Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.7 LAdmitted-Fee/PreQual/Technical/Finance AT NARANPARA PO CHANDOL PS KENDRAPARA SADAR DIST KENDRAPARA PIN 754208 | KENDRAPARA | ODISHA | 754208 | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹12.1 L+₹38,883.67 (3.32%)Admitted-Fee/PreQual/Technical/Finance AT KULANAPUR PO P S SALIPUR DISTRICT CUTTACK PIN 754202 | CUTTACK | CUTTACK | ODISHA | 754202 | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹12.6 L+₹84,121.86 (7.18%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹15.1 L+₹3.4 L (29.1%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L4₹15.1 L+₹3.4 L (29.1%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹15.1 L
EMD Value
₹15,130
Closing Date
7 Jul 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, CUTTACK
Maliachhak - Kulaasukarpada Road __SDBC0.047 to 0.512 0.843 to 1.500
2026_CERWI_133895_1
RWD Ctc 05 / 2026-27
Open Tender
Civil Works - Roads
Percentage
30 days
Cuttack
2 documents required · 2 mandatory
₹6,000
₹15,130
Yes
10 Jul 2026
30 Jun 2026
8 Jul 2026
30 Jun 2026
7 Jul 2026
30 Jun 2026
30 Jun 2026 - 6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 of MORD specification for Rural roads and as per the direction of the Engineer-in-Charge. | 3,000 | sqm | 8.63 | ₹25,890 |
| 2 | Labour for scarping cleaning the road surface applying tack coat using 3.00 kg of bitumen for 10 Sqm and laying 37.5 mm thick built-up spray grouting in one layer using 0.45 cum of 25 mm to 40 mm size hard granite metal and 12.00 kg of 80/100 grade bitumen for 10 Sqm with 0.12 cum of 12mm size h.g.c.b. chips as key stone for 10 sqm spreading over and laying including heating , pouring and spreading over and spreading bitumen, metal , chips and rolling with P.R.R including hire & running charges of P.R.R and all other machinaries with all cost, conveyance, royality, taxes of materials, labour with T&P required for the work etc. complete as per specification and direction of Engineer-in-charge. | 82.66 | sqm | 425.33 | ₹35,157.78 |
| 3 | Providing and laying spreading and compacting graded stone aggregates to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base / base course on old prepared surface and compacting with vibratory roller to achive the desire density as per Clause 406 of MoSRT&H specifications for road & bridges work as per the direction of the E.I.C. | 49.67 | sqm | 2,998.57 | ₹1,48,938.97 |
| 4 | Providing and applying tack coat using bitumen of 60/70 grade @ 0.3kg per sqm on the prepared bituminous surface cleaning with hydraulic brooms including cost of all materials, labour , T&P etc. complete as per the specification and direction of the Engineer-in-Charge. | 3,562.5 | sqm | 19.36 | ₹68,970 |
| 5 | Providing & laying semi dense bituminous concrete with batch type hot mix plant using crushed aggregates of specified grading premixed with bituminous binder of 60/70 penetration grade of bitumen, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per clause 508 of MOSRT&H Specification for Road & Bridge works | 89.06 | cum | 13,596.42 | ₹12,10,897.17 |
| 6 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads , transporting to site by mechanical means within a lead of 5 kms spreading , grading to required slope and compacting to meet requirment of table 300-2 & clause 305 of MoSRT&H Specification for road & Bridges Work | 59 | cum | 392.02 | ₹23,129.18 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.33 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_599029.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .