Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-AOC C BLOCK 4G YUGA KALPATARU NO 18 PILLAYAR KOIL STREET PADIKUPPAM ROAD KOYAMBEDU CHENNAI 600 107 | CHENNAI | TAMIL NADU | 600107 | ₹7.4 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹7.4 LRejected-AOC | ₹7.4 L | L2 | Rejected-AOC L2 bidder |
| Sl No | Description | Qty | Unit | SRI SELLIAMMAN AND CO L1 | M/s. Sundaramandco L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. | 164 | Cum | 199 ₹32,636 Lowest | 200 ₹32,800 |
| 2.00 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) including all the cost and conveyance of materials to work site and including all labour charges for filling in layers not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 21 | Cum | 1,740 ₹36,540 Lowest | 1,745 ₹36,645 |
| 3.00 | Plain Cement Concrete 1:5:10 (one part of cement, five part of Crushed Stone Sand (M- Sand) and Ten part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 21 | Cum | 5,615 ₹1,17,915 Lowest | 5,620 ₹1,18,020 |
| 4.00 | Centering charges for plain cement concrete works including all the hire and labour chrages form works and including removal of all the labour charges for removal of form works etc complete asper standard specification | 306 | sqm | 732 ₹2,23,992 Lowest | 740 ₹2,26,440 |
| 5.00 | Plain Cement Concrete 1:2:4 (One part of Cement, Two part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials from an approved quarry to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 41 | cum | 6,778 ₹2,77,898 Lowest | 6,780 ₹2,77,980 |
| 6.00 | Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 77 | sqm | 626 ₹48,202 Lowest | 630 ₹48,510 |
Tender Value
₹9 L
EMD Value
₹9,000
Closing Date
6 Feb 2026, 3:00 pmClosed
The Commissioner, Tambaram Corporation
1, Muthuranga Mudali St, West Tambaram, Tambaram, Chennai, Tamil Nadu 600045
Construction of Strom Water Drain in Srinivasapuram 2nd street in Ward 05 at Pammal Zone No 1 TCMC
2026_DMA_648932_10
4875/2025/E1/Z1
Open Tender
Civil Works
Item Rate
Zone No.01
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,000
8 Aug 2026
30 Jan 2026
6 Feb 2026
30 Jan 2026
6 Feb 2026
30 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. | 164 | Cum | - | - |
| 2 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) including all the cost and conveyance of materials to work site and including all labour charges for filling in layers not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 21 | Cum | - | - |
| 3 | Plain Cement Concrete 1:5:10 (one part of cement, five part of Crushed Stone Sand (M- Sand) and Ten part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 21 | Cum | - | - |
| 4 | Centering charges for plain cement concrete works including all the hire and labour chrages form works and including removal of all the labour charges for removal of form works etc complete asper standard specification | 306 | sqm | - | - |
| 5 | Plain Cement Concrete 1:2:4 (One part of Cement, Two part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials from an approved quarry to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 41 | cum | - | - |
| 6 | Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 77 | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_778010.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_778010.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].