Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 CrAccepted-AOC MALLAGUNDA | ₹2.6 Cr Quoted ₹2.8 Cr | L1 | Accepted-AOC L1 bidder and the negotiated rate is less than the SoR for the year 2025-26 |
| 2 | L2₹2.9 Cr+₹7.6 L (2.71%)Rejected-Finance 15A2 1 INTUC 5 SANKARANKOVIL ROAD RAJAPALAYAM TALUK VIRUDHUNAGAR DISTRICT 626 117 | VIRUDHUNAGAR | TAMIL NADU | 626117 | ₹2.9 Cr+₹7.6 L (2.71%) | L2 | Rejected-Finance Higher margin rate. |
| Sl No | Description | Qty | Unit | RAM CONSTRUCTIONS L2 | LAKSHMI CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00Dismantling of Existing Structures like culverts, bridges and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. | |||||
| 2.00Removal of Existing Bed Level Causeway | |||||
| 3.00 | For PCC | 123.6 | Cum | 572 ₹70,699.2 | 557 ₹68,845.2 Lowest |
| 4.00 | Earthwork Excavation in all Classes of Soil Except Hard Rock Requiring Blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for Dressing the Bed upto Sill Level. | 559.55 | Cum | 144 ₹80,575.2 | 140 ₹78,337 Lowest |
| 5.00 | Earthwork Excavation in Soft Rock Not Requirig Blasting Except Hard Rock Requiring Blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for Dressing the Bed upto Sill Level. | 186.52 | Cum | 216 ₹40,288.32 | 211 ₹39,355.72 Lowest |
| 6.00 | Earthwork Excavation in Soft Disintegrated Rock Not Requiring Blasting Except Hard Rock Requiring Blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for (Open Foundation, Cutoff Wall) Under Abutments, Returns & Piers Below Sill Level. | 271.13 | Cum | 682 ₹1,84,910.66 | 664 ₹1,80,030.32 Lowest |
| 7.00 | Earthwork Excavation in Medium Rock & Dense Medium Rock Not Requiring Blasting Except Hard Rock Requiring Blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for (Open Foundation, Cutoff Wall) Under Abutments, Returns & Piers Below Sill Level. | 162.68 | Cum | 1,010 ₹1,64,306.8 | 983 ₹1,59,914.44 Lowest |
| 8.00 | Earthwork Excavation in Medium Rock & Dense Medium Rock Requiring Blasting Except Hard Rock Requiring Blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for (Open Foundation, Cutoff Wall) Under Abutments, Returns & Piers Below Sill Level. | 108.45 | Cum | 1,294 ₹1,40,334.3 | 1,260 ₹1,36,647 Lowest |
| 9.00 | Blasting and Removing the Hard Rock measured in solid in the foundation and removing the blasted stones and stacking the same for pre-measurement at site including the all other labour and incidental charges including the cost of the blasting materials and all other tools and plants employed etc., complete as per standard specifications for (Open Foundation, Cutoff Wall) Under Abutments, Returns & Piers Below Sill Level. | 130.13 | Cum | 2,305 ₹2,99,949.65 | 2,244 ₹2,92,011.72 Lowest |
| 10.00 | Providing and Fixing Dowel Bars with 32mm Steel Rods of 1.5m length Embedded into the Rock to a Depth of 0.9m by providing required depth of holes by drilling the rock in 50mm dia wherever necessary including fixing in position by grouting the embedded portion with CM 1:2 after placing the bars for Sub-Structure of Abutment / Pier / Wing and Top Footing of Open Foundation / Raft Foundation. | 180 | Nos | 1,046 ₹1,88,280 | 1,018 ₹1,83,240 Lowest |
Tender Value
₹2.4 Cr
EMD Value
₹2.6 L
Closing Date
19 Aug 2025, 3:00 pmClosed
The Project Director, DRDA, Virudhunagar Dist
DRDA, Collectorate, Virudhunagar
Construction of Bridge across Pappayanaickenpatti Supply channel along SH-42 road to Pappayanaickenpatti road at Ayannatchiyarkoil Panchayat in Srivilliputhur Block at Virudhunagar District under State Special Assistance Phase-I for the year 2025-26
2025_RDTN_587068_4
DIPR/3980/TENDER/2025
Open Tender
Civil Works - Bridges
Item Rate
365 days
Srivilliputhur Block
Teo Cover System. Refer Tender document.
5 documents required · 5 mandatory
₹0
₹2.6 L
DRDA,Virudhunagar
20 Nov 2025
30 Jul 2025
19 Aug 2025
30 Jul 2025
19 Aug 2025
11 Aug 2025
11 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .