Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 CrAccepted-AOC 0 272 273 1 | ₹1.2 Cr | 1 | Accepted-AOC AOC |
| 2 | 2₹1.4 Cr+₹15.1 L (12.3%)Rejected-Finance | ₹1.4 Cr+₹15.1 L (12.3%) | 2 | Rejected-Finance Not Being Lowest |
| 3 | Rejected-Technical | - | - | Rejected-Technical Documents not Completed |
| 4 | Rejected-Technical | - | - | Rejected-Technical Documents not Completed |
| 5 | Rejected-Technical | - | - | Rejected-Technical Documents not Completed |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
15 Sept 2023, 2:00 pmClosed
Superintending Engineer ICC JHANSI
OFFICE OF THE Superintending Engineer Irrigation Construction Circle, Betwa Bhawan, Civil Line, JHANSI
CONSTRUCTION OF CEMENT CONCRETE LINING WITH TEMPERATURE REINFORCEMENT IN BABINA RIGHT CANAL FROM Km 0 TO 0.200 AND Km 0.560 TO 1.780 LOT 4
2023_UPIDC_828322_4
02/SE/2023-24
Open Tender
Civil Works
Item Wise
90 days
Babina District Jhansi
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹2.8 L
Yes
9 Feb 2024
11 Aug 2023
15 Sept 2023
11 Aug 2023
15 Sept 2023
11 Aug 2023
Amount
Campaction of earth work including watering by roller driven by tractor including all cost of labour & T&P etc. required for proper completion of work.
Earth work in Excavation for making canal section for canal linning in all type of strata with all lead & lift including all material, labour ,T&P etc. required for proper completion of work.
Preparation of Subgrade excluding cost of earth work including all material ,labour ,T&P etc.required for proper completion of work.
Providing & laying 200 micron LDPE film black polythene sheet below C.C. lining including cost of all material, labour , T&P etc. required for proper completion of work .
Providing & laying cement concrete 1:2:4 (M-15,A-20) with graded metal of maximum size 20 mm for canal lining including vibrating, mechanical mixing leveling with cost of all material, labour , T&P etc. required for proper completion of work, but excluding cost of Centering & shuttering & reinforcement .
Providing and fixing Centering & shuttering for concrete work including cost of all material, labour , T&P etc. required for proper completion of work. with it’s removal .
Providing and fixing Steel reinforcement for lining work including cost of all material, labour , T&P etc. required for proper completion of work.
Providing and filling 15 x 35 mm joints of C.C. Lining with bitumen sealing compound including cost of all material, labour , T&P etc. required for proper completion of work .
12.50 mm thick cement plaster 1:4 including all cost of labour and T& P etc required for proper completion of work..
M/S LALMANI MAURYA
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .