Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹47.2 LAccepted-AOC CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹47.2 L | L-1 | Accepted-AOC L-1, Bidder |
| Sl No | Description | Qty | Unit | GE POWER INDIA LIMITED L1 |
|---|---|---|---|---|
| 1.00( As per tender schedule) | ||||
| 1.01 | Visual Inspection and assessment of Boiler Pressure Part Components of ABL make 210 MW Boiler Unit No.1 of PH-I, SGTPS, MPPGCL, Birsinghpur
By Site Visit of 05 experts for Tentative total 05 days at Site for Visual Inspection and assessment of Boiler Pressure Part.
(Total:-05 Days at Site work + 02 days for travelling for each engineers) | 1 | LS | 40,00,000 ₹47.2 L |
Tender Value
₹47.2 L
Closing Date
10 Sept 2024, 3:00 pmClosed
SE(PNW) SGTPS
SGTPS MPPGCL Birsinghpur
Assessment of extent of damage/deterioration in ABL make 210 MW Boiler Unit No.1 of PH I SGTPS MPPGCL Birsinghpur
2024_MPPGC_367992_1
2024_MPPGC_367992
Single
Miscellaneous Works
5 days
SGTPS BIRSINGHPUR
Not Applicable
13 documents required · 13 mandatory
₹0
Exempted
16 Feb 2026
5 Sept 2024
11 Sept 2024
5 Sept 2024
10 Sept 2024
5 Sept 2024
( As per tender schedule)
Visual Inspection and assessment of Boiler Pressure Part Components of ABL make 210 MW Boiler Unit No.1 of PH-I, SGTPS, MPPGCL, Birsinghpur By Site Visit of 05 experts for Tentative total 05 days at Site for Visual Inspection and assessment of Boiler Pressure Part. (Total:-05 Days at Site work + 02 days for travelling for each engineers)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid