Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L6₹53.9 L+₹4.4 L (8.89%)Accepted-AOC | ₹53.9 L+₹4.4 L (8.89%) | L6 | Accepted-AOC Accepted |
| 2 | L1₹49.5 LRejected-AOC | ₹49.5 L | L1 | Rejected-AOC Rejected |
| 3 | L2₹50.8 L+₹1.3 L (2.66%)Rejected-AOC | ₹50.8 L+₹1.3 L (2.66%) | L2 | Rejected-AOC Rejected |
| 4 | L3₹50.8 L+₹1.3 L (2.67%)Rejected-AOC | ₹50.8 L+₹1.3 L (2.67%) | L3 | Rejected-AOC Rejected |
| 5 | L4₹51.1 L+₹1.6 L (3.33%)Rejected-AOC | ₹51.1 L+₹1.6 L (3.33%) | L4 | Rejected-AOC Rejected |
Tender Value
₹64.8 L
EMD Value
₹64,840
Closing Date
20 Feb 2026, 5:00 pmClosed
Executive Officer Brajrajnagar Municipality
Executive Officer Brajrajnagar Municipality At/Po-Lamtibahal, Ps-Brajrajnagar, Dist-Jharsuguda
Building
2026_ORULB_125611_8
BRJNRM -05/2025-26
Open Tender
Civil Works - Buildings
Percentage
60 days
Brajrajnagar Municipality
Please refer the tender documents
3 documents required · 3 mandatory
₹10,000
₹64,840
Yes
7 Jul 2026
6 Feb 2026
21 Feb 2026
6 Feb 2026
20 Feb 2026
6 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m. Initial lift icluding rough dressing and bracking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m. in depth as per the direction of the engineer-in-charge. | 232.77 | One Cum | 276.89 | ₹64,451.69 |
| 2 | Filling in foundation & plinth with sand watered & rammed (labour only) including cost, conveyance royalty etc., Complete. | 101.88 | One Cum | 985.77 | ₹1,00,430.25 |
| 3 | C.C (1:4:8) using 4cm size hard granite (Hand Broken) metal including cost, conveyance and royalty of all materials, cost of all labour, T&P etc., complete . | 1 | One Cum | 5,386.37 | ₹5,380.98 |
| 4 | CC work of M20 Grade with 20 mm sizeand down graded black hard granite chips including cost, conveyance and royalty of all materials, cost of all labour,T&P etc. complete. A Column Base | 59.48 | One Cum | 6,061.86 | ₹3,60,559.43 |
| 4.1 | B) Plinth Bend | 25.59 | One Cum | 6,061.86 | ₹1,55,123 |
| 4.2 | C) Column | 10.78 | One Cum | 6,061.86 | ₹65,346.85 |
| 4.3 | D) Roof Slab/Beam | 0.92 | One Cum | 6,061.86 | ₹5,576.91 |
| 5 | Providing M.S. reinforcement for R.C.C. work with cutting, bending, binding and tying the grills as per approved design & placing in position including cost conveyance M.S. Rod & binding wire 18 to 20 gauge etc. all complete as per direction of E.I.C. | 82.25 | One Qntl. | 8,876.09 | ₹7,30,058.4 |
| 6 | Providing Fly Ash brick masonary work in C.M (1:6) using 25x12x8cm size fly ash bricks having crushing strength not less than 75 kg/cm2 with lowering & curing including cost, conveyance,royalities & all taxes of materials to work site etc. all complete as per direction of E.I. C. A)Foundatio&plinth | - | One Cum | 5,611.6 | - |
| 7 | Providing Fly Ash brick masonary work in C.M (1:6) using 25x12x8cm size fly ash bricks having crushing strength not less than 75 kg/cm2 with lowering & curing including cost, conveyance,royalities & all taxes of materials to work site etc. all complete as per direction of E.I. C. B)Super structure | 1 | One Cum | 5,649.9 | ₹5,644.25 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.81 MB
BOQ_579944.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .