Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-Finance 143 SHASTRI NAGAR LAKHIMPUR KHERI | ₹2.2 Cr | L1 | Accepted-Finance LOWEST |
| 2 | L2₹2.3 Cr+₹10.8 L (4.96%)Rejected-Finance | ₹2.3 Cr+₹10.8 L (4.96%) | L2 | Rejected-Finance HIGH RATE BIDDER |
| Sl No | Description | Qty | Unit | M/S P.K ENTERPRISES L2 | M/s Nav Bharat Construction L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in all type of soil with back filling & proper disposal of surplus earth including all lead & lift, levelling, dressing and manual compaction etc. required for proper completion of work. | 1,784.93 | M3 | 101 ₹1,80,277.93 | 85 ₹1,51,719.05 Lowest |
| 2.00 | Earth work in filling for making coffer dam, ring bund, dowla, ramp in all type of soil including all lead & lift, levelling, proper dressing and manual compaction etc. required for proper completion of work. | 5,014 | M3 | 101 ₹5,06,414 | 100 ₹5,01,400 Lowest |
| 3.00 | Laying P.C.C 1:3:6 with cement, Hamirpur coarse sand and 20 to 40mm Kabrai stone ballast with mixing, laying, ramming including cost of all material, labour, T&P etc. required for proper completion of work. | 246.34 | M3 | 8,500 ₹20,93,890 | 8,075 ₹19,89,195.5 Lowest |
| 4.00 | Supplying & laying Geo textile sheet 200 GSM woven multifilament polypropylene yarn on slope with pegs including all cost of material, labour, T&P etc required for proper completion of work. | 7,043.36 | M2 | 100 ₹7,04,336 | 90 ₹6,33,902.4 Lowest |
| 5.00 | Stone masonry work in 1:3 C.M with cement, Hamirpur coarse sand and 20cm X 20cm X 15cm approx. size. Mirzapur cut stone including cost of all material, labour, T&P etc. required for proper completion of work. | 751.32 | M3 | 8,000 ₹60,10,560 | 7,420 ₹55,74,794.4 Lowest |
| 6.00 | Supplying & laying Mirzapur cut stone boulder 25kg to 60kg of approx. size 20cm X 20cm X 15cm manually placed & closely packed in pitching including preparation of subbase, all cost of material, labour T&P etc required for proper completion of work. | 2,387.79 | M3 | 4,800 ₹1,14,61,392 | 4,490 ₹1,07,21,177.1 Lowest |
| 7.00 | Earth work in removing cofferdam / Ring bund in all type of soil and proper disposal including all lead & lift, levelling, dressing, manual compaction etc required for proper completion of work. | 4,640 | M3 | 75 ₹3,48,000 Lowest | 85 ₹3,94,400 |
| 8.00 | Grouting of stone boulder pitching in 1:3 with cement and coarse sand including cost of all material, labour, T&P etc. required for proper completion of work. | 7,856.1 | M2 | 151 ₹11,86,271.1 Lowest | 175 ₹13,74,817.5 |
| 9.00 | Dewatering for excavation of foundation & c.c work with all cost of power, P.O.L, machines, pump, well point system and operator etc with assembly and disassembly of machines etc required for proper completion of work. | 10,744 | KwH | 33.57 ₹3,60,676.08 Lowest | 40 ₹4,29,760 |
Tender Value
₹2.7 Cr
EMD Value
₹5.4 L
Closing Date
3 Aug 2026, 3:00 pmClosed
SUPERINTENDING ENGINEER
IX CIRCLE IRRIGATION WORKS BAHRAICH
Stone pitching works in upstream and downstream of bridges constructed in between Km 1.600 to km 6.280 on Rapti Main Canal in District Shrawasti.
2026_UPIDC_1167986_18
01/SE-IX/2026-27
Open Tender
Civil Works
Item Rate
270 days
BHINGA, SHRAWASTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,205
₹5.4 L
IX CIRCLE IRRIGATION WORKS BAHRAICH
11 Sept 2026
13 Jul 2026
3 Aug 2026
13 Jul 2026
3 Aug 2026
13 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation in all type of soil with back filling & proper disposal of surplus earth including all lead & lift, levelling, dressing and manual compaction etc. required for proper completion of work. | 1,784.93 | M3 | 114.5 | ₹2,04,374.49 |
| 0.0 | Earth work in filling for making coffer dam, ring bund, dowla, ramp in all type of soil including all lead & lift, levelling, proper dressing and manual compaction etc. required for proper completion of work. | 5,014 | M3 | 142.5 | ₹7,14,495 |
| 0.0 | Laying P.C.C 1:3:6 with cement, Hamirpur coarse sand and 20 to 40mm Kabrai stone ballast with mixing, laying, ramming including cost of all material, labour, T&P etc. required for proper completion of work. | 246.34 | M3 | 10,221 | ₹25,17,841.14 |
| 0.0 | Supplying & laying Geo textile sheet 200 GSM woven multifilament polypropylene yarn on slope with pegs including all cost of material, labour, T&P etc required for proper completion of work. | 7,043.36 | M2 | 120.5 | ₹8,48,724.88 |
| 0.0 | Stone masonry work in 1:3 C.M with cement, Hamirpur coarse sand and 20cm X 20cm X 15cm approx. size. Mirzapur cut stone including cost of all material, labour, T&P etc. required for proper completion of work. | 751.32 | M3 | 9,310.45 | ₹69,95,127.29 |
| 0.0 | Supplying & laying Mirzapur cut stone boulder 25kg to 60kg of approx. size 20cm X 20cm X 15cm manually placed & closely packed in pitching including preparation of subbase, all cost of material, labour T&P etc required for proper completion of work. | 2,387.79 | M3 | 5,347.62 | ₹1,27,68,993.56 |
| 0.0 | Earth work in removing cofferdam / Ring bund in all type of soil and proper disposal including all lead & lift, levelling, dressing, manual compaction etc required for proper completion of work. | 4,640 | M3 | 129.55 | ₹6,01,112 |
| 0.0 | Grouting of stone boulder pitching in 1:3 with cement and coarse sand including cost of all material, labour, T&P etc. required for proper completion of work. | 7,856.1 | M2 | 237.6 | ₹18,66,609.36 |
| 0.0 | Dewatering for excavation of foundation & c.c work with all cost of power, P.O.L, machines, pump, well point system and operator etc with assembly and disassembly of machines etc required for proper completion of work. | 10,744 | KwH | 59.9 | ₹6,43,565.6 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
LOT18.pdf
Tender Documents • 5.19 MB
BOQ_2190720.xls
BOQ • 0.27 MB
BOQ_2190720.xls
PDF • 0.31 MB
DATE.pdf
PDF • 0.26 MB
BOQ18.xls
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .