hr to 0600 hr-03 Nos
NOTE FOR ITEM NO.1.00 & 2.00: The duty for each shift at various substations located inside Naval Dockyard area as directed by Engineer -in-Charge.
Notes for BOQ item No 1.00 and 2.00 (cont...) (i) Passes will be processed after verification of certificate, Passes shall not be granted without submission of qualification proof & experience certificate for lift operator. In case of OEM, the qualification shall be verified by the Engineer-in-Charge before the issue of passes. (ii) Contractor shall submit ID proof, Residential proof, Bank A/C details to department and obtain approval of Engineer-in-Charge before employing a person as Operators. (iii) Payment to employees shall be done by crossed cheque through Aadhaar linked bank account only and it shall not be less than minimum fair wages as per act in vogue. The contractor shall submit proof to Engineer-in-Charge before claiming any payment. (iv) He/She shall report to JE E/M in-Charge. In case of emergency he/she will function according to their directions. If he is found absent or moved without intimating to engineer-in-Charge or JE E/M he will be treated as absent for the said shift and recovery to this effect for Rs 1500/- per shift shall be affected. (v) Payment as per quoted rate shall also be deducted in addition to the penalty as specified above. (vi) In case of malfunctioning if any noticed, electrician/mate shall intimate to the JE E/M. (vii) Contractor shall submit the labour licenece as applicable as per latest laws/acts & Copy of GST Regn registered number issued by concerned authority. (viii) Contractor has to submit proof of payment of EPF subscription made by him as applicable as per latest laws/acts alongwith RAR failing which RAR will not be progressed for payment.
(ix) The rates quoted by the contractor shall be deemed to be included provision of all latest labour laws / regulations including all relevant taxes as applicable. (x) The bidders are advised not to quote rate less than minimum fair wages as circulated by competent authority. If the quoted amount is less than the estimated cost given at at page no 14 of SCH A NOTES the lowest bidder will have to depost FDR/BGB as elaborated herein after in favour of Accepting Officer within 07 days of opening of financial bid (cover No 2). (xi) The deposited amount shall be the difference between estimated cost as given at page no 14 of SCH A NOTES and amount quoted by lowest bidder for respective item. FDR/BGB shall be released only after satisfactory completion of work. If the contractor fails to pay minimum wages to employees, the department shall have right to with hold the said amount which will be verified by GE. The decision of Accepting Officer regarding amount to be withheld shall be final and binding. The withheld amount will be utilised by GE for payment to employees if contractor fails to pay minimum wages and balance amount if any shall only be released. If the lowest bidder fails to deposit the amount as stated above within 07 days, the contractor shall be banned for 06 months & his bid shall be rejected. The contractor shall submit 03 Nos of BGNs/FDRs of equal amount as mentioned above. The BGBs/FDRs validity shall be for 04 months, 08 month & 12 months respectively for the purpose of encashment release as the case may be. (xii) The rates quoted shall be inclusive of suitable reliver whenever necessary as required and directed by the Engineer in charge.
Material and labour cable End Termination Box, HEAT shrinkable, Indoor type suitable for 6.6-11KV, 120 to 185 sq.mm XLPE, 3 core power cable with aluminium conductor including dismantling old cable end termination of any description compete all as specified and directed.
Supply & Fixing insulation rubber mat more than 3.3kV upto 11 kV , having thickness not less than 2.50mm at various installation including pasting of rubber mats with adhesive resin all as specified and directed by Engineer-in-Charge.
cooltech engineering services (BID ID -3072276)
M/s S.D Construction Co (BID ID -3093057)
Ashirwad Contractor and Supplier (BID ID -3098565)
Sagar Electricals (BID ID -3074908)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .