CE / TTPS
Chief Engineer, Tuticorin Thermal Power Station, Tuticorin
TTPS Mech II BM Unit II Boiler Erection testing and commissioning of Silencer for Startup vent in Unit II Boiler
2022_EB_229444_1
CE/TTPS/SE/M-II No.68/2022-2023
Open Tender
Miscellaneous Works
Item Rate
TTPS
As per BQR conditions in NIT
7 documents required · 7 mandatory
₹0
₹6,100
Yes
18 Jan 2023
18 Apr 2022
5 May 2022
18 Apr 2022
4 May 2022
18 Apr 2022
Transporting the Startup vent silencer, pressure reduction unit and structural materials from central stores to site by cutting the plates to the required sizes.
Removing the roof sheet over the boiler at 62m level and side water protection sheets and shifting to safer location.
Erection of the winch at the convenient location at ground level, welding with supports, revealing the wire rope through roof device to the winch and revealing stay wire rope and removal of the supports after completion of work.
Transporting the sliencer structural materials to roof level, fabrication and erection of suitable structures to the ceiling beam and the Startup vent vent pipe by drilling holes to bed plate.
Holding silencer and lifting up to the roof level and positioning at the fabricated structure align and erection and lifting of the pressure reducing unit and welding the eye hangers supports assembling the turn bukles adjusting & aligning
Cutting the Startup vent vent pipe, positioning the pressure reduction units with the silencer edge preparation of the Startup vent vent pipe at the silencer and at the outlet valve and assisting for HP welding.
Providing drain line pipe near the Superheater air vent drain trough including edge preparation and welding including the provision of necessary support to the drain line.
Relaying the roof sheets and weather protection sheets, providing water drop protection sheet over the roof sheets and welding.
Arresting the existing worn out silencer by using derik post, cutting and removal of the supports of existing silencer.
Holding the existing silencer by the electric winch arrangements, remove the supporting ropes of the derik post, lifting down the silencer from 62mtr to 0 mtr level without damaging any equipments in boiler area.
Charges for providing risky platform in Boiler area from 52mtr to 62mtr EL at required locations for replacing the Startup vent silencer work including transportation of materials and dismantling of platform after completion of work.
ARASU CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .