| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC | ₹8.4 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹8.6 L+₹18,528 (2.21%)Rejected-AOC | ₹8.6 L+₹18,528 (2.21%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | R.R. ENTERPRISES L1 | svasit Engineers L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the existing damaged Reinforced cement concrete works including all cost etc complete | 4.5 | m3 | 1,000 ₹4,500 Lowest | 5,100 ₹22,950 |
| 2.00 | Desilting the existing drain including all labour charges etc complete. | 50 | m3 | 113 ₹5,650 Lowest | 120 ₹6,000 |
| 3.00 | Dismantling & Removing the existing Damaged R.C.C .Covering Slabs over the existing drain including cost of removing the cement mortar pointing works including all cost etc complete | 22 | m2 | 400 ₹8,800 Lowest | 610 ₹13,420 |
| 4.00 | Dismantling the existing damaged Plain cement concrete works including all cost etc complete | 21 | m3 | 400 ₹8,400 Lowest | 600 ₹12,600 |
| 5.00 | Earth work excavation in all types of soil including all initial lead and lift etc complete (for Drain works) | 47 | m3 | 100 ₹4,700 Lowest | 250 ₹11,750 |
| 6.00 | Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification. | 20 | m3 | 6,750 ₹1,35,000 | 6,000 ₹1,20,000 Lowest |
| 7.00 | Centering with steel centering for revetment, drain and culvert upto 1.20m depth using MS sheet of size 0.90X0.60m 10 gauge thick and stiffened with MS 'L' angle & wood runners runners of size 0.075 X 0.05 three rows with 262.20 M2 support by casurina pullys 0.075 cm at 0.45 m length including cost of nails etc., Area. 10.80 sq.mtr (upto 4 Feet) | 230 | m2 | 740 ₹1,70,200 | 550 ₹1,26,500 Lowest |
| 8.00 | Providing Plain Cement Concrete 1:3:6 (one cement,three fine aggregates and six coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard 6504.60 m3 labour charges etc., complete as per standard specification | 45.5 | m3 | 7,750 ₹3,52,625 | 6,800 ₹3,09,400 Lowest |
| 9.00 | Plastering with cement mortar 1:3 (one cement two fine aggregates ), 20 mm ,thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications (S.I.306) | 54 | m2 | 650 ₹35,100 Lowest | 650 ₹35,100 Lowest |
| 10.00 | Supply and erecting centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC slabs, Rectangular beems, Tee (or) ECC Beam, Lintel, Bed Block, Staircase waist and landing slabs landing beams, canopy etc., in all floor with all cross bracings using mild steel sheets of size 90cm X 60cm and BG 10 stiffened with welded mild steel angles of size 25mm X 25 X 3mm for boarding laid over country wood joinsts of size 10cm X 6.50 cm spaced at about 90cm C/C and supports by Causrina props of 10cm to 13cm dia spaced at 75cm C/C etc., completed as directed. Sl.No.123 1018.60 M3 | 21.5 | m2 | 750 ₹16,125 Lowest | 1,200 ₹25,800 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
3 Dec 2025, 3:00 pmClosed
Assistant Commissioner West Zone
West Zone, Coimbatore Corporation
Reconstruction of Storm Water Drain at Pudiya Nesavalar Nagar and Paari Nagar in Ward no 35 of West Zone
2025_MAWS_624559_7
E6/West Zone/2025
Open Tender
Civil Works
Works
90 days
West Zone, Coimbatore Corporation.
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹10,000
11 Apr 2026
20 Nov 2025
4 Dec 2025
21 Nov 2025
3 Dec 2025
21 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.32 MB
Tender Documents
Tender Documents • 0.66 MB
Additional Documents
Additional Documents • 0.26 MB
BOQ
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .